Karnataka State Horticulture Mission Agency (R), Lalbagh, Bangalore nhmkarnataka@gmail.com Glimpse of Horticultural Sector in Karnataka • Area and production of horticulture crops is around 21.16 lakhs ha. and 205.15 lakhs tons, respectively, with an average productivity of about 9.70 tons per hectare. • The state is one of the key players in fruits, vegetables, floriculture, plantation crops, spices and so on. • Over Rs. 1100.00 cr. annual income from horticulture sector in the state • Horticulture sector is an important source of livelihood for as many as 12.50 lakhs farm families in the state. • Annual growth rate is seen to be higher at around 6%. KSHMA AREA AND PRODUCTION Area (000 Ha) Production (000 Tons) Productivity (Tons /ha) Fruit Crops 360.00 5963.00 16.55 Vegetables 437.00 7063.00 16.17 Spice crops 266.50 1097.00 4.12 Plantation crops 27.00 1955.00 7.29 Commercial flowers 200.00 16.20 10.79 Medicinal plants 20.00 0.30 1.76 Aromatic plants 805.50 4420.00 0.55 2115.50 20514.50 Crop Total KSHMA Project Overview of Karnataka State : Bangalore (Rural), Kolar, Tumkur, Chitradurga, Dakshina Kannada, Kodagu, Udupi, Mysore, Belgaum, Bijapur, Bagalkot, Gulbarga, Hassan, Koppal, Uttara Kannada, Chikkamagalur, Shimoga, Dharwad, Bellary, Chamarajnagar, Bidar, Ramnagar, Chikkaballapura, Raichur, Haveri, Gadag, Davangere, Mandya, Bangalore (U) & Yadgir (30) : Oct. 2005 – March 2012 DISTRICTS NHM PROJECT PERIOD YEAR No. of NHM Districts 2005 – 06 2006 – 07 2007 – 08 15 2 4 2008 – 09 3 2009 – 10 5 2010– 11 1 Total 30 (6 Dists under PM’s Package) KSHMA SUCCESS STORY 1. NURSERY: Hassan District Nandanam Nursery established under NHM in private sector promoted by Sri UnniKrishnan and Smt.Jaya Nair in Palya Hobli of Alur taluk in Hassan district has set an example for their hard work, skill and expertise in nursery techniques. Nandamam Nursery is situated on Bangalore-Mangalore Highway and easily accessable to farmers. The Nursery produces 2,00,000 quality planting materials of fruits and flower plants in a year. Assistance from NHM have helped the couple to set up a cement pot manufacturing units, Vermicompost unit, 7000 Sqft of lawn and other facilities like labour quarters for skilled laborers engaged etc. Availability of planting materials through out the year has helped the farmers. KSHMA 2. MULCHING : Chamarajanagar District Puttaswamy S/o Madappa, Yadapura, Chamarajanagara Tq is a progressive vegetable grower. Last year he had grown about 4 acres of watermelon without mulching and got an average yield of 15 tons / acre. Later with the intervention of department of Horticulture, he started using Plastic Mulching for growing Watermelon. Now with Mulching he has taken an average yield of 30 ton / acre. With mulching sheet he has got an additional yield of 50 % which is really an outstanding result. This has made other farmers to adopt Mulching for Horticulture Crops especially in dry regions, by which they can expect additional yield and it may increase their economic level also. KSHMA 3. PACK HOUSE : Chamarajanagar District Kum. Sneha D/o Ravibabu, Thimmegowdana playa, Santhemaralli hobli, Chamarajanagara Tq. is having totally 1.74 Ha. and her family is having totally 300 acres of land in which they are cultivating Banana, Papaya, Pomegranate, Mango, Guava etc., and they are exporting these crops to neighboring states like Tamilnadu, Andra Pradesh, Kerala etc. Through the Department of Horticulture they were guided regarding the availability of subsidy for structure like Pack houses and insisted them to construct Pack house, so they can pack and grade in a hygienic and systematic way, by which they can even obtain a good export returns also. So they constructed the pack house according to our guidance and now they are using this structure for packing and grading of Pomegranate, Guava, Mango crops in a systematic way. Now the unit is working in a good way and they have extended their area and started constructing another pack house for better use. KSHMA SWOC ANALYSIS Strength • NRCs Strong resource base coupled with favorable agro climatic conditions for horticultural crops. • Adequate nursery and seed infrastructure. • Premier institutions such as Bio center under state department of horticulture, IIHR, IFAB, CIMAP, CFTRI, DFRL, UHS, NRCs etc., • Crop specific Agri Export Zones (AEZs). • Five food parks – well spread across the state. • No. of processing industries for pineapple, tomato, mango, wine grapes, gherkins. • Exclusive administrative set-up for horticulture sector in the state. • The sector identified as thrust area. • Major marketing institutions such as KHF, HOPCOMS, Safal, and private players like Namdharis, Reliance, Food World etc. • Adoption of model APMC Act. • High productivity in crops like mango, tomato etc., KSHMA SWOC ANALYSIS Weakness – Un-utilized potential in terms of productivity. – Inadequate irrigation facilities – Depleting ground water levels. – Highly perishable crops and requirement of intensive care. – Commercial horticulture is yet to take strong roots. – Lack