1 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Optimizing Workloads with the SPARC T5, the World’s Most Powerful Processor Robert Qiu Randal Sagrillo Program Agenda SPARC T5: Worlds Faster Microprocessor Optimizing Database Workloads Optimizing Java Workloads Optimizing Application Workloads For More Information 3 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle. 4 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. The World’s Fastest Processor: Oracle T5 T5-8 Runs Applications 5X Faster than T4-4 T5 Improvements 2X cores 2X threads 2.5X memory bandwidth 2X cache System Improvements 5X memory bandwidth 4X I/O bandwidth 2X memory capacity 5X application performance 5 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. T5: 18 World Record Enterprise Benchmarks #1 TPC-C: fastest database server #1 SPECjbb 2013: fastest Java server #1 SPECjEnterprise 2010: fastest middleware server #1 SPEC CPU 2006: fastest raw processor performance #1 SAP-SD: fastest SAP 8-processor server #1 Siebel: fastest CRM server As of June 10, 2013 6 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. See benchmark disclosure slide Optimizing Database Workloads 7 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. SPARC T5: Best for Data Warehouse Workloads World Record Data Warehouse single-system performance 3TB TPC-H chip,core Database QphH $/QphH Avail SPARC T5-4 4, 64 Oracle 11g 409,722 $3.94 09/24/13 Oracle M9000 64, 256 Oracle 11g 386,478 $18.19 09/22/11 SPARC T4-4 4, 32 Oracle 11g 205,792 $4.10 05/31/12 IBM Power7 780 8, 32 Sybase 192,001 $6.37 11/30/11 • 3TB TPC-H: SPARC T5-4 is 2.1x faster than 8-chip Power7 • SPARC T5: 4.3x faster per chip, 1.6x better $/perf, & faster per core than IBM • SPARC T5-4 6% faster M9000-64, Over 4x better price/performance 8 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. See benchmark disclosure slide SPARC T5: Best for OLTP Workloads World Record OLTP single-system performance Server Oracle SSC IBM Power 780 Oracle T5-8 IBM p595 Oracle X4800 Cisco UCS IBM Power 780 so,core 27n x 4ch 3n x 8ch 8, 128 32, 64 8, 80 2, 16 2, 8 Processor SPARC T3 3.86 Power7 3.6 SPARC T5 5.0 Power6 2.4 Xeon E7 2.9 E5-2690 4.14 Power7 SW Oracle 11g DB2 9.7 Oracle 11g DB2 9.5 Oracle 11g Oracle 11g DB2 9.5 tpmC $/tpm C 30.2 $1.01 M 10.3 $1.38 M 8.55 $0.55 M 6.0M $2.81 5.0M $0.94 1.6M $0.47 1.2M $0.69 • World record single-system TPC-C 8,552,523 tpmC • SPARC T5-8 delivers 3.1M IOPs from storage • SPARC T5 2.4x faster per chip performance than IBM configuration • 3-node IBM p780 (24 total chips at 10.3M), Oracle has 2.5x better $/tpmC • SPARC T5 5x better response time than IBM p780 cluster (New Order 90%) 9 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. See benchmark disclosure slide Telecommunications Provider SPARC T5 and Oracle Solaris Improves Database Performance COMPANY • One of the largest mobile telephony providers in their region in Europe • Seeking to reduce reduce data center complexity and cost, and increase subscriber performance RESULTS • Baseline equivalent tested Oracle SPARC T5-4 on a 6 CPU to 6 CPU basis compared to existing IBM platform • 1.1x improvement in I/O intensive query run times • 1.1x improvement in CPU intensive query run times • 1.1x improvement in merge query run times OPPORTUNITY • SPARC T5-4 with Oracle Solaris offers proven higher performance and lower TCO than existing IBM platform running Oracle Enterprise Database 11gR2 SPARC T5-4 • Improve customer response times with higher performance I/O, CPU, and query response times 10 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Existing Platform Telecommunications Provider SPARC T5 and Oracle Solaris Significantly Reduce Total Cost of Ownership SPARC T5-4 IBM Power 795 Significant reduction