ACQUATICS FACILITY STUDY City of Vincennes Department of Parks & Recreation Concerns and Problems with Rainbow Beach • Overall image is poor, facility is tired and no longer an attraction. The facility lacks vitality. • Visitors are being lost to other venues. • The condition of the bathhouse is substandard. • Without shade, the oversized concrete pool deck is oppressive in the summer heat. • Pool mechanical system is antiquated and is past its life expectancy. • The concrete deck all around the pools has an irregular surface at expansion joints and settlement cracks. • Water from both the competition and wading pools is circulated through a single circulation pump violating current swimming pool codes. • Maintaining chemical balance for this pool is difficult. • It is reported that the pool loses approximately 1”-2” of water overnight due to leaks in the pool system located under the concrete pool shell. City of Vincennes – Aquatic Facility Study Recommendations 1. Slides and / or Diving Boards 2. Play Apparatus / Structure for all ages 3. Zero Depth Entry 4. Competition / Recreation Combination – Uniqueness of 50 Meter Pool 5. Upgraded Bathhouse 6. Improved Concessions 7. ADA Accessibility 8. Variety of Experiences – Water Basketball, Water Volleyball, Etc. 9. Shade Structures and Lounge Seating 10. Sound System and Wi-Fi 11. Planned Activities and Programs City of Vincennes – Aquatic Facility Study Pool Amenities City of Vincennes – Aquatic Facility Study Slides City of Vincennes – Aquatic Facility Study Zero Depth Entry City of Vincennes – Aquatic Facility Study Shade Structures City of Vincennes – Aquatic Facility Study Play Apparatus City of Vincennes – Aquatic Facility Study Spray Parks City of Vincennes – Aquatic Facility Study Recreation/Competition Combination City of Vincennes – Aquatic Facility Study Bathhouse, Locker Facilities and Party Facilities City of Vincennes – Aquatic Facility Study Options for Rainbow Beach City of Vincennes – Aquatic Facility Study Option A: Addition of a spray park to the existing facility City of Vincennes – Aquatic Facility Study Option A: Addition of a spray park to the existing facility Description and Cost •E x i s t i n g R e c r e a t i on P o o l a n d B a t h h o u s e t o R e m a i n … … … … … … … … . . . . . . . . . . . . . . . . . . . . . … . . . . . . . •R e m o v e e x i s t i n g W a d d i n g P o o l a n d D e c k … … … … … … … … …… … …… … …… … …… … …… . … . $ 0 10,000 •C r e a t e N e w S p l a s h P a r k … … … … … … …… … . . …… … …… … …… … …… … …… … …… … …… … …… $ 1 4 0 , 0 0 0 •P r o v i d e A s s o c i a t e d S i t e I m p r o v e m e n t s … … … …… … …… . … … …… … …… … …… … …… … . …. . . . $ 85,000 Shade Structures, Pavement, Fencing, Etc. •Contractor General Conditions/Overhead & Profit…………………………………………..……….. $ 22,000 Construction Range of Magnitude Budget………………..…………………………….….…….. $ 2 5 7 , 0 0 0 •Add new deck around the existing pool…………………………………………………………….……. $ ????? City of Vincennes – Aquatic Facility Study Option B: Renovation of the existing facility City of Vincennes – Aquatic Facility Study Option B: Renovation of the existing facility Description and Cost •M i n o r R e n o v a t i o n s t o E x i s t i n g B a t h h o u s e . … … … … … … . …. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 100,000 •R e n o v a t io n E x i s t i n g 1 0 L a n e 5 0 M e t e r L a p P o o l … … …… … …. . . . … … …… … …… . . . . . . . . . . . . . $ 1 , 8 0 0 , 0 0 0 •I n f i l l D i v i n g W e l l , C r e a t e N e w S l i d e W e l l , C r e a t e Z e r o D e p t h E n t r y , N e w P o o l F i l t r a t i on & C h e m i c a l S y s t e m s , P i p i n g & E q u i p m e n t •D e m o l i t i o n , N e w E q u i p m e n t B u i l d i n g , M E P , P o o l D e c k , F e n c i n g & S h a d e S t r u c t u r e s … … … … … … . …… … …… . … …… … …… … …… … …… … …… … …… . . … . . . . . . … $ •P r o v i d e N e w W a t e r S l i d e … … … … …… … …… … …… … …… … …… … …… … …… … …… … . . . . . . . $ 810,000 175,000 -$300,000 $ 165,000 •C o n t r a c t o r G e n e r a l C o n d i t i o n s / O v er h e a d & P r o f i t . … … …… … …… … …… … …… … …. . … . $ 305,000 •N e w W a t e r F e a t u r e s / P l a y A p p a r a t u s … … … … …… … …… . … …… … …… … …… … …… . . . … . . Construction Range of Magnitude Budget……….