Horizontal Well Artificial Lift Projects Investigation of Multiphase Flow Behavior in Horizontal Gas Wells Rosmer Brito Advisory Board Meeting, August 16, 2012 Outline Objective Introduction Literature Review Study Plan Small Scale Facility Experimental Range Testing Program Instrumentation Near Future Tasks Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Objectives Investigation of Multiphase Flow Characteristics for Horizontal Oil and Gas Wells Experimentally Using a Small Scale Facility (2-in. ID) Theoretically by Developing a Mechanistic Liquid Loading Criterion Investigate Effects of Wells Geometry and Trajectory Development of a Predictive Software Tool Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Introduction United States Shale Gas Plays Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Introduction … U.S. natural gas production, 1990-2035 (trillion cubic feet) Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Hydraulic Fracture in Horizontal Wells Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Water Production In Horizontal Gas Wells 80% Water Used for Hydraulic Fracture Spreads in the Reservoir After Flow Back Below/Above Water Formations Fractures extends to Water Bearing Layers Continues Water Production Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Horizontal Section in Gas Wells Liquid Loading Occurs When Gas Production Declines Associated Liquids are not Lifted Intermittent or No Gas Production HL in the Horizontal Section Impair Production Before Loading is Evident Slug Flow from Horizontal Wellbore to Tubing Liquid Loading is Affected by Well Deviation CSU/SPE 149477 Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Literature Review Turner (1969) Water Production Affects Flow Characteristic of the Wells Liquid Generates Back Pressure Slugging Design: Affects HL and dP/dL Prediction Production: Affects Well Test Results Proposed Physical Models Liquid Film Movement Along the Wall of the Pipe Liquid Droplet Entrainment on the High Velocity Gas Core Comparison with Field Data Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Literature Review … Coleman (1991) Parameters Affecting Liquid Loading Liquids Gravity and Surface Tension Water and Oil are Presented Onset of Loading Tubing ID Pressure Minor Influence Temperature, Gas Gravity and Interfacial Tension Wells that Exhibit Slugging Behavior May not Follow Liquid-Droplet Model Different Transport Mechanism Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Literature Review … Sarica, Shoham and Brill (1991) Flow Behavior in Hilly Terrain Pipelines with Low Gas/Liquid Gravity Dominated Steady or Unsteady Flow Transient Behavior Pipe Geometry Gas Compressibility Rigorous Terrain Slugging Model Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Literature Review … Meng (2001) Gas-Liquid Two-Phase Flow Tests for Inclination Angles of - 2, 0, + 2 in a 2 in. ID Pipe Pressure Gradient is Much Higher Than Single Phase Case Slightly Change in Inclination Angle Affects Liquid Holdup Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Literature Review … Zhang and Sarica (2011) Stratified Flow Low Liquid Loading Gas/Liquid Flow in Horizontal and Slightly Downward Inclined Pipes Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Literature Review … Zhang and Sarica (2011) Flow Patterns: Smooth Interface 2D Waves 3D Waves Roll Waves Entrainment Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Literature Review … Zhang, and Sarica (2011) Upward Inclination HL Qg < Qcritical Transition from SS to SL flow dP/dL Almost All Empirical Correlations are Inadequate for the Predictions of Low Liquid Loading Flow Behavior Mechanistic Models Requires Improvement of Closure Relationships Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Literature Review … Liang-Biao Ouyang (2000) Influence of Influx on Single Phase and Multiphase Wellbore Flow Experiments 1993-1997 100-ft (30.5 m)-Long Horizontal Wellbore Axial Flow and Radial Influx Different Wellbore IDs, Gravel Packs, Perforation Types and Densities Pressure Drop Prediction Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Literature Review … Most of These Studies were Focused on Horizontal Pipes Complex Configurations (Undulations) have not been Investigated in Majority of Studies Horizontal Well Artificial