in Oracle core software licensing costs 1.1x Improved Oracle Enterprise Database 11gR2 Response Times Total Cost of Ownership Comparison SPARC T5-4 to IBM Power 795 (both 64 cores) Installed Base Proposed Total 5 Year TCO ($000) IBM Power 795 SPARC T5-4 Hardware Acquisition $ $ 149 Hardware Service $ 1,957 $ 98 Software Licensing/Service $ 3,322 $ 830 Power and Cooling $ 81 $ 12 Floor Space $ 24 $ 2 Integration $ $ 7 $ 5,384 $ 1,098 Net TCO Difference 5x Lower System Configurations: SPARC T5-4 SPARC T5 3.6GHz 1024GB 4 chips 64 cores POWER 795 POWER 7 4.0GHz 512GB 8 chips 64 cores 11 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. European Hospital Organization 4x performance gain with no change to applications COMPANY RESULT • Largest hospital organization in region • Consolidate existing servers, improve performance • Installed base of M5000 systems running Solaris 10 Chose SPARC T5-4 and Solaris 10 for best combination of acquisition cost and price/performance • Achieved goal of providing the maximum performance required at 4x existing platforms • Lower cost to acquire than similarly positioned IBM/AIX offering • No application change required for DB2: no patching, no porting, no recompile, just drop-in replacement due to Solaris application compatibility OPPORTUNITIES • Deliver 2x immediate performance gain with upside for 4x improvement over time • Lower cost of acquisition than IBM Power 7+ systems • Next generation platform for DB2 SOLUTION • Selected SPARC T5-4 servers running Solaris 10 • Solaris compatibility for applications ensures more rapid transition Performance SPARC T5-4 SPARC M5000 12 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. SPARC M5000 SPARC T5-4 European Hospital Organization Lower cost of acquisition and better price/performance than IBM SPARC T5-4 #1 SPARC T5-4 #2 Oracle Solaris 10 Oracle Solaris 10 Oracle Solaris 10 IBM DB2 SPARC T5-4 SAN Storage Increased Performance by 4X Rapid time to Adoption 13 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Top Optimizations for Database Workloads Beyond Instance Tuning and SQL Tuning Maximize memory available for SGA (Buffer Cache) – Convert slower Physical I/O to Faster Logical I/O Use current and latest versions of Oracle Database and Oracle Solaris – Automatic application of Critical Thread processing for LGWR and LMS Take care with virtualized I/O – Direct I/O, Split Bus, SR-IOV better performance than Shared or Guest I/O 14 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Optimizing Java and Middleware Workloads 15 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. SPARC T5: Best for Application (Java) Server Better System and Processor Performance, Lower Cost 3.4x 50 40 30 20 10 0 Oracle T5-8 8xCPU@3.6GHz Bigger is better 16 IBM 780 8xCPU@3.8 GHz Copyright © 2013, Oracle and/or its affiliates. All rights reserved. SPECjEnterprise®2010 Results per socket SPECjEnterprise®2010 (thousands) 60 Processor Performance System Cost SPARC T5 vs. POWER7+ Eight-Socket Systems Comparison $1,000 7,500 19% 7,000 6,500 6,000 5,500 5,000 $800 3.6x $600 $400 $200 $0 SPARC T5-8 Bigger is better System Cost in Thousands System Performance Eight-Socket Systems Comparison IBM Power 730+ Oracle T5-8 Smaller is better See benchmark disclosure slide IBM 780 SPARC T5 Best for Java (SPECjbb2013 Multi-JVM) World Record 2-chip on new realistic enterprise Java benchmark 30,000 SPARC T5 40,000 SPECjbb2013 per-chip SPARC T5 1.9x faster HP x86 SPARC T5 1.9x faster than HP E5-2690 SPARC T5 2.23x faster than HP E7-4870 IBM Power7+ only publishes SPECjbb2005, SPEC retiring old benchmark in July 2013 Westmere Xeon E7 SPARC T4 Sandy Bridge 10,000 Xeon E5-2690 20,000 0 SPARC T5-2 HP ML350p SPARC T4-2 HP DL980 17 