Preparations for 925 Million Tonne
Production from CIL in 2019-20
Preparations for 925 Mt Production in 2019-20


No drilling is required for the Blocks/Mines identified for 925 Mt
production in 2019-20.

18 Project Reports (PRs) are to be prepared (production 57 Mt in 2019-20).

Based on PR approval schedules of CIL, the PR submission schedule will
be as follows:

10 PRs will be submitted by March 2015.

7 PRs will be submitted in 2015-16.

1 PR will be submitted in 2016-17.

27 Updated Cost Estimates for PRs will be submitted well before their PR
approval schedule.

6 Schemes for Patch OCPs (for ECL) will be submitted well before their
approval schedule.
 www.cmpdi.co.in

GRs Required for 925 Mt production in 2019-20
Sl Comp- Block
No any
1 NCL Patpahari
UG/OC
Prodn in
Remarks
2019-20 (Mt)
1.00
GR for non-forest part available. Drilling delayed due to
forest clearance. 10-15 km rail link with Katni-Chopan main
Alternative for
Prodn
line needed. Power supply network needed. PR approval
required by Nov-17.
2
NCL
3
NCL
4
5
MarkiBarka (W)
UG
0.50
MarkiBarka (E)
UG/OC
ECL Dhangajore
UG
1.00
ECL
0.10
 www.cmpdi.co.in
Madhukunda UG
2.5 Mt production
can be obtained
GR for non-forest part available. Drilling delayed due to from expansion of
forest clearance. 30 km rail link with Katni-Chopan main line operating mines
needed. Power supply network needed. PR approval required
like Jayant Expn,
by Nov-17.
Dudhichua Expn,
Drilling delayed due to forest clearance. 30 km rail link with etc.
Katni-Chopan main line needed. Power supply network needed.
GR expected by Mar-17. PR approval required by Nov-17.
0.30
Drilling delayed due to forest clearance. Forest cover-75%.
Number of villages to be rehabilitated. CBM overlap. GR
expected by 18-19.
Drilling delayed due to forest clearance. GR expected by
18-19.
0.4 Mt production
can be obtained
from Hura C,
Chuperbhita, etc.
Project Reports (PRs) to be Prepared for 925 MT Projection of CIL in
2019-20

Sl CompNo any
Project Report
OC/ Incremental Contribution Schedule of PR
UG
Capacity
in 2019-20
Submission
(Mty)
(Mt)
OC
3.00
0.50
Sep-15
PR Approval
Schedule
1
ECL Chaudhar-Gariapani-Kayada (119
blocks)
2
ECL North Searsole Recast
OC
2.00
0.80
Sep-15
Dec-15
3
ECL Nakrakonda Kumardih-B
OC
0.70
0.70
Mar-15
Jun-15
4
ECL Madanpur Recast (119 blocks)
UG
1.59
0.50
Sep-15
Dec-16
7.29
2.50
Sub-total ECL
Dec-15
Note: For CCL, the PR for Chatti-Bariatu-Kerendari is to be prepared before Jan 2016 only
after these captive blocks are allotted to CCL.
 www.cmpdi.co.in

PRs to be Prepared for 925 MT Projection of CIL in 2019-20
Sl No Company
OC/ Incremental Contribution Schedule of PR
PR Approval
UG
Capacity
in 2019-20
Submission
Schedule
(Mty)
(Mt)
1
WCL Kumbharkhani UG to OC Recast
OC
1.00
0.20
Mar-16
Mar-17
Sub-total WCL
1.00
0.20
Note: 22 Updated Cost Estimates of PRs made earlier, are to be submitted. 7 in 2014-15, 14 in 2015-16, 1 in 2016-17.
1
2
3
4
5
6
7
8
SECL
SECL
SECL
SECL
SECL
SECL
SECL
SECL
Project Report
Chira Group OC (119 blocks)
OC
15.00
1.50
Syang Group OC (119 blocks)
OC
20.00
3.00
Gevra Expn OC (70 Mty)
OC
35.00
24.00
Mahamaya OC
OC
1.14
1.25
Chirimiri Expn
OC
1.00
1.00
Gayatri UG
UG
0.66
0.66
Batura Highwall
OC
0.50
0.50
Batura West Extn Highwall/OC
OC
1.00
0.50
Sub-total SECL
74.30
32.41
Note: 3 Updated Cost Estimates of PRs made earlier, are to be submitted by June 2015.
 www.cmpdi.co.in
Jul-16
Jan-16
Mar-15
Mar-15
Mar-15
Mar-15
Mar-15
Mar-15
Oct-16
Apr-16
Apr-15
Apr-15
Apr-15
Apr-15
Jan-16
Sep-16

PRs to be Prepared for 925 MT Projection of CIL in 2019-20
Sl CompNo any
Project Report
1
2
3
4
NCL
NCL
NCL
NCL
1
MCL Bhubaneswari Expn (30 Mty)
Sub-total MCL
OC/
UG
Incremental Contribution Schedule of PR
Capacity
in 2019-20
Submission
(Mty)
(Mt)
PR Approval
Schedule
Block B Expn Recast PR (6 Mty)
OC
4.00
3.50
Nov-15
Jul-16
Jayant Expn OC
OC
10.00
6.00
Jan-15
Sep-15
Dudhichua Expn OC
OC
10.00
6.00
Dec-15
Mar-16
Dongrital UG (119 blocks)
UG
3.00
1.50
Mar-15
Nov-15
Sub-total NCL
27.00
17.00
Note: Projected production of 2.5 Mt in 2019-20 from Patpaharia, Marki-Barka E & Marki-Barka W (all 3 in 119 blocks list) is
proposed to be obtained from expansion of operating mines e.g. Jayant Expn & Dudhichua Expn, etc.
OC
TOTAL 18 PRs
(10 PRs in 14-15; 7 PRs in 15-16; 1 PR in
16-17)
 www.cmpdi.co.in
10.00
10.00
5.00
5.00
119.59
57.11
Dec-15
Mar-16
Sustaining the Production Level

Status of 119 Blocks assigned to CIL
No. of
blocks
Tentative
Reserves
(MT)
Tentative
capacity
(Mty)
GR Available
37
9451.78
73.49
Exploration in progress
59
24396.29
102.70
Exploration to start
23
10297.09
29.25
Total
119
44145.16
205.44
Note:
1. GR preparation for all 23 Unexplored Blocks will be completed by
2026-27.
2. 7 of these 23 blocks are on dip side of operating mines. 1 block is
under the NTPC power plant site in North Karanpura.
 www.cmpdi.co.in

Sustaining the Production Level
Status of 119 Blocks assigned to CIL
Geological Reports Available
– 37 Blocks.
Project Reports Submitted
– 7 Blocks
Project Reports to be submitted in 2015-16
– 19 Blocks
Project Reports to be Submitted in 2016-17
– 2 Blocks
Blocks allotted for CTL
– 2 Blocks
Blocks to be Worked from Operating Mines – 3 Blocks
Blocks on Dip side of Other Mines/blocks
 www.cmpdi.co.in
– 4 Blocks
Exploration in Progress
– 59 Blocks.
Exploration to commence
– 23 Blocks.
Sustaining the Production Level

Status of 119 Blocks assigned to CIL
Company
No. of
Blocks
Type of Mine
Reserves (in MT)
OC
UG
Mixed
Proved
Indicated
Inferred
Total
ECL
17
0
11
6
1212.73
6665.19
24.87
7902.79
BCCL
3
1
2
0
315.10
147.06
-
462.16
CCL
17
8
6
3
1020.04
3265.72
621.09
4906.85
WCL
18
3
15
0
208.37
1519.81
75.00
1803.18
SECL
40
8
15
17
1989.83
12978.51
150.00
15118.34
NCL
13
0
4
9
524.11
4790.83
-
5314.94
MCL
11
8
1
2
1965.02
5446.88
1225.00
8636.90
CIL
119
28
54
37
7235.20
34814.00
2095.96
44145.16
Note:
Out of 119 blocks, 4 blocks (Brahmani, Chichropatsimal, East of Damagoria, and Takli-Jena-Bellora North) are
deallocated captive blocks (Schedule-I), and 2 blocks (Brajnathpur and Radharamanpur) are allotted for
CTL. So, the number of additional CIL blocks would be 113 instead of 119.
 www.cmpdi.co.in
Large Projects Likely in 119 Blocks