of regulatory mechanism for planting materials. – Inadequate farm mechanization and PHM. – Logistical deficiencies. – Strong linkage of farms with market is yet to make inroad KSHMA SWOC ANALYSIS Opportunities • Increasing demand for horticultural produce/ products. • Untapped domestic and also export market. • Barren land can be utilized. • Enormous scope for yield enhancement through rejuvenation/ HYVs. • Huge scope for value addition. • Huge public sector investment. • Transformation towards hi-tech practice by farmers. • Untapped direct marketing opportunities. • Abundant scope for creation of marketing infrastructure. KSHMA SWOC ANALYSIS Challenges • Fragmented and small land holdings, water, labour availability for expansion of the sector. • Pests, diseases, and climatic factors. • Inadequate and inconsistent power supply. • Urbanization and higher migration from rural area to city centers. • Price fluctuations and gluts. • Mismatch between cost of production and price realisation. KSHMA Summary of Action Plan : 2012-13 The total financial outlay envisaged for the year 2012-13 is Rs.14500.00 lakhs. The share of the GOI and the GOK would be around Rs.12325.00 respectively. lakhs (85%) and Rs.2175.00 (15%) In the total outlay, the project based components account for Rs.6780.15 lakhs with a share of 46.76%. The rest to the tune of Rs.7719.85 lakhs with a share of 53.24%. earmarked for the implementable components. The total progress for 2011-12 (upto end of 20th Mar 2012) is Rs. 12082.37 lakhs. KSHMA Financial (Rs. in Lakh) Sl. No Activity 1. Production & Productivity 2. Post Harvest Management & Marketing 3. Mission Management 4. 5. Expenditure (Provisional as on 20-03-2012) Proposed Outlay AAP 2012-13 % Outlay 2012-13 10049.69 10528.15 72.61 1435.93 2867.05 19.77 550.00 724.70 5.00 Publicity & Propaganda 23.75 55.00 0.40 Innovation 23.00 325.10 2.24 12082.37 14500.00 Total 100.00 In the total outlay, Production and Productivity related activities would constitute about 72.61 %. Other key components such as PHM and Marketing would receive their share of 19.77 %. KSHMA Physical (quantifiable major outputs) for 2012-13 Sl. No Activity Ha. Sl. No 1. Additional coverage of area 17468 6. New Nurseries 32 2. Rejuvenation 4743 7. Water Resources 410 3. INM/IPM 45000 8. Training of farmers 4. Protected cultivation 1054 9. Mechanization 632 5. Organic farming 2764 10. PHM & Marketing 1124 •Total 71029 Activity •Total No 15353 17551 The quantifiable major outputs comprises production related, PHM, marketing and other components. KSHMA Area, production & productivity target for 2012-13 (For selected crops) Sl. No Crop Area (000 ha) Production (000 tons) Productivity (tons/ ha) 1. Fruits (Perennials) 7358 132.45 18.00 2. Fruits (Non-Perennials) 4718 188.72 40.00 3. Spices 1687 8.44 5.00 4. Flowers 1656 19.87 12.00 5. Aromatic Plants 40 4.00 1.00 6. Plantation crops 2010 16.08 8.00 17469 266.16 Total Projected growth rate of selected horticultural crops in 2012 - 13: Area: 1 - 2% Production and productivity: 2 % to 5%. With NHM scheme intervention, above horticultural crops prospect expected to turn better during the year. KSHMA Objectives Key objective - Ensuring sustainable growth in area, production and productivity of horticultural crops through promotion of better cultivation practices and creation of suitable PHM and marketing infrastructure. Specific objectives: To create suitable plantation infrastructure across the state on a crop cluster basis, To bring down the post harvest loss by creating suitable primary and secondary processing infrastructure, To establish comprehensive marketing infrastructure for horticultural produce, To cope up with unforeseen requirements for organic growth in the sector, To connect polices and programmes for the development of production and marketing system of horticultural produce. KSHMA Approach By identifying suitable crop cluster and also by strengthening the existing clusters, and connecting them cohesively with the processing centers and the market, it is possible to bring the sector into sustainable developmental ambit. With this background and also experiences gained and difficulties encountered in implementation of the scheme so far, a comprehensive strategy for the year 2012-13 has been chalked out, besides continuing the same further for the next two years. KSHMA Strategies Empowerment of farmers’ associations at crop clusters Involvement of various institutions/ agencies / NGOs / Farmers association in the implementation of the program Convergence of other schemes with NHM program Address the current problem of lower allocations on key components such as PHM and marketing KSHMA Thrust areas It is the time now to show the route to the farmers that how and where he can sell the produce and get a remunerative price In this context, we need to give higher priority for building the processing and the marketing infrastructure. There is also a need for empowering farmers associations at cluster levels for better implementation of scheme KSHMA Factors