RAJASTHAN STATE ROAD DEVELOPMENT CONSTRUCTION & CORPORATION LTD. JAIPUR MANGALWAR – NIMBAHERA (MDR-11A) Development of Project on BOT (Annuity) Model 1 PROJECT LOCATION 2 PROJECT LOCATION 3 NECESSITY v v v v v v Better access to Stones mines of the area to rest of State. Better roads for transportation of materials to & from Cement plants i.e. J.K.Cement-Nimbahera, Birla Cement, Vikram Cement, etc. established in the region providing better opportunity for their expansion. Comfortable present connectivity between Mangalwar and Nimbahera via Nikumbh which is the shortest route to connect Kandla Port to Central India (M.P.) like Indore and Ratlam, Bhopal etc. Road, if improved shall form life line of Badi Sadri & Nimbahera Assembly Constituency which is spread from Mangalwar to Nimbahera. Improved Business activities shall further the cause of social advancement of the area. economic and Shall provide a link from NH 79 to NH 76. 4 NECESSITY 1) Mangalwar & Nimbahera are the Busy towns and they need faster & effective connectivity by Road. 2) Commercial traffic is available due to Cement Production & other Industrial activities 3) Number of Sharp Horizontal & Vertical Curves has be redesigned as per Guidelines of IRC. 4) Widening & Strengthening of Carriageway from 1.5 Lane to 2 Lane with Hard Shoulder is required. 5) This road is existing Toll Road and the concession period is ending by March 2012. The Concessionaire is RSRDCC. 5 PROJECT PROPOSAL 1) 2 Lane Carriageway with Hard Shoulder is Proposed. 2) Chikdra & Minana Bye Pass is proposed of approx. 4.25 km. 3) Widening of Culverts to 12.0m ROW. 4) All Horizontal & Vertical Curves shall be designed as per designated speed with all the requirements of Highway Design and make them correct. 5) Paved Shoulder after 14 years. 6 BYE PASS AT CHIKADRA REQUIRED 7 BYE PASS AT MINANA REQUIRED 8 MANGALWAR JUNCTION 9 NIMBAHERA TOWN 10 EXISTING SCENARIO (DETAILS OF CARRIAGEWAY) Road Section Length (Km) Existing carriageway (m) Remarks MANGALWAR NIMBAHERA (MDR-11A) (Km 0 - Km 40) 40.00 5.5 M Carriageway with Hard Shoulder (No renewal proposed in Existing BOT) TOTAL 40.00 Km 11 EXISTING SCENARIO (DETAILS OF HABITATIONS) ROAD SECTION VILLAGES / TOWNS Mangalwar (Km 1/000) Chikarda (Km 12/000) Mangalwar – Nimbahera (MDR-11A) (Km 0 - Km 40) Napawali (Km 17/000) Nikumbh (Km 20/000) Minana (Km 22/000) Dooriya (Km 29/000) Dinwa (Km 34/000) Nimbahera (Km 40/000) No Level Crossing is on the route. 12 PROPOSAL FOR ROAD IMPROVEMENT ROAD SECTION Mangalwar – Nimbahera (MDR – 11A) (Km 0/000 - Km 40/000) TRAFFIC 4064 PCU 766 CVD PROPOSAL Trengthening & Widening of C/W with Hard Shoulder. Bye Pass of Chikadra & Minana Proposed. 13 PROPOSED ROAD CROSS SECTIONS 14 PROPOSED ROAD CROSS SECTIONS 15 STRIP PLAN 16 ESTIMATES 17 ABSTRACT OF COST OF DEVELOPMENT (WITHOUT PAVED SHOULDER) S. No. Particulars Estimated Cost (Rs. In Crores) 21.49 1. Improvement of Existing Road 2. CD Works (including new Culverts ) 1.54 3. ROB 0.00 4. CC Road 0.68 5. Bye Passes 6.97 6. Road Furniture 1.19 7. Road Work for Toll Plaza 4.36 8. Toll Plaza 0.57 9. Lay bye’s 0.00 10. Public Utility Services 0.46 11. Landscaping & Tree Plantation 0.50 Total Cost 33.68 18 ABSTRACT OF COST OF DEVELOPMENT S. No. Particulars Estimated Cost (Rs. In Crores) 122.89 13. Base Cost Add: 10% Escalation for 2 year 14. Tender Premium @ 10% 3.36 15. Cost of contingencies 5% 1.68 16. Quality Control (1%) 0.34 17. Guarantee Commission to State Govt. (1%) 0.34 18. Cost of Land Acquisition 0.94 Sub Total 40.34 19. A & F Charges (10%) 4.03 20. Application Fee and Front end fee (0.5%) 0.20 Sub Total 44.57 Interest during construction 1.78 Grand Total 46.35 21. 0.00 19 ABSTRACT OF COST OF MAJOR MAINTENANCE S. No. Particulars Treatment Estimated Cost (Rs. In Crores) in respective year Major Maintenance without Paved Shoulders 1. Renewal Cost 7h Year 40mm BC 10.48 2. Strengthening Cost 14th Year 50 DBM + 40mm BC 43.08 + 87.53 (Paved Shoulder at 14th Year) 20 FINANCIAL ANALYSIS 21 TRAFFIC SCENARIO (7 DAYS CVC 21/05/10 TO 28/05/10) Census Point Mangalwar – Nimbahera PCU 4649 Tractor Car /Jeep Buses Trolly Cat. 1(b) Cat. 2 98 884 95 Trucks Trucks >5 Multi <5 T T Axle Cat. 3(a) Cat. 3(b) Cat. 4 336 103 232 22 %AGE OF TOLLABLE TRAFFIC Tractor Trolley Car /Jeep (Commercial Cat. 1(b) Use) Cat. 1(a) 0% 50% Buses Cat. 2 50% Trucks <5 T Trucks >5 T Cat. 3(a) Cat. 3(b) 70% Multi Axle Cat. 4 70% 70% Assumed traffic growth per year 5% 23 TOLLABLE ROUTES Road Section Length (Km) Mangalwar - Nimbahera 38.50 24 TOLLABLE TRAFFIC Tractor Trolly Car Trucks <5 Buses Trucks >5 T Multi Axle Road Section (Commerc /Jeep T Cat. 2 Cat. 3(b) Cat. 4 ial Use) Cat. 1(b) Cat. 3(a) Cat. 1(a) Mangalwar Nimbahera (73.90 km) 0 467 59 208 64 143 25 TOLL PLAZA LOCATIONS LOCATION TOLLABLE LENGTH (KM) RAOD SECTION Km. 1/600 38.50 Nimbahera At Km 29/400 38.50 Dooria 26 SUMMARY OF PROPOSAL Construction Period – 1 Years 0 Months Repayment Period – 19 Years 0 Months Concession Period – 20 Year 0 Months Annuity Model with Toll Annuity – 4.50 Crores 27 SUMMARY OF PROJECT S. No. Particulars Detail 1 Length of road 40.0 Km 2 Design Life 20 Years 3 Project Cost Rs. 46.35 Crores 4 Construction Period 1 Years 0 months 5 Tollable Period 19 Years 0 months 6 Concession Period 20 Years 0 months 7 Rate of Interest 11.75% 8 Toll Plaza 2 Nos. 39 MODELS OF PPP 29 ANNUITY WITH TOLL S. No. Description 1. Without Paved Shoulder initial and Paved Shoulder at 14th Year Initial Cost Annuity (Cr) (Cr.) 46.35 4.50 3.50 Viability Viable RECOMMENDATION Annuity Model with Toll Collection shall be adopted. Toll Shall not be charged by Car & Public Transport. Only Commercial Vehicles like LCV’s , Trucks shall be charged. Initially 2 Lane road without paved shoulder. 2 Lane with Paved Shoulder shall be after 14 Years. Construction Period Repayment Period Concession Period – 1 Years 0 Months – 19 Years 0 Months – 20 Year 0 Months 30 THANKS 43 31 32 33 MODELS OF PPP 34 BOT S. No. Description 1. Without Paved Shoulder initial and Paved Shoulder at 12th Year 2. With Paved Shoulder initially Initial Cost (Cr.) Major Maintenance 46.35 32.07 – 7th 184.52 – 14th Non Viable 45.31 – 7th 129.51 – 14th Non Viable 211.87 Viability 30% VGF (20% CENTRAL + 10% - O&M - STATE GOVT.) S. N. Description Without Paved Shoulder 1. initial and Paved Shoulder at 14th Year 2. With Paved Shoulder initially Initial Cost IRR in (Cr.) 20 Years 174.80 211.87 DSCR Viability < 2.0 0.21 Non Viable < 1.0 0.09 Non Viable TOLLABLE TRAFFIC - COMPARISON Tractor Trolly Car Trucks <5 Buses Trucks >5 T Multi Axle Road Section (Commerc /Jeep T Cat. 2 Cat. 3(b) Cat. 4 ial Use) Cat. 1(b) Cat. 3(a) Cat. 1(a) Phalodi – Osian (73.90 km) 0 348 48 139 96 21 Osian Jodhpur (46.0 Km) 0 585 116 238 87 25 35 DETAILS OF PROPOSED WORK & DEFECT LIABILITY PERIOD S. No. Stretch Year & Description 1 Km 57/0 to Km 91/0 2014 (Widening) 2 Km 69/0 to Km 70/0 2014 (Widening) 3 Km 81/0 to Km 89/0 CRF Tender Due 4 Km 63/0 to Km 74/0 CRF Tender Due 5 Km 118/0 to Km 122/0 Proposal for Jodhpur Bye – Pass 36