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Application Server Multi-JVM results Processor Max jOPS Crit jOPS HP DL980 G7 8-chip 2.4GHz E7-4870 106,141 23,268 SPARC T5-2 (2-chip) 3.6GHz SPARC T5 75,658 23,334 HP DL560p 4-chip 2.7GHz E5-4650 67,850 16,199 HP ML350p 2-chip 2.9GHz E5-2690 40,047 12,566 SPARC T4-2 2.85GHz SPARC T4 34,804 10,101 benchmark See benchmarkSee disclosure slidedisclosure slide Core Banking Applications SPARC T5-8 Delivers Throughput for Core Banking Application COMPANY • Large Oracle SPARC installed base financial institution software ISV • Requirement to reduce data center costs and consolidate platforms • Minimize risk and complexity by leveraging Oracle Solaris operating system RESULTS • 8x price/performance advantage over IBM Pure Flex • 6x performance increase based on utilization • 4x higher performance per core • 4x additional agents supported • 1.3x better application response times OPPORTUNITY • Characterize SPARC T5-8 as their new midrange system with proven performance against IBM • Replace IBM Pure Flex with T5-8 for higher performance and better response times Performance/Core CPU Utilization Price/Performance SPARC T5 IBM 18 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 0 5 10 Core Banking Applications SPARC T5-8 Delivers Throughput for Core Banking Application IBM Pure Flex SPARC T5-8 Oracle Solaris 11 6x Performance increase 4x better performance per core 30% faster response times 19 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Superior Scalability and Virtualization Optimizing Java/Application Server Workloads Use Scheduling Class and Memory Placement to Improve Efficiency Host Oracle WebLogic server instances on separate Oracle Solaris Zones – Improves consolidation efficiency. Bind each zone to a separate processor set. – Reduces memory access latency and contention. – Use default processor set for network and interrupt handling. Run application servers in FX (Fixed Execution) scheduling class – Reduces frequency of context switches. 20 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Optimizing Application Workloads 21 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. SPARC T5 Best for Oracle Siebel SPARC T5 & Solaris10 setting world records, beating IBM Power7 #1 Oracle Siebel's PSPP benchmark Call Two IBM Power 750 app tier only supported 21,000 users – SPARC T5 1.9 faster per chip than Power7 SPARC T5-2 333,339 transactions/hr 10,000 10,000 # users per chip Center & Order Management Two SPARC T5-2: 40,000 users App server 8,000 Siebel PSPP Benchmark (per chip) 6,000 5,250 4,000 2,000 – IBM was at 176,185 transactions/hr sub-second online response time 22 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 0 SPARC T5 See benchmark disclosure slide IBM Power7 SPARC T5 Best for Oracle JD Edwards SPARC T5-2 batch+online World Record, beats IBM Power 770 Batch performance 198.5 JD Edwards Benchmark Online+Batch #1 Oracle JD Edwards DIL benchmark SPARC T5-2: 6.1x faster per chip on batch than IBM Power7 on concurrent online+batch – SPARC T5 (2-chip, 32core) is also 3.1x faster per core than Power7 – IBM Power 770 (4-chip 32core) batch at 65 65.0 UBE/min SPARC T5-2 12k online users interactive matches IBM Power 770 SPARC T5-2 23 IBM Power7 4chip Copyright © 2013, Oracle and/or its affiliates. All rights reserved. – SPARC T5-2 sub-second response online See benchmark disclosure slide Financial Services Provider SPARC T5-8 and Oracle Solaris Beats IBM Power 780 in Real-time Streaming RESULTS COMPANY • International financial services provider optimizing datacenter with Oracle SPARC • Testing SPARC T5-8 as a new mid-range system with high scalability • 6x larger available CPU headroom • 5x space reduction based on rack unit capacity • 7x lower server cost