considered to earmark outlay for districts The bench mark district wise data on area, production and productivity for the base year 2004-05 and subsequent 5 years. SWOC analysis of each district in terms of the sector growth, future need and also implementation progress so far besides felt needs. Physical and financial performance of the district in the last 7 years. Views and suggestions of various stakeholders such as farmers, entrepreneurs, processors, extension organizations and various thought leaders. workers, research KSHMA New Horticulture area brought under NHM Since inception Area in 1000 ha. S.No. Crops Area Before NHM Additional area brought under NHM 1 Mango 121.46 39.04 2 Pomegranate 10.98 8.08 3 Sapota 22.96 11.94 4 Citrus 11.30 3.50 5 Grapes 10.27 7.16 6 Banana 56.41 39.31 7 Pineapple 2.78 1.71 8 Papaya 3.57 0.87 9 Cashew 67.079 13.84 10 Cocoa 2.718 5.33 KSHMA Area covered under National Horticulture Mission since inception Mango KSHMA > 3000 Ha. Kolar (5531), Tumkur, Dharwad, Ramanagar, Belgaum (3210) 1000 to 3000 Ha. Chitradurga (2388) Shimoga, Bangalore Rural, UK, Chikmagalur, Haveri Chikballapur, Hassan (1114) < 1000 Ha. Mysore (932), Koppal, Gulbarga, Bidar, Davanagere, Raichur, Bellary, Chamarajanagar, Gadag, Mandya, Bagalkote, Banagalore Urban, Bijapur, yadagiri (50) Area covered under National Horticulture Mission since inception Grapes KSHMA > 1000 Ha. Bijapur (2669), Belgaum (1196) 250 to 1000Ha. Bangalore Rural (763), UK, Chikkaballapura, Bagalkote, Gulbarga (254) < 250 Ha. Kolar (212), Koppal, Bidar, Bellary, Bangalore Urban, Gadag (12) Area covered under National Horticulture Mission since inception Pomegranate KSHMA > 1000 Ha. Koppal (3895) 250 to 1000Ha. Bagalkote (836), Chitradurga, Raichur, tumkur, Bijapur (656) < 250 Ha. Bellary (233), Bidar, Belgaum, Davanagere, Gulbarga, Gadag (17) Area covered under National Horticulture Mission since inception Sapota KSHMA > 1000 Ha. Bellary (3497), Chitradurga, Hassan (1092) 250 to 1000Ha. Tumkur (940), Kolar, Mysore, Chikmagalur, Haveri, Shimoga, Bangalore Rural, Mandya, Belgaum 264) < 250 Ha. Bagalkote (230), Ramanagar, Dharwad, Gadag, Chikkaballapur, Raichur, Gulbarga, Koppal, Chamarajanagara, Davanagere, Bijapur, Bidar, UK (37) Area covered under National Horticulture Mission since inception Citrus KSHMA > 500 Ha. Bijapur (801), Chitradurga, Kodagu (506) 250 to 500Ha. Raichur (491), Bellary (311) < 250 Ha. Bidar (215), Gulbarga, Tumkur, Yadagiri, Koppal, Davanagere, Gadag, Chikmagalur (410) Area covered under National Horticulture Mission since inception Fig Bellary (403 Ha.) KSHMA Area covered under National Horticulture Mission since inception Banana KSHMA > 3000 Ha. Belgaum (3796), Shimoga, Chitradurga, Chamarajanagara, Tumkur (3000) 1000to 3000Ha. Chikmagalur (1971), Bangalore Rural, Bagalkote, Hassan, Mysore, Bijapur, Kolar, Koppal, Bellary, Gulbarga, Ramanagara (1122) < 1000 Ha. UK (948), DK, Kodagu, Davanagere, Chikkballapur, Bidar, Mandya, udupi, Dharwad, Haveri, Bangalore Urban, Raichur, Gadag, Yadagiri (33) Area covered under National Horticulture Mission since inception Pineapple KSHMA > 500 Ha. UK (792), Shimoga (655) < 500 Ha. Udupi (193), DK (66) Action Plan for Promotion of Crop Clusters To strengthen the crop clusters, collection, grading & packing, primary processing at the field level and linking these clusters with market will be given priority during 2012-13. Empowering of “farmers’ associations” at crop clusters would assist to promote the cluster approach. Hence following activities would be carried out: Empowering of farmers groups at the cluster levels, Promotion of primary processing at the filed level and linking clusters with the processing infrastructure Carrying out awareness programmes, Offering crop advisory service and market information service. KSHMA Component wise proposed outlay for 2012-13 Innovative Components 2.24 % Mission Management 5.00 % Special Intervention for Mitigation of Publicity & Propaganda BBD for 0.38 % Pomogranate PRODUCTION OF PLANTING MATERIALS 4.69 % TOTAL AEP Pere, Non-Pere, Flowers, Aromatic, Spices & Plantation). 21.98 % PHM & Marketing 19.77 % HRD 2.70 % FLD 0.14 % MECHANIZATION 2.86 % BEEKEEPING 0.49 % TOTAL MAINTAINANCE (Pere, Non-Pere & Plantation). MUSHROOMS 10.12 % ORGANIC FARMING 4.26 % PRONMATION INM / IPM & LABS 3.72 % PROTECTED CULTIVATION 14.62% REJUVENATION 4.91 % CREATION OF WATER RESOURCE 2.12% KSHMA KARNATAKA STATE HORTICULTURE MISSION AGENCY (R) Component Wise Details KSHMA Requirement & Availability of Planting Materials for the year 2012-13 Availability Requirement for 2012-13 Sl. No. Crops 1 (No. in lakhs) Physical (Ha.) No. of plants (lakhs) Dept. Pvt. Mango 4565 7.30 4.00 3.10 2 Grapes 675 16.88 10.00 6.80 3 Pomegranate 423 1.17 - 1.17 4 Sapota 810 1.26 4.39 - 5 Citrus Group 810 2.24 7.50 - 6 Fig 25 0.07 0.05 0.10 7 Banana(TC) 2456 73.68 15.00 112.00 8 Banana(suckers) 1182 29.55 - 29.55 9 Pepper 1282 17.59 40.00 - 10 Cashew 460 0.72 5.40 - 11 Cocoa 1550 6.20 5.20 1.00 14238 156.66 91.54 153.72 GRAND TOTAL KSHMA ABSTRACT OF AAP 2012 – 13 UNDER NHM ( Rs. in Lakhs) in -Lakhs) PROPOSED OUTLAY(Rs. 2012 13 Sl. No Components 1 NURSERIES 2 VEGETABLE SEED PRODUCTION 3 IMPORT OF PLANTING MATERIAL 4 SETTING UP OF TC LAB 5 ESTABLISHMENT OF NEW GARDENS 6 MAINTENANCE 7 REJUVENATION 8 CREATION OF WATER RESOURCES 9 PROTECTED CULTIVATION 10 PROMOTION INM/IPM 11 ORGANIC FARMING 12 HRD 13 BEEKEEPING 14 MECHANIZATION 15 FRONT LINE DEMONSTRATION 16 PHM & MARKETING 17 MISSION MANAGEMENT 18 INNOVATIVE COMPONENTS GRAND TOTAL Phy Fin 32 255 1 9 17468 26541 4743 410 1053.51 45003 2764 15353 9079 632 5 1124 3 140.63 76.00 5.00 459.00 3187.25 1466.95 711.45 307.20 2119.78 540.00 617.20 392.21 70.90 414.60 20.00 2867.05 779.70 325.10 124476 14500.00 KSHMA ANNUAL ACTION PLAN FOR THE YEAR 2012-13 SL No. COMPONENT UNIT (HA/ NO) STATE TOTAL REVISED ACTION PLAN (2011-12) PROPOSED TARGET (2012-13) 3 PHY. 4 FIN. 5 PHY. 6 FIN. 7 i) Model Nursery (4ha) (Rs.25.00) Nos 2 50.00 1 25.00 ii) Small Nursery (1ha) (Rs.6.25) Nos 2 50.00 1 25.00 1 2 B PLANTATION INFRASTRUCTURE & DEVELOPMENT 1 Production of Planting Material a) Public sector SUB TOTAL b) Private Sector i) Model Nursery (4ha) (Rs.12.50) Nos 4 50.00 2 25.00 ii) Small Nursery (1ha) (Rs.3.125) Nos 16 50.00 29 90.63 SUB TOTAL 20 100.00 31 115.63 TOTAL - Nursery 22 150.00 32 140.63 2 200.00 c) Setting up of new TC Units i) Public Sector (Rs.100.00) ii) Private Sector Nos TOTAL 4 137.89 7 259.00 4 137.89 9 459.00 KSHMA STATE TOTAL SL No. COMPONENT UNIT (HA/ NO) REVISED ACTION PLAN (2011-12) PROPOSED TARGET (2012-13) 3 PHY. 4 FIN. 5 PHY. 6 FIN. 7 i) Public Sector (Rs.0.50/ha) Ha 25 12.50 49 24.50 ii) Private Sector (Rs.0.25/ha) Ha 180 45.00 206 51.50 205 57.50 255 76.00 2 10.00 1 5.00 2 10.00 1 5.00 1 192.94 1 22.05 TOTAL 2 214.99 TOTAL - Production of Planting Materials 235 570.38 297 680.63 1 2 d) Seed Production TOTAL e) Import of planting material for trial & demonstration purpose i) Public Sector (State Dept.) Nos ii) Private Sector (Grower Section) (Rs.5.00) Nos TOTAL f) Seed infrastructure i) Public Sector Nos ii) Private Sector KSHMA 2 SL No. COMPONENT UNIT (HA/ NO) 1 2 3 Establishment of new gardens (Area expansion) 1) Fruits Perennials - New Area Expansion a. Mango 8m x 8m (Rs.0.1544) (156 Plants/ha) 9m x 9m (Rs.0.1217) (123 Plants/ha) 10m x 10m (Rs.0.099) (100 Plants/ha) SUB TOTAL b. Grapes 3m x 3m (Rs.0.30) (1110 Plants/ha) 5m x 5m (Rs.0.216) (400 Plants/ha) SUB TOTAL c. Pomegranate (Rs.0.18) (400 Plants/ha) SUB TOTAL d. Sapota 8m x 8m (Rs.0.1544) (156 Plants/ha) 9m x 9m (Rs.0.1217) (123 Plants/ha) 10m x 10m (Rs.0.099) (100 Plants/ha) SUB TOTAL e. Citrus Group (Sweet Orange, Coorg Mandarin, Lime, etc) - 6m x 6m (Rs.0.15) (278 Plants/ha) f. Fig 5m x 5m (Rs.0.18) (400 Plants/ha) g. Guava 6m x 6m (Rs.0.09/ha) SUB TOTAL (e., f. & g.) TOTAL - Fruits Perennials AEP STATE TOTAL REVISED ACTION PLAN (2011-12) PROPOSED TARGET (2012-13) PHY. 4 FIN. 5 PHY. 6 FIN. 7 2943 1510 660 5113 557 165 722 388 388 523 299 337 1159 454.39 194.55 65.34 714.27 167.10 28.90 196.00 69.98 69.98 72.47 38.54 32.10 143.11 3015 745 805 4565 400 275 675 423 423 380 160 270 810 465.52 90.67 79.70 635.88 120.00 59.40 179.40 76.05 76.05 58.67 19.47 26.73 104.87 Ha 1393 204.71 810 121.50 Ha Ha 25 4.50 1418 8800 209.21 1332.57 25 50 885 7358 4.50 4.50 130.50 1126.70 Ha Ha Ha Ha Ha Ha Ha Ha Ha KSHMA STATE TOTAL SL No. 1 COMPONENT 2 2) I - Year Maintenance Fruits Perennials a. Mango 8m x 8m (Rs.0.0515/ha) 9m x 9m (Rs.0.0406/ha) 10m x 10m (Rs.0.033/ha) SUB TOTAL b. Grapes 3m x 3m (Rs.0.10/ha) 5m x 5m (Rs.0.072/ha) SUB TOTAL c. Pomegranate (Rs.0.06/ha) SUB TOTAL d. Sapota 8m x 8m (Rs.0.0515/ha) 9m x 9m (Rs.0.0406/ha) 10m x 10m (Rs.0.033/ha) SUB TOTAL e. Citrus Group (Sweet Orange, Coorg Mandarin, Lime, etc) (Rs.0.05/ha) f. Fig 5m x 5m (Rs.0.06/ha) SUB TOTAL (e. & f.) TOTAL - 1st year Maint. Fruits Perennials UNIT (HA/ NO) REVISED ACTION PLAN (2011-12) PROPOSED TARGET (2012-13) PHY. 4 FIN. 5 PHY. 6 FIN. 7 4303 965 1500 6768 762 134 896 334 334 580 89 213 882 221.51 41.47 49.49 312.47 76.20 7.83 84.03 20.04 20.04 29.92 3.82 7.00 40.74 2943 1510 660 5113 557 165 722 388 388 523 299 337 1159 151.56 61.31 21.78 234.65 55.70 11.88 67.58 23.28 23.28 26.93 12.14 11.12 50.19 Ha 420 21.00 1393 69.65 Ha 25 445 9326 1.50 22.50 479.77 25 1418 8800 1.50 71.15 446.86 3 Ha Ha Ha Ha Ha Ha Ha Ha Ha KSHMA STATE TOTAL SL No. COMPONENT 1 2 UNIT (HA/ NO) REVISED ACTION PLAN (2011-12) PROPOSED TARGET (2012-13) PHY. FIN. PHY. FIN. 3 4 5 6 7 Ha Ha Ha 8975 605.88 8975 990 605.88 66.76 990 574 574 1864 66.76 38.68 38.68 125.83 1864 125.83 5077 859 709 6644 885 12 897 334 334 772 62 44 878 261.48 34.86 23.38 319.72 88.50 0.86 89.36 20.02 20.02 39.74 2.52 1.45 43.71 Ha 1009 68.11 388 19.38 Ha 23 1032 13434 1.55 69.66 906.81 25 413 9165 1.50 20.88 493.70 31560 2719.15 25323 2067.25 3) II - Year Maintenance Fruits Perennials a. Mango 8m x 8m (Rs.0.0515/ha) 9m x 9m (Rs.0.0406/ha) 10m x 10m (Rs.0.033/ha) SUB TOTAL b. Grapes 3m x 3m (Rs.0.10/ha) 5m x 5m (Rs.0.072/ha) SUB TOTAL c. Pomegranate (Rs.0.06/ha) SUB TOTAL d. Sapota 8m x 8m (Rs.0.0515/ha) 9m x 9m (Rs.0.0406) 10m