Sl
No
Block
Tentative Capacity
(Mty)
1
Brahmani-Chichropatsimal
ECL
18
2
Salaipahar
ECL
6
3
Chirra Group (5 blocks)
SECL
15
4
Syang Group (4 blocks)
SECL
20
5
Mahan North
SECL
5
6
Mahan South
SECL
5
7
Prajapara
MCL
8
Prajapara Dip Side
MCL
9
Tribira
MCL
TOTAL
 www.cmpdi.co.in
Company
5
8
82
Support Services during Project Implementation


Operational Planning for large opencast mines

Surface Layout and Infrastructure support services

Introduction of higher size equipment (e.g. 42 cum rope shovel, 15 cum hydraulic shovels, 240 T
dumpers, 381 mm drills, 860 HP dozers, 533 HP motor graders, etc)

Mobile In-pit crushing and conveying systems with dust suppression arrangements

Satellite Surveillance for R&R and Land Reclamation Monitoring

OBR measurement for all mines of CIL (as per recent CVC guidelines)

NDT.

Laser Scanner for Survey.

Environmental Monitoring for PM 2.5 micron.

New Area for Space Technology Application:

Regional Air Quality Monitoring using space borne scanners

Slope Stability monitoring using SAR Interferometry

Rapid OB and Coal Stock Measurement using UAVs.
 www.cmpdi.co.in
Support Services during Project Implementation (Contd)


Planning and design of Coal Handling Plant including tender documents preparation, cost
estimates, etc.

Blasting services 
Controlled blasting,

Fragmentation,

Site-specific proper drilling/blasting design.

Design of roof support systems and strata control services.

Management services for ISO Certification - ISO 9001(Quality Management System), ISO 14001
(Environment Management System), OHSAS (Occupational Health & Safety Assessment Series)18001, SA
(Social Accountability) 8000, ISO 27001 (Information Security Management System), ISO 50001(Energy
Management System).

Lab. services for –

Coal characterisation,

Washability,

Air / water quality,

Physico-mechanical properties of rocks,

CBM, Shale Gas, etc.
 www.cmpdi.co.in

Production Enhancement from UG mines – Mass Production
Technology
UNDERGROUND MINES IN OUTSOURCING MODE
Sl No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
 www.cmpdi.co.in
Mine
Moonidih XV Seam
Moonidih XVI Seam
Kapuria
Muraidih
Jhanjra
Sarpi
Jhanjra PSLW
NCPH/Kapildhara
Sheetaldhara-Kurja
Pinoura
Rani-Atari
Churcha RO
Haldibari
Vijay West
Tandsi
Sub-total
Company
BCCL
BCCL
BCCL
BCCL
ECL
ECL
ECL
SECL
SECL
SECL
SECL
SECL
SECL
SECL
WCL
Capacity
(Mty)
2.500
0.700
2.000
2.000
0.950
0.460
1.700
0.430
0.420
0.400
0.180
1.000
0.420
0.420
0.510
14.090
Technology
Status
PS Longwall
PS Longwall
PS Longwall
PS Longwall
Continuous Miner
Continuous Miner
PS Longwall
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded
Work Awarded

Production Enhancement from UG mines – Mass Production
Technology
UNDERGROUND MINES IN OUTSOURCING MODE
 www.cmpdi.co.in
Sl No
Mine
Company
Capacity
(Mty)
Technology
Status
1
Block-II
BCCL
0.450
Continuous Miner
In Pipeline
2
Kottadih
ECL
0.510
Continuous Miner
In Pipeline
3
Khairaha
SECL
0.465
Continuous Miner
In Pipeline
4
Ketki
SECL
0.300
Continuous Miner
In Pipeline
5
Gayatri
SECL
0.510
Continuous Miner
In Pipeline
6
Tawa-II
WCL
0.360
Continuous Miner
In Pipeline
7
Borda
WCL
2.000
PS Longwall
In Pipeline
8
Murpar
WCL
2.000
PS Longwall
In Pipeline
Sub-total
6.595
Grand-total
20.685

Production Enhancement from UG mines – Mass Production
Technology
OTHER MINES IDENTIFIED FOR CM TECHNOLOGY
Sl No
1
2
3
4
5
6
7
8
9
10
 www.cmpdi.co.in
Mine
Company
Kumardih B
ECL
Churi
CCL
Parej East
CCL
Piparwar Mangardaha
CCL
Amlo-Dhori
CCL
Jamunia
WCL
Gandhigram
WCL
Dhau North
WCL
Talcher West
MCL
Natraj
MCL
Sub-total (PR
approved)
Capacity
(Mty)
1.020
0.500
0.510
1.020
0.300
0.840
1.170
0.360
0.520
0.520
6.760
Technology
Status
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
PR approved
PR approved
PR approved
PR approved
PR approved
PR approved
PR approved
PR approved
PR approved
PR approved

Production Enhancement from UG mines – Mass Production
Technology
OTHER MINES IDENTIFIED FOR CM TECHNOLOGY
Sl No
Mine
1
2
3
4
Tilaboni
Jhanjra LHCM
Shankarpur
PandaveswarDalurband
Rangamati-A
5
6
Company
ECL
ECL
ECL
ECL
Capacity
(Mty)
1.860
0.720
1.163
1.170
Technology
Status
Continuous Miner
Continuous Miner
Continuous Miner
Continuous Miner
Awaiting approval
Awaiting approval
Awaiting approval
Awaiting approval
ECL
0.855
Continuous Miner
Awaiting approval
1.080
Continuous Miner
Awaiting approval
0.720
Continuous Miner
7.568
14.328
35.013
Awaiting approval
Rangamati-B (Tumni
ECL
and Kanchanpur
Sector)
7
Pathakpur
SECL
Sub-total (PR awaiting approval)
Total (Other Identified Mines)
Grand-total (Outsourcing + Other
Identified Mines)
 www.cmpdi.co.in

 www.cmpdi.co.in
Coal Resources & Reserves under CIL as per UNFC Classification
Total No. Of
Blocks/Mines/
Projects
Total
Resources
(BT)
Proved
Resources
(BT)
Indicated /
Inferred
Resources
(Balance to be
proved) (BT)
645
88.417
66.61
21.80

Resources in Stand Alone Blocks and Dip Side
Blocks as per UNFC Classification
Type of Blocks
Number
Explored Stand alone Blocks
Resources (BT)
4
Total – Explored
0.28
0.28
Un-Explored Stand alone Blocks
2
0.50
Under Exploration Stand alone Blocks
5
0.98
Total - Unexplored Blocks
1.48
TOTAL – Stand alone Blocks
1.76
Resources on dip side blocks/lower seams
20.32
Grand Total
 www.cmpdi.co.in
22.08

Sl
No
Stand-alone Blocks under CIL
Block
Coalfield Exploration Tentative OC/ Tentative
Remarks
Status
Reserves UG Capacity
(Mt)
(Mty)
Daltonganj Explored
3.62
UG
0.3
Small isolated block. Meager reserves.
1
North Lohari
2
Barul Bagdiha
Ranigunj
Unexplored
468.78
UG
1
Reserves deep seated below barren measure.
3
Madhupur
Ib Valley
In progress
70.73
OC
2
30% forest land. Dhutra Sardega Rly Corridor 52 km needed.
4
Baitarni East
Talcher
In progress
425.00
OC
5
5
Tulsi Block A
Bisrampur
Explored
32.91
1
Law & Order Problem. 60 % forest, Jarapada-Talcher Rail Corridor
87 km needed, 2 nalas to be diverted.
GR submitted in 2013. Block area 4.13 sq.km.
6
East of Manikpur
(Bundeli-I, II, III)
Noonbirra
Korba
Explored
200.00
Korba
Explored
44.58
Sohagpur Unexplored
30.00
OC/
UG
OC/
UG
OC/
UG
UG
Tatapani
In progress
45.86
OC
1
10 Duba
Tatapani
In progress
87.81
OC
1
11 Mitgain Bhormi
Tatapani
In progress
350.00
OC
3
7
8
9
Keshwahi (Gerua
Area)
Amartipur
 www.cmpdi.co.in
1759.29
3
1
1
19.30
40% forest land, R&R of 1 village, 3-4 km rly link needed from
proposed East West Rail Corridor.
Indicated reserve. Detailed exploration not done due to low potential.
20% forest land, R&R of 7 villages, 20 km rly link needed from
Burhar siding.
Law and order problem. 95 % forest land, 49 km rly link needed from
Bhatgaon siding.
Law and order problem. 80% forest land. 43 km rly link needed from
Bhatgaon siding
Law and order problem. 7 km rly link from Bhatgaon siding needed.
THANK YOU
PRs prepared and not included in the 925 Mt production
program

Sl
No
Project
Comp- OC/ UG Incremental
any
Capacity (Mty)
PR Status
1
Pandaveswar-Dalurband
ECL
UG
2.27
Awaiting approval with ECL. OC (H) Patch
Proposed.
2
3
4
Rangamati A
Rangamati B (Gourbazar Sector)
Rangamati B (Tumni Kanchanpur
Sector)
ECL
ECL
ECL
UG
UG
UG
0.86
0.51
1.08
Awaiting approval with ECL.
Awaiting approval with ECL.
Awaiting approval with ECL.
5
Shankarpur UG
ECL
UG
Awaiting approval with CIL.
6
Block V
BCCL
OC
1.16
5.88
3.00
7
Block VI
BCCL
OC
1.50
Awaiting approval with BCCL. OC (H) Patch
Proposed.
8
Kalyaneshwari (119 blocks)
BCCL
Sub-total BCCL
OC
4.00
8.50
Awaiting approval with BCCL.
Sub-total ECL
 www.cmpdi.co.in
Awaiting approval with BCCL. OC (H) Patch
Proposed.

Sl
No
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

PRs prepared and not included in the 925 Mt production
program
Project
Ara OC
Argada OC
Asnagarha OC
Aswa NS
Chano Rikba
DRD OC
Gose OC
Hesalong
Jeevandhara OC
Kuju
Mahendra (Rajbar) (119 blocks)
Pundi Expn
Ramgarh-II West
Religara Expn
Sawang Pipradih OC
Sayal D
www.cmpdi.co.in
Sub-total CCL
Comp- OC/ UG
any
CCL
CCL
CCL
CCL
CCL
CCL
CCL
CCL
CCL
CCL
CCL
CCL
CCL
CCL
CCL
CCL
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
Incremental
Capacity (Mty)
2.50
1.70
3.00
1.00
2.00
4.00
2.00
1.50
1.00
1.30
4.00
2.50
1.50
0.60
2.00
1.00
31.60
PR Status
Awaiting approval with CCL
Approved in Principle by CCL
Awaiting approval with CCL
Approved in Principle by CCL
Approved in Principle by CCL
Awaiting approval with CCL
Approved in Principle by CCL
Approved in Principle by CCL
Awaiting approval with CCL
Approved in Principle by CCL
Approved in Principle by CCL
Approved in Principle by CCL
Awaiting approval with CCL
Awaiting approval with CCL
Awaiting approval with CCL
Approved in Principle by CCL
PRs prepared and not included in the 925 Mt production
program

Sl No
25
26
27
28
29
30
31
32
33
34
35
Project
Bakulmuni OC
Amba UG
Badauli PSLW UG
Bodri/Bodri North UG
Pathakpur UG
Sub-total SECL
Chikalgaon / Chinchala
Ghugus Expansion (Sector C) /Nokoda
UG to OC
Magrahi Urdhan
Bhakra
Dhankasa
Gandhigram
Sub-total WCL
TOTAL
 www.cmpdi.co.in
Company
OC/
UG
Incremental
Capacity (Mty)
PR Status
SECL
SECL
SECL
SECL
SECL
OC
UG
UG
UG
UG
Submitted to SECL. Uneconomic.
Submitted to SECL. Uneconomic.
Submitted to SECL.
Submitted to SECL. Uneconomic.
Submitted to SECL.
WCL
WCL
OC
OC
1.50
0.24
0.78
0.78
0.72
4.02
3.00
0.80
WCL
WCL
WCL
WCL
OC
UG
UG
UG
2.00
0.27
1.00
1.20
8.27
58.27
Uneconomic - shelved by WCL
Uneconomic
Uneconomic
Uneconomic
Uneconomic
Uneconomic