………………………………….........… $ 3 , 3 5 5 , 0 0 0 - $ 3 , 4 8 0 , 0 0 0 City of Vincennes – Aquatic Facility Study Option B.1: Renovation of the existing facility City of Vincennes – Aquatic Facility Study Option B.1: Renovation of the existing facility Description and Cost •M i n o r R e n o v a t i o n s t o E x i s t i n g B a t h h o u s e … … … … … … …. … . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 100,000 •R e n o v a t io n E x i s t i n g 1 0 L a n e 5 0 M e t e r L a p P o o l … … …… … …. . . . … … …… … …… . . . . . . . . . $ 1 , 8 0 0 , 0 0 0 •I n f i l l D i v i n g W e l l , C r e a t e N e w S l i d e W e l l , C r e a t e Z e r o D e p t h E n t r y , N e w P o o l F i l t r a t i on & C h e m i c a l S y s t e m s , P i p i n g & E q u i p m e n t •D e m o l i t i o n , N e w E q u i p m e n t B u i l d i n g , M E P , P o o l D e c k , F e n c i n g & S h a d e S t r u c t u r e s … … … … … … …… … …… … …… … …… … …… … …… … …… … …… … …… . . . $ 810,000 •P r o v i d e N e w W a t e r S l i d e … … … … …… … …… … …… … …… … …… … …… … …… … …… … . . . $ 175,000 -$300,000 •N e w W a t e r F e a t u r e s / P l a y A p p a r a t u s . … … … … …… … …… … …… … …… … …… … …… . . . . $ 165,000 •A d d S p r a y P a r k a n d A s s o c i a t e d S i t e I m p r o v e m e n t s … … … … …… … …… … …… … …… . $ 160,000 •C o n t r a c t o r G e n e r a l C o n d i t i o n s / O v er h e a d & P r o f i t … …… … …… … …… … …… … . . … … $ 321,000 Construction Range of Magnitude Budget………………………………………..…….… $ 3 , 5 3 1 , 0 0 0 - $ 3 , 6 5 6 , 0 0 0 City of Vincennes – Aquatic Facility Study Option C: Construction of a replacement facility City of Vincennes – Aquatic Facility Study Option C: Construction of a replacement facility Description and Cost •M i n o r R e n o v a t i o n s t o E x i s t i n g B a t h h o u s e … … … … … … …… … …… . … . . . . . . . . . . . . . . . . . . . . . $ 100,000 •C r e a t e N e w P o o l … … … … …… … …… … …… … …… … …… … …… … …… . . . . … …… . . . . . . . . . . $ 1 , 2 5 0 , 0 0 0 •E i g h t L a n e – 2 5 Y a r d L a p P o o l , Z e r o D e p t h E n t r y , S l i d e W e l l , N e w P o o l F i l t r a t i on & C h e m i c a l S y s t e m s , Piping & Equipment •D e m o l i t i o n , N e w E q u i p m e n t B u i l d i n g , M E P , P o o l D e c k , F e n c i n g & S h a d e S t r u c t u r e s , e t c … … …… … …… … …… … …… … …… … …… … …… . . … …… … …… . . . $ 740,000 •P r o v i d e N e w W a t e r S l i d e … … … … …… … …… … …… … …… … …… … …… . . . . . . . . . . . . . . . . . . . . .$ 175,000 -$300,000 •N e w W a t e r F e a t u r e s / P l a y A p p a r a t u s … … … … …… . … …… … …… … …. … … …… … …. . . $ 165,000 •C o n t r a c t o r G e n e r a l C o n d i t i o n s / O v er h e a d & P r o f i t … …… … …… … . … …… . . . . . . . . . . . . $ 243,000 Construction Range of Magnitude Budget……………………………....................$ 2 , 6 7 3 , 0 0 0 - $ 2 , 7 9 8 , 0 0 0 City of Vincennes – Aquatic Facility Study Option C.1: Construction of a replacement facility City of Vincennes – Aquatic Facility Study Option C.1: Construction of a replacement facility Description and Cost •M i n o r R e n o v a t i o n s t o E x i s t i n g B a t h h o u s e … … … … … … …… … …… . … . . . . . . . . . . . . . . . . . . . . . $ 100,000 •C r e a t e N e w P o o l … … … … …… … …… … …… … …… … …… … …… … …… . . . . … …… … …… $ 1 , 2 5 0 , 0 0 0 •E i g h t L a n e – 2 5 Y a r d L a p P o o l , Z e r o D e p t h E n t r y , S l i d e W e l l , N e w P o o l F i l t r a t i on & C h e m i c a l S y s t e m s , Piping & Equipment •D e m o l i t i o n , N e w E q u i p m e n t B u i l d i n g , M E P , P o o l D e c k , F e n c i n g & S h a d e S t r u c t u r e s , e t c … … …… … …… … …… … …… … …… … …… … …… . . … …… … …… . . $ 740,000 •P r o v i d e N e w W a t e r S l i d e … … … … …… … …… … …… … …… … …… … …… . . . . . . . . . . . . . . . . . . . $ 175,000 -$300,000 •N e w W a t e r F e a t u r e s / P l a y A p p a r a t u s … . . … … … …… … …… … …… … …. … … …… … …. . $ 165,000 •A d d S p r a y P a r k a n d A s s o c i a t e d S i t e I m p r o v e m e n t s … … … … …… … …… … …… … … $ 160,000 •C o n t r a c t o r G e n e r a l C o n d i t i o n s / O v er h e a d & P r o f i t … …… … …… … . … …… … …… … $ 259,000 Construction Range of Magnitude Budget……………………………....................$ 2 , 8 4 9 , 0 0 0 -$2,974,000 City of Vincennes – Aquatic Facility Study Option C.2: Construction of a replacement facility City of Vincennes – Aquatic Facility Study Option C.2: Construction of a replacement facility Description and Cost •M i n o r R e n o v a t i o n s t o E x i s t i n g B a t h h o u s e … … … … … … …… … …… . … . . . . . . . . . . . . $ •C r e a t e N e w P o o l … … … … …… … …… … …… … …… … …… … …… … …… . . . . … …… 100,000 $ 2,300,000 •E i g h t L a n e – 5 0 M e t e r L a p P o o l , Z e r o D e p t h E n t r y , S l i d e W e l l , N e w P o o l F i l t r a t i on & C h e m i c a l S y s t e m s , Piping & Equipment •D e m o l i t i o n , N e w E q u i p m e n t B u i l d i n g , M E P , P o o l D e c k , F e n c i n g & S h a d e S t r u c t u r e s , e t c … … …… … …… … …… … …… … …… … …… … …… . . … …… . . $ 810,000 •P r o v i d e N e w W a t e r S l i d e … … … … …… … …… … …… … …… … …… … …… . . . . . . . . . . . $ 175,000 -$300,000 •N e w W a t e r F e a t u r e s / P l a y A p p a r a t u s … . . … … … …… … …… … …… … …. … … …. . $ 165,000 •A d d S p r a y P a r k a n d A s s o c i a t e d S i t e I m p r o v e m e n t s … … … … …… … …… … . . $ 160,000 $ 371,000 •C o n t r a c t o r G e n e r a l C o n d i t i o n s / O v er h e a d & P r o f i t … …… … …… … . … …… . . Construction Range of Magnitude Budget…………………………….......... $ 4 , 0 8 1 , 0 0 0 -$4,206,000 City of Vincennes – Aquatic Facility Study Option C.3: Construction of a replacement facility City of Vincennes – Aquatic Facility Study Option C.3: Construction of a replacement facility Description and Cost •C r e a t e N e w P o o l … … … … …… … …… … …… … …… … …… … …… … …… . . . . … …… … $ 2 , 3 0 0 , 0 0 0 •E i g h t L a n e – 5 0 M e t e r L a p P o o l , Z e r o D e p t h E n t r y , S l i d e W e l l , N e w P o o l F i l t r a t i on & C h e m i c a l S y s t e m s , Piping & Equipment •N e w E q u i p m e n t B u i l d i n g , M E P , P o o l D e c k , F e n c i n g & S h a d e S t r u c t u r e s , e t c … … …… … …… … …… … …… … …… … …… … …… . . … …… … . .$ 810,000 •P r o v i d e N e w W a t e r S l i d e … … … … …… … …… … …… … …… … …… … …… . . . . . . . . . . . . . $ 175,000 -$300,000 •N e w W a t e r F e a t u r e s / P l a y A p p a r a t u s … … … … …… . . … …… … …… … …… … …… . . $ 165,000 •A d d S p r a y P a r k a n d A s s o c i a t e d S i t e I m p r o v e m e n t s … … … … …… … …… … …. . $ 160,000 •A d d N e w B a t h h o u s e w i t h C o n c e s s i o n s … … … … … … … … … …… … …… … …… … . $ 625,000 •C o n t r a c t o r G e n e r a l C o n d i t i o n s / O v er h e a d & P r o f i t … …… … …… … . … …… … . . $ 423,000 Construction Range of Magnitude Budget…………………………….............$ 4 , 6 5 8 , 0 0 0 -$4,783,000 City of Vincennes – Aquatic Facility Study Cost Comparison City of Vincennes – Aquatic Facility Study Cost Comparison of Other Facilities Baker Park Pool New Castle, Indiana Year Built Pool S.F. Original Pool Cost 2012 Pool Cost Description 2007 7,546 $999,000 $1,158,000 25 yard pool, zero depth entry, small participatory feature, slide City of Vincennes – Aquatic Facility Study Cost Comparison of Other Facilities Rochelle-Landers Pool Evansville, Indiana Year Built Pool S.F. Original Pool Cost 2009 7,966 $1,152,000 2012 Pool Cost $1,258,000 Description 25 yard pool, zero depth entry, large participatory play feature, tot slide, medium sized slide, spray park features in zero depth entry City of Vincennes – Aquatic Facility Study Cost Comparison of Other Facilities Bethel Park Aquatic Center Indianapolis, Indiana Year Built Pool S.F. Original Pool Cost 2012 Pool Cost Description 2011 6,691 $1,146,000 $1,180,000 25 yard pool, zero depth entry, large participatory play feature, “run-out” slide City of Vincennes – Aquatic Facility Study Questions?