x 10m (Rs.0.033) SUB TOTAL e. Citrus Group (Sweet Orange, Coorg Mandarin, Lime, etc) (Rs.0.05) f. Fig 5m x 5m (Rs.0.06) SUB TOTAL (e. & f.) TOTAL - 2nd year Maint. Fruits Perennials TOTAL - Fruits Perennials AEP, 1st & 2nd year Maint. Ha Ha Ha KSHMA SL No. COMPONENT UNIT (HA/ NO) 1 2 3 Fruits - Non Perennials (New AEP) (75 : 25) a. Banana (TC) 1.8m x 1.8m (Rs.0.312) (3086) 2m x 2m (Rs.0.25275) (2500) b. Banana (Suckers) (Rs.0.16875) (2500) c. Banana Inter Crop in Arecanut Gardens (Rs.0.16875) (2500) SUB TOTAL - Banana d. Pineapple (Suckers) (Rs.0.24375) (3086) e. Papaya (Rs.0.225) SUB TOTAL (d. & e.) TOTAL - Non Perennials AEP 5) I - Year Maintenance Non Perennials (75 : 25) a. Banana (TC) - 1.8m x 1.8m (Rs.0.104) 2m x 2m (Rs.0.08425) Banana (Suckers) (Rs.0.05625) Banana Inter Crop in Arecanut Gardens (Rs.0.05625) SUB TOTAL - Banana b. Pineapple (Rs.0.08125) c. Papaya (Rs.0.075) SUB TOTAL (b. & c.) TOTAL - 1st year Maint. TOTAL - Non Perennials AEP and Maint. STATE TOTAL REVISED ACTION PLAN (2011-12) PHY. FIN. 4 5 PROPOSED TARGET (2012-13) PHY. FIN. 6 7 4) Ha Ha 1757 392 1123 548.21 98.64 189.51 1991 465 1167 621.19 117.53 196.95 Ha 154 26.26 15 2.53 3426 140 773 913 4339 862.61 34.13 173.94 208.06 1070.67 3638 250 830 1080 4718 938.20 60.94 186.75 247.69 1185.89 2313 196 599 240.56 16.51 33.70 3108 337 295 632 3740 8079 290.77 27.36 22.13 49.49 340.26 1410.93 1757 392 1123 154 3426 140 773 913 4339 9057 182.73 33.03 63.17 8.66 287.59 11.38 57.98 69.35 356.94 1542.82 Ha Ha Ha Ha Ha Ha Ha KSHMA STATE TOTAL SL No. COMPONENT REVISED ACTION PLAN (2011-12) PROPOSED TARGET (2012-13) PHY. FIN. PHY. FIN. 3 4 5 6 7 (i) SMF (Rs.0.35) Ha 108 37.80 76 26.67 (ii) Others (Rs.0.231) Ha 168 38.72 147 33.93 276 76.52 223 60.60 1 III UNIT (HA/ NO) 2 Area Expansion of Flowers (a) Cut flowers SUB TOTAL (b) Bulbulous flowers (i) SMF (Rs.0.45) Ha 168 75.60 166 74.52 (ii) Others (Rs.0.297) Ha 220 65.34 216 64.15 388 140.94 382 138.67 SUB TOTAL (c) Loose Flowers (i) SMF (Rs.0.12) Ha 675 81.00 448 53.78 (ii) Others (Rs.0.0792) Ha 1025 81.18 603 47.76 SUB TOTAL 1700 162.18 1051 101.54 TOTAL - AEP Flowers 2364 379.64 1656 300.81 KSHMA SL No. COMPONENT UNIT (HA/ NO) 1 2 3 IV) STATE TOTAL REVISED ACTION PLAN (2011-12) FIN. 5 PHY. 6 FIN. 7 185 185 23.13 23.13 70 60 130 8.75 7.50 16.25 777 315 50 30 40 75 110 1397 1582 155.40 63.00 10.00 6.00 8.00 15.00 22.00 279.40 302.53 1182 100 236.40 20.00 100 25 125 25 1557 1687 20.00 5.00 25.00 5.00 311.40 327.65 Ha 5 1.88 Ha 50 55 6.25 8.13 40 40 5.00 5.00 Area Expansion of Seed Spices and Rhizomatic Spices (Rs.0.125) a.) Rhizomatic Spices - i) Ginger ii) Turmeric Ha SUB TOTAL PHY. 4 PROPOSED TARGET (2012-13) b. Area Expansion of Perennial spices (Rs.0.20) V i. Pepper ii. Pepper Inter Crop in Arecanut Gardens i. Cinnamon ii. Clove iii. Clove in Areca Gardens iv. Nutmeg v. Nutmeg Inter Crop in Arecanut Gardens SUB TOTAL TOTAL - Spices Aromatic Plants (a) Cost intensive aromatic plants (Patchouli, Gerenium & Rosemary) (b) Other aromatic plants (Rs.0.125) TOTAL - Aromatic Plants Ha Ha Ha Ha Ha KSHMA STATE TOTAL SL No. COMPONENT REVISED ACTION PLAN (2011-12) PROPOSED TARGET (2012-13) PHY. FIN. PHY. FIN. 3 4 5 6 7 a. Cashew Ha 1025 123.00 460 55.20 b. Cocoa Ha 1215 145.80 1400 168.00 535 64.20 150 18.00 2775 333.00 2010 241.20 1 VI UNIT (HA/ NO) 2 1) Plantation crops 60:20:20 (Rs.0.12) c. Cocoa Inter Crop in Arecanut Gardens SUB TOTAL 2) I - Year Maintenance 60:20:20 (Rs.0.04) a. Cashew Ha 637 25.48 1025 41.00 b. Cocoa Ha 839 33.56 1215 48.60 535 21.40 c. Cocoa Inter Crop in Arecanut Gardens SUB TOTAL 1st Year Maint. 1476 59.04 2775 111.00 3) II - Year Maintenance - (Rs.0.04) a. Cashew Ha 718 24.23 640 25.58 b. Cocoa Ha 800 27.00 822 32.88 SUB TOTAL 2nd Year Maint. 1518 51.23 1462 58.46 TOTAL of Plantation crops AEP, 1st & 2nd Year Maint. 5769 443.27 6247 410.66 KSHMA STATE TOTAL SL No. COMPONENT PROPOSED TARGET (2012-13) FIN. PHY. FIN. 3 4 5 6 7 a. Mango Ha 1645 246.75 2745 411.75 b. Citrus Group (Lime, Coorg Mandarin, Orange, etc) Ha 235 35.25 873 130.95 c. Cashew Ha 155 23.25 100 15.00 d. Pepper Ha 772 115.75 1025 153.75 e. Areca Nut (YLD) Ha 2483 372.45 5290 793.45 4743 711.45 18 72.00 2 Rejuvenation/ replacement (Rs.0.15) TOTAL - Rejuvenation 4 REVISED ACTION PLAN (2011-12) PHY. 1 3 UNIT (HA/ NO) Creation of Water resources (a) Community tank (Rs.4.00) (b) Water harvesting system for individuals- for storage of water in 20 x 20 x 3 m ponds /wells (Rs.0.60) TOTAL - Water resources Nos 535 322.20 392 235.20 535 322.20 410 307.20 KSHMA STATE TOTAL SL No. COMPONENT 1 5 2 UNIT (HA/ NO) 3 REVISED ACTION PLAN (2011-12) PHY. 4 FIN. 5 PROPOSED TARGET (2012-13) PHY. 6 FIN. 7 0.50 36.63 Protected cultivation 1. Green House structure (a) Fan & Pad system 1000 Sqm (Rs.73.25 per ha.) Ha (b) Naturally ventilated system (i) Tubular structure 1000 Sqm (Rs.46.75 per ha.) (ii) Wooden / Granite structure 500 Sqm (Rs.25.75 per ha.) SUB TOTAL Ha 17.00 794.75 24.31 1136.48 Ha 5.50 141.59 7.70 198.28 22.50 936.34 32.51 1371.38 2. Plastic Mulching 2 Ha / beneficiary (Rs.0.10) Ha 414.00 41.40 715.00 71.50 414.00 41.40 715.00 71.50 Ha 5.00 150.00 6.20 186.00 Ha 5.15 106.42 9.80 200.90 Ha 0.36 5.38 10.51 261.80 16.00 386.90 100.00 100.00 290.00 290.00 SUB TOTAL 100.00 100.00 290.00 290.00 TOTAL - Protected Cultivation 547.01 1339.54 1053.51 2119.78 SUB TOTAL 3. Shade Net House (i ) Tubular structure 1000 Sqm (Rs.30.00 per ha.) (ii) Wooden / Granite structure 200 Sqm (Rs.20.50 per ha.) (iii) Bamboo structure 200 Sqm (Rs.15.00 per ha.) SUB TOTAL 4. Anti Bird/Anti Hail Nets 5000 Sq.m (Rs.1.00 per ha.) Ha KSHMA STATE TOTAL SL No. 1 7 8 COMPONENT 2 Promotion INM / IPM (a) Promotion of IPM (Rs.0.01 per ha.) (b) Promotion of INM (Rs.0.01 per ha.) SUB TOTAL Bio-Control lab - Private Sector Plant Health Clinic - Public Sector Leaf/Tissue analysys lab - Public Sector SUB TOTAL TOTAL - INM / IPM & Labs Organic Farming Adoption of Organic Conversion - 3rd year (Rs.0.03) Adoption of Organic Certification - 3rd year (Rs.0.04) Adoption of Organic Conversion - 1st year (Rs.0.04) Adoption of Organic Certification - 1st year (Rs.0.03) SUB TOTAL (iii) Vermi Compost Units (Rs.0.30 per ha.) (iv) Bio Digester Unit (Rs.0.30 per ha.) SUB TOTAL TOTAL - Organic Farming UNIT (HA/ NO) 3 Ha Ha REVISED ACTION PLAN (2011-12) PHY. 4 FIN. 5 PHY. 6 FIN. 7 28720 21280 50000 2 287.20 212.80 500.00 45.00 2 50002 45.00 545.00 24450 20550 45000 1 1 1 3 45003 244.50 205.50 450.00 50.00 20.00 20.00 90.00 540.00 8609 8609 258.27 344.36 400 400 800 805 1159 1964 2764 16.00 12.00 28.00 241.50 347.70 589.20 617.20 Nos Nos Ha Ha Nos Nos PROPOSED TARGET (2012-13) 17218 550 500 1050 18268 602.63 165.00 150.00 315.00 917.63 KSHMA STATE TOTAL SL No. 1 10 COMPONENT UNIT (HA/ NO) 3 FIN. 5 PHY. 6 FIN. 7 Pollination support through beekeeping (a) Honey bee colony (50 colonies / beneficiary) (Rs.0.007) (b) Hives (50 colonies / beneficiary) (Rs.0.008) Nos 4760 33.32 4460 31.22 Nos 4785 38.28 4575 36.60 (c) Equipment including honey extractor (4 frame), food grade container (30 kg), net, etc. (1 set / beneficiary) (Rs.0.07) Nos 55 3.85 44 3.08 1 2.00 9601 77.45 9079 70.90 Nos 49 29.40 132 39.60 Nos 150 225.00 500 375.00 199 254.40 632 414.60 9 36.00 5 20.00 9 36.00 5 20.00 2 TOTAL - Pollination Support 12 PROPOSED TARGET (2012-13) PHY. 4 (d) Production of Nuclear stock - Public 11 REVISED ACTION PLAN (2011-12) Horticulture Mechanization (a) Power Machines (upto 20 BHP) with rotavator / equipment) (1 set / beneficiary) (Rs.0.30) (b) Power machines (20 HP & above) including accessories/ equipments (1 set / beneficiary) (Rs.0.75) TOTAL - Mechanization (a) Technology Dissemination through demonstration/ Front Line Demonstration (FLD) (75% cost in farmers field) (Project Based) (Rs.4.00 / FLD) - Public TOTAL - FLD Nos KSHMA SL No. COMPONENT UNIT (HA/ NO) 1 2 3 13 Human Resource Development (HRD) (a) Training of farmers (i) Within the District (Rs.0.004 per day) SUB TOTAL (b) Exposure visit of farmers (i) Within the State (Rs.0.006 X 5 days = Rs.0.03) (ii) Outside the State (Rs.0.0065 X 5 days = Rs.0.0325) (iii) Outside India (project based) (Rs.3.00 lks. per farmer) SUB TOTAL (c) Training / study tour of technical staff/ field functionaries (i) Within the State (Rs.0.002 X 5 days = Rs.0.01) (ii) Study tour to progressive States/units (group of minimum 5 participants) (Rs.0.0065 X 5 days = Rs.0.0325) (iii) Outside India (100% of the cost on actual basis) (Rs.5.00 lks. per farmer) (iv) HRD for Supervisors / Gardners (Spill over work) SUB TOTAL TOTAL - HRD STATE TOTAL REVISED ACTION PLAN (2011-12) PROPOSED TARGET (2012-13) PHY. 4 FIN. 5 PHY. 6 FIN. 7 Nos 12613 12613 50.45 50.45 10440 10440 41.76 41.76 Nos 2302 34.53 3060 91.80 Nos 2389 71.67 1530 49.73 Nos 50.00 100.00 4691 156.20 4590 241.53 Nos 65 0.65 70 0.70 Nos 150 4.88 253 8.22 Nos 40.00 1 216 17520 15.00 60.53 267.18 100.00 323 15353 108.92 392.21 KSHMA STATE TOTAL SL No. COMPONENT 1 2 C UNIT (HA/ NO) 3 REVISED ACTION PLAN (2011-12) PROPOSED TARGET (2012-13) PHY. FIN. PHY. FIN. 4 5 6 7 361 541.50 702 1053.00 1 6.00 INTEGRATED PHM 1. Pack house/ On farm collection & storage unit (unit Nos of the size of 9 x 6m) (Rs.1.50 lks) 2. Pre-cooling unit (as a Credit Linked Back Ended subsidy@ 40% of the cost of project) Nos 3. Refer vans/ containers (Rs.9.60) Nos 5 10.00 3 28.80 4. Primary / Mobile/ processing unit (Rs.9.60) Nos 112 447.84 144 1382.40 5. Ripening chamber Nos 3 205.64 2 19.20 6. Cold Storage Nos 1 118.40 3 186.50 7. Low cost onion storage structure (25 MT) (50%) (Rs.0.50) Nos 100 50.00 229 114.50 582 1373.38 1084 2790.40 TOTAL - PHM KSHMA SL No. COMPONENT UNIT (HA/ NO) 1 2 3 D ESTABLISHMENT OF MARKETING INFRASTRUCTURE FOR HORTICULTURAL PRODUCE 1. Wholesale markets (as Credit linked back ended) Nos 2. Retail Markets / outlets (environmentally controlled) (as Nos Credit linked back ended @ 40%) (Rs.4.00) 3. Static/Mobile Vending Cart/platform with cool chamber Nos (@ 50%) (Rs.0.15) STATE TOTAL REVISED ACTION PLAN (2011-12) PHY. FIN. 4 5 1 50 102.50 7.50 4.Functional Infrastructure: for collection, sorting, grading, Nos packing etc (as Credit linked back ended @ 40%) (Rs.6.00) E F G TOTAL - Marketing Mission Management Mission Management (Seminors, Conferences, Workshops, Exhibitions, Kissan Mela, Horticulture Shows etc.) TOTAL Innovative Components: 1 Spill Over Works 2 Conservation, Propogation & Maintiance of Anthurium House at Lalbagh, Bangalore TOTAL GRAND TOTAL PROPOSED TARGET (2012-13) PHY. FIN. 6 7 2 40.00 5 20.00 31 4.65 2 12.00 40 76.65 724.70 51 110.00 562.99 15 43.75 55.00 15 2 606.74 23.00 2 779.70 75.10 1 250.00 2 23.00 3 325.10 152265 12500.00 124476 14500.00 KSHMA KARNATAKA STATE HORTICULTURE MISSION AGENCY (R) Component wise Details KSHMA STATE PROGRESS UP TO 20th March 2012 UNDER NHM FOR THE YEAR 2011-12 (Karnataka State) (Rs. in lkahs) STATE TOTAL Sl No UNIT (HA/ NO) COMPONENT PROGRESS (Upto FEB-12 ) PHY. FIN. PHY. FIN. 3 4 5 8 9 Nos 2 2 50.00 50.00 2 2 50.00 50.00 * i) Model Nursery (4ha) Nos * ii) Small Nursery (1ha) Nos 4 16 20 22 50.00 50.00 100.00 150.00 4 9 13 15 47.55 27.55 75.10 125.10 4 4 137.89 137.89 4 4 137.89 137.89 1 2 B PLANTATION INFRASTRUCTURE & DEVELOPMENT 1 ANNUAL TARGET Production of planting material a) Public sector * i) Model Nursery (4ha) SUB TOTAL b) Private Sector SUB TOTAL TOTAL c) Setting up of new TC Units * ii) Private Sector Nos TOTAL KSHMA d) Seed Production * i) Public Sector Ha 25 12.50 25 12.50 * ii) Private Sector Ha 180 45.00 180 45.00 205 57.50 205 57.50 2 10.00 2 10.00 2 10.00 2 10.00 1 192.94 1 192.94 1 22.05 1 22.05 2 214.99 2 214.99 TOTAL e) Import of planting material for trial & demonstration purpose * i) Public Sector (State Dept.) Nos * ii) Private Sector (Grower Section) Nos TOTAL f) Seed infrastructure * i) Public Sector Nos ii) Private Sector TOTAL KSHMA 2 I 1) Establishment of new gardens (Area expansion) Fruits - New Area Expansion a. Mango 8m x 8m Ha 2943 454.39 2943 454.39 9m x 9m 1510 194.55 1510 194.55 10m x 10m 660 65.34 660 65.34 5113 714.27 5113 714.27 557 167.10 557 167.10 165 28.90 165 28.90 722 196.00 722 196.00 388 69.98 388 69.98 388 69.98 388 69.98 523 72.47 523 72.47 9m x 9m 299 38.54 299 38.54 10m x 10m 337 32.10 337 32.10 1159 143.11 1159 143.11 1393 204.71 1393 204.71 1393 204.71 1393 204.71 25 4.50 25 4.50 25 4.50 25 4.50 8800 1332.57 8800 1332.57 SUB TOTAL b. Grapes 3m x 3m Ha 5m x 5m SUB TOTAL c. Pomegranate Ha SUB TOTAL d. Sapota 8m x 8m Ha SUB TOTAL e. Citrus Group (Sweet Orange, Coorg Mandarin, Lime, etc) - 6m x 6m SUB TOTAL Fig 5m x 5m SUB TOTAL TOTAL Ha KSHMA 2) a. Mango I - Year Maintenance 8m x 8m 9m x 9m 10m x 10m Ha 4303 965 1500 6768 762 134 896 334 334 580 89 213 882 420 420 25 25 9326 221.51 41.47 49.49 312.47 76.20 7.83 84.03 20.04 20.04 29.92 3.82 7.00 40.74 21.00 21.00 1.50 1.50 479.77 4342 1002 1183 6526 748 134 883 323 323 568 82 195 845 358 358 15 15 8950 223.37 43.48 38.94 305.79 74.84 7.83 82.67 19.40 19.40 29.23 3.52 6.15 38.90 17.91 17.91 0.90 0.90 465.58 Ha Ha Ha Ha 8975 990 574 1864 605.88 66.76 38.68 125.83 8850 980 687 1800 597.38 66.15 46.35 121.50 e. Citrus Group (Sweet Orange, Coorg Mandarin, Lime, etc) Ha 1009 68.11 969 65.40 f. Fig Ha 23 13434 22760 1.55 906.81 1386.58 23 13309 22258 1.55 898.32 1363.90 SUB TOTAL b. Grapes 3m x 3m Ha 5m x 5m SUB TOTAL c. Pomegranate- 5m x 5m Ha SUB TOTAL d. Sapota 8m x 8m Ha 9m x 9m 10m x 10m SUB TOTAL e. Citrus Group (Sweet Orange, Coorg Mandarin, Lime, etc) SUB TOTAL 6m x 6m Fig SUB TOTAL 5m x 5m 1st year Maint II - Year Maintenance (50 : 20 : 30) as per old rates of 20093) 10 subsidy @ 75% a. Mango b. Grapes c. Pomegranate d. Sapota 2nd year Maint TOTAL 1st & 2nd year Ha KSHMA 4) ii) Fruits - Non Perennials (New AEP) (75 : 25) a. Banana (TC) 1.8m x 1.8m Ha 2m x 2m 1757 548.21 1725 538.20 392 98.64 392 98.64 b. Banana (Suckers) Ha 1123 189.51 1120 189.00 c. Banana Inter Crop in Arecanut Gardens Ha 154 26.26 154 26.26 3426 862.61 3391 852.10 Banana - SUB TOTAL a. Pineapple (Suckers) Ha 140 34.13 140 34.13 b. Papaya Ha 773 173.94 773 173.94 913 208.06 913 208.06 4339 1070.67 4304 1060.16 2313 240.56 2191 227.18 196 16.51 169 14.19 SUB TOTAL TOTAL I - Year Maintenance (75 : 25) 5) a. Banana (TC) - 1.8m x 1.8m Ha 2m x 2m b. Banana (Suckers) Ha 599 33.70 510 29.65 c. Pineapple Ha 337 27.36 310 25.02 d. Papaya Ha 295 22.13 282 21.18 3740 340.26 3463 317.21 TOTAL KSHMA III Area Expansion of Flowers (a) Cut flowers (i) SMF Ha 108 37.80 108 37.80 (ii) Others Ha 168 38.72 168 38.72 276 76.52 276 76.52 SUB TOTAL (b) Bulbulous flowers (i) SMF Ha 168 75.60 168 75.60 (ii) Others Ha 220 65.34 220 65.34 388 140.94 388 140.94 SUB TOTAL (c) Loose Flowers (i) SMF Ha 675 81.00 675 81.00 (ii) Others Ha 1025 81.18 1025 81.18 1700 162.18 1700 162.18 2364 379.64 2364 379.64 SUB TOTAL TOTAL KSHMA IV) a. Area Expansion of Seed Spices and Rhizomatic Spices Rhizomatic Spices - i.Turmeric Ha 185 23.13 185 23.13 i. Pepper Ha 777 155.40 777 155.40 ii. Pepper Inter Crop in Arecanut Gardens Ha 315 63.00 315 63.00 i. Cinnamon Ha 50 10.00 50 10.00 ii. Clove Ha 30 6.00 30 6.00 40 8.00 40 8.00 75 15.00 75 15.00 110 22.00 110 22.00 1582 302.53 1582 302.53 b. Area Expansion of Perennial spices iii. Clove in Areca Gardens iv. Nutmeg Ha v. Nutmeg Inter Crop in