based on comparative server pricing OPPORTUNITY • Proven faster real time streaming performance with SPARC T5-8 over IBM Power 780 • Opportunity to displace IBM Power systems Performance/Core CPU Utilization based on price/performance superiority Price/Performance SPARC T5 IBM 24 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 0 5 10 Financial Services Provider SPARC T5-8 and Oracle Solaris Advantage Over IBM Power 780 Scalability of Oracle Solaris/SPARC and superior virtualization with Solaris Zones IBM Power 780 SPARC T5-8 Oracle Solaris 11 5x Reduction in Footprint 7x Reduction in Costs 25 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Superior Scalability and Virtualization US Insurance Claims Company Over 150x Faster Claims Processing with No Application Changes COMPANY RESULT • North American company specializing in third-party SPARC T5 and T4 servers with Oracle Solaris 10 delivered outstanding performance and will enable rapid adoption into data center • SPARC T4-4 systems tested at Oracle Solution Center processed claims over 150x faster than existing V890 system • V890 system processed 83 claims in an hour vs. 8,000 claims per hour on SPARC T4-4. SPARC T5-4 expected to do 2x more than T4-4 • Oracle Solaris 10 compatibility ensures project will be completed within 6-8 week deadline administration of insurance claims • Claims application runs with Oracle Database on Sun Fire V890 systems with Oracle Solaris 10 • Recent acquisitions of smaller companies growing the volume of claims processing required OPPORTUNITIES • Evaluating new SPARC T4 and SPARC T5 systems to improve performance and capacity of claims processing • Minimize risk in transition from existing platforms • Tight timeline due to rapid integration of acquisitions SOLUTION • Selected SPARC 3 T5-4 and 6 T4-1 servers running Oracle Solaris 10 26 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Claims Processed Per Hour SPARC V890 SPARC T4-4 SPARC T4-4 SPARC V890 US Insurance Claims Company Oracle SPARC and Solaris Deliver Massive Performance Improvement SPARC T5-4 #1 SPARC T5-4 #... 6X Claims Processing Application 3 Claims Processing Application SPARC T4-1 App Server SPARC T4-1 Oracle Solaris 10 Oracle Database 11gR2 Internal Claims Processing Application SPARC T5-4 SPARC T4-1 T5-4 T4-1 App Server Oracle Solaris 10 Oracle Solaris 10 SAN Storage Dramatic Peformance Improvement 6-8 Week Time to Production 27 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. European Hosting Service Provider 50% faster single thread performance with no migration effort COMPANY RESULT • European hosting provider delivering core banking Selected SPARC T5-2 and Oracle Solaris 10 due to superior price/performance over IBM and minimal risk in migration • SPARC T5-2 systems delivered between 27% up to 50% better single thread performance over M8000 • Lower cost to operate via reduced power/space and cooling over M8000 • Financial ISV working on port to Solaris 11 – will upgrade hosting offering when support complete • Other business units at hosting company now evaluating SPARC T5 platform services to multiple regional banks • Financial banking application running with Oracle Database • Installed base of M8000 systems competing against IBM Power 7+ platforms OPPORTUNITIES • Deliver at least 25% single thread performance increase • Better price/performance over IBM solutions • Minimize migration effort from existing compute standard SOLUTION • Selected SPARC T5-2 servers running Solaris 10 • Solaris compatibility ensures no migration effort when moving applications from SPARC/Solaris 28 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Single Thread Performance SPARC M8000 SPARC T5-2 SPARC T5-2 SPARC M8000 European Hosting Service Provider 