Lift Projects Knowledge in Horizontal Wells Multiphase Flow is Limited Multiple Fluid Entry Locations have not been Considered Advisory Board Meeting, August 16, 2012 Study Plan Experimental Design and Construct a Versatile Facility Perform Testing Based on Prioritized Schedule Model Development for Prediction Loading and Flow Conditions Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Small Scale Facility Overall Cost ~ $50,000 Two Months of Construction Time Facility will be Ready by Nov. 1st, 2012 Low Modification Effort Quick Results Preliminary Results can be Utilized for Large Scale Loop Design and Instrument Selection and Location Some Artificial Lift Methods can also be Tested Needs to Be Identified Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 6 Small Scale Facility … 40’ ( 240D ) C8 5 2 ’’ 4 C7 C3 C2 C6 3 2 ’’ 2 PT1 1 C5 DP2 2 ’’ C4 DP1 TTW Water Tank Control Valve CVW Quick Closing Valve Camera 1 C1 No Intrusive Capacitance Sensor Horizontal Well Artificial Lift Projects Submergible Pump Coriolis Meter MMW 2 ’’ Advisory Board Meeting, August 16, 2012 6 Experimental Range … 40’ ( 240D ) C8 5 2 ’’ 4 C7 C3 C2 C6 3 2 ’’ 2 PT1 1 C5 DP2 2 ’’ C4 DP1 TTW Water Tank Control Valve CVW Quick Closing Valve Camera 1 C1 No Intrusive Capacitance Sensor Horizontal Well Artificial Lift Projects Submergible Pump Coriolis Meter MMW 2 ’’ Advisory Board Meeting, August 16, 2012 Experimental Range … Flow Pattern Map (= -1) Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 6 Experimental Range … 40’ ( 240D ) C8 5 2 ’’ 4 C7 C3 C2 C6 3 2 ’’ 2 PT1 1 C5 DP2 2 ’’ C4 DP1 TTW Water Tank Control Valve CVW Quick Closing Valve Camera 1 C1 No Intrusive Capacitance Sensor Horizontal Well Artificial Lift Projects Submergible Pump Coriolis Meter MMW 2 ’’ Advisory Board Meeting, August 16, 2012 Experimental Range … Flow Pattern Map (= 0) Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 6 Experimental Range … 40’ ( 240D ) C8 5 2 ’’ 4 C7 C3 C2 C6 3 2 ’’ 2 PT1 1 C5 DP2 2 ’’ C4 DP1 TTW Water Tank Control Valve CVW Quick Closing Valve Camera 1 C1 No Intrusive Capacitance Sensor Horizontal Well Artificial Lift Projects Submergible Pump Coriolis Meter MMW 2 ’’ Advisory Board Meeting, August 16, 2012 Experimental Range … Flow Pattern Map (= +1) Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Testing Program Static Liquid Tests qLin=0 Liquid Volume, VL>0 Dynamic Liquid Tests qLin>0 Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Static Tests Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Static Tests Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Static Tests Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Static Tests Superficial Gas Velocity Gas Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Static Tests Gas Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Static Tests … Gas Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Dynamic Tests VSW=0.003 m/s – 0.03 m/s VSG=0.3 m/s –16 m/s Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Dynamic Tests … Determine Multiphase Flow Characteristics for Undulating Section Flow Pattern Pressure Drop Liquid Holdup Water Blockage Phenomena Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Instrumentation Clamp on Capacitance Sensor Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Instrumentation … Quick Closing Valve System P2 T2 PRESURRIZED VESSEL V2 AIR P1 T1 QCV V1 WATER Horizontal Well Artificial Lift Projects TEST SECTION Advisory Board Meeting, August 16, 2012 Instrumentation … Flow Pattern Observation Flow Pattern Evaluation Videos in the Inlet, Undulating and Vertical Section by Utilizing Outdoor Surveillance Cameras High Speed Camera Will be Connected to the Undulating Section Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Instrumentation … Film Flow Direction Wall Shear Stress Sensor Wall Shear Stress Measurement Near Wall Flow Direction Indicator Commercial Device for Direct Wall Shear Stress Measurement Lenterra RealShear™ F - Series Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Near Future Tasks Completion of Construction of the Facility (November 2012) Testing Starting in November 2012 Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Thanks … Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Questions Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012