Arecanut Gardens TOTAL V Aromatic Plants (a) Cost intensive aromatic plants (Patchouli, Gerenium & Rosemary) Ha 5 1.88 2 0.75 (b) Other aromatic plants Ha 50 6.25 50 6.25 55 8.13 52 7.00 TOTAL KSHMA Plantation crops 60:20:20 VI 1) a. Cashew Ha 1025 123.00 1070 125.30 b. Cocoa Ha 1215 145.80 1120 134.40 535 64.20 575 65.71 2775 333.00 2765 325.41 c. Cocoa Inter Crop in Arecanut Gardens TOTAL I - Year Maintenance 60:20:20 2) a. Cashew Ha 637 25.48 486 19.21 b. Cocoa Ha 839 33.56 738 28.45 1476 59.04 1224 47.66 TOTAL 3) II - Year Maintenance - as per old norms a. Cashew Ha 718 24.23 398 13.82 b. Cocoa Ha 800 27.00 574 21.16 1518 51.23 972 34.98 TOTAL KSHMA 3 4 Rejuvenation/ replacement a. Mango Ha 1645 246.75 1803 266.32 b. Citrus Group (Lime, Coorg Mandarin, Orange, etc) Ha 235 35.25 218 32.66 c. Cashew Ha 155 23.25 64 9.53 d. Pepper Ha 772 115.75 670 90.25 e. Areca Nut (YLD) Ha 2483 372.45 2200 330.00 TOTAL 5290 793.45 4954 728.76 Total AEP 25205 4219.99 24821 4136.07 535 322.20 492 295.20 535 322.20 492 295.20 Creation of Water resources (b) Water harvesting system for individuals- for storage of water in 20 x 20 x 3 m ponds /wells @ Rs.100/- cum (50% of the cost) TOTAL Nos KSHMA 5 * Protected cultivation 1. Green House structure (a) Fan & Pad system 1000 Sqm Ha (b) Naturally ventilated system (i) Tubular structure 1000 Sqm Ha 17.00 794.75 18.50 845.00 (ii) Wooden / Granite structure 500 Sqm Ha 5.50 141.59 5.50 125.00 2. Plastic Mulching 2 Ha / beneficiary Ha 414.00 41.40 414.00 41.40 (i ) Tubular structure 1000 Sqm Ha 5.00 150.00 7.48 135.00 (ii) Wooden / Granite structure 200 Sqm Ha 5.15 106.42 18.83 92.00 (iii) Bamboo structure 200 Sqm Ha 0.36 5.38 0.41 4.94 4. Anti Bird/Anti Hail Nets 5000 Sq.m Ha 100.00 100.00 65.00 75.00 547.01 1339.54 529.72 1318.34 3. Shade Net House TOTAL KSHMA 7 Promotion INM / IPM (ii) (a) Promotion of IPM Ha 28720 287.20 28097 282.53 (iii) (b) Promotion of INM Ha 21280 212.80 19200 192.00 50000 500.00 47297 474.53 2 45.00 1 37.00 2 45.00 1 37.00 50002 545.00 47298 511.53 SUB TOTAL Diseases Forecosting Unit - Private Sector Bio-Control lab - Private Sector Nos Nos SUB TOTAL TOTAL 8 Organic Farming Adoption of Organic Farming 3rd year Ha 8609 258.27 7874 225.00 Organic Certification - 3rd year Ha 8609 344.36 6374 295.00 (iii) Vermi compost Units Nos 550 165.00 550 165.00 (iv) Bio digester unit Nos 500 150.00 500 150.00 18268 917.63 15298 835.00 TOTAL KSHMA 10 Pollination support through beekeeping (c) Honey bee colony (50 colonies / beneficiary) Nos 4760 33.32 4200 28.32 (d) Hives (50 colonies / beneficiary) Nos 4785 38.28 2468 34.28 Nos 55 3.85 50 3.50 1 2.00 1 2.00 9601 77.45 6719 68.10 (e) Equipment including honey extractor (4 frame), food grade container (30 kg), net, etc. (1 set / beneficiary) Production of Nuclear stock - Public TOTAL 11 Horticulture Mechanization (a) Power Machines (upto 20 BHP) with rotavator / equipment) (1 set / beneficiary) Nos 49 29.40 49 29.40 (b) Power machines (20 HP & above) including accessories/ equipments (1 set / beneficiary) Nos 150 225.00 150 225.00 199 254.40 199 254.40 9 36.00 7 28.00 9 36.00 7 28.00 TOTAL 12 (a) Technology Dissemination through * demonstration/ Front Line Demonstration (FLD) Nos (Public) (75% cost in farmers field) (Project Based) (b) Technology Dissemination through * demonstration/ Front Line Demonstration (FLD) (Private) (Project Based) TOTAL Nos KSHMA 13 Human Resource Development (HRD) (i) Within the District (1 day) Nos 12613 50.45 11982 47.93 (i) Within the State (5 days) Nos 2302 34.53 2187 32.80 (ii) Outside the State (5 days) Nos 2389 71.67 2270 68.09 (iii) Outside India (project based) Nos (d) Exposure visit of farmers 50.00 62.65 (e) Training / study tour of technical staff/ field functionaries (i) Within the State Nos 65 0.65 3 0.13 (ii) Study tour to progressive States/units (group of minimum 5 participants) Nos 150 4.88 110 3.86 (iii) Outside India (100% of the cost on actual basis) Nos iv) HRD for Supervisors / Gardners 40.00 1 (f) Publicity propoganda TOTAL 17520 24.16 15.00 2 35.00 20.00 1 19.21 287.18 16555 293.83 KSHMA C INTEGRATED PHM 1. Pack house/ On farm collection & storage unit (unit of the size of 9 x 6m) Nos 361 541.50 352 535.00 2. Refer vans/ containers Nos 5 10.00 5 8.37 3. Primary / Mobile/ processing unit Nos 112 447.84 121 425.52 4.. Ripening chamber Nos 3 205.64 3 205.64 5. Cold Storage Nos 1 118.40 1 117.30 6.. Low cost onion storage structure (25 MT) (50%) Nos 100 50.00 80 40.00 582 1373.38 562 1331.83 TOTAL KSHMA ESTABLISHMENT OF MARKETING INFRASTRUCTURE FOR HORTICULTURAL PRODUCE D * 1. Wholesale markets (as Credit linked back ended) Nos 1 102.50 1 102.50 * 2. Static/Mobile Vending Cart/platform with cool chamber (@ 50%) Nos 50 7.50 20 1.60 51 110.00 21 104.10 2 23.00 2 23.00 TOTAL E Special Intervention for Mitigation of BBD for Pomogranate F Mission Management G Mission Management (Sanction given for publicity, seminors etc. Nos (Districts ) 562.99 550.00 15 23.75 15 23.75 SUB TOTAL (F & G) 15.00 586.74 15.00 573.75 GRAND TOTAL 152265 12500.00 140665 12082.37 KSHMA