50% faster single thread performance with no migration effort SPARC T5-2 #1 SPARC T5-2 #2 Financial Banking ISV Application Financial Banking ISV Application Oracle Solaris 10 Oracle Solaris 10 Oracle Solaris 10 Oracle Database 11gR2 Financial ISV Application SPARC T5-2 SAN Storage Low Risk Migration Faster Single Thread Performance 29 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Optimizing Application Workloads Without Application Rewrite Use Solaris Zones and OVM for SPARC – Greatly increase platform and application efficiency Use Oracle Solaris Zone Clusters – Greatly increase availability of your applications Use guidelines for Oracle Optimized Solutions – Workload specific tuning, sizing and testing results for the real world 30 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Next Steps 31 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Oracle Optimized Solutions by Workload Enterprise Applications Middleware Oracle E-Business Suite PeopleSoft HCM Siebel CRM 2X lower TCO than IBM 11X faster, ½ the cost of IBM 2X business operations than IBM JD Edwards EnterpriseOne Agile PLM 3.5X faster than IBM 36% Lower TCA than IBM Oracle Unified Directory 3X greater scale Systems Infrastructure 32 5X better TCO than EMC Symmetrix VMAX WebCenter Portal WebLogic Server 11X faster than x86 servers 4X faster encryption than x86 6X better $/perf than IBM Oracle Database 2X faster and 36% lower TCO than IBM Enterprise Cloud Infrastructure 2X lower TCO than HP/VMware and IBM Power/PowerVM Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 7X Faster Queries 4X Faster Data Loading WebCenter Content Lifecycle Content Management Data Management SAP Enterprise Database Cloud 4X better price/performance than IBM Backup and Recovery 5X less cost & faster than Symantec Optimized Solutions Optimize for Workloads Database, Middleware and Applications For more information on workload optimization using Oracle Optimized Solutions: www.oracle.com/optimizedsolutions For more information on SPARC T5: www.oracle.com/sparc For more information on the Oracle Solution Center: www.oracle.com/osc 33 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 34 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 35 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Required Benchmark Disclosure Statement Must be in SPARC T5 & M5 Presos with Benchmark Results (1 of 2) Copyright 2013, Oracle &/or its affiliates. All rights reserved. Oracle & Java are registered trademarks of Oracle &/or its affiliates.Other names may be trademarks of their respective owners.. TPC Benchmark C, tpmC, and TPC-C are trademarks of the Transaction Processing Performance Council (TPC). SPARC T5-8 (8/128/1024) with Oracle Database 11g Release 2 Enterprise Edition with Partitioning, 8,552,523 tpmC, $0.55 USD/tpmC, available 9/25/2013, New Order 90th% Response Time 0.410sec. IBM Power 780 Cluster (24/192/768) with DB2 ESE 9.7, 10,366,254 tpmC, $1.38 USD/tpmC, available 10/13/2010, New Order 90th% Response Time 2.10 sec. IBM x3850 X5 (4/40/80) with DB2 ESE 9.7, 3,014,684 tpmC, $0.59 USD/tpmC, available 7/11/2011. IBM x3850 X5 (4/32/64) with DB2 ESE 9.7, 2,308,099 tpmC, $0.60 USD/tpmC, available 5/20/2011. IBM Flex x240 (2/16/32) with DB2 ESE 9.7, 1,503,544 tpmC, $0.53 USD/tpmC, available 8/16/2012. IBM Power 780 (2/8/32) with IBM DB2 9.5, 1,200,011 tpmC, $0.69 USD/tpmC, available 10/13/2010. Source: http://www.tpc.org/tpcc, results as of 3/26/2013. SPEC and the benchmark name SPECjEnterprise are registered trademarks of the Standard Performance Evaluation Corporation. Results from www.spec.org as of 3/26/2013. SPARC T5-8, 57,422.17 SPECjEnterprise2010 EjOPS; SPARC T4-4, 40,104.86 SPECjEnterprise2010 EjOPS; Sun Server X2-8, 27,150.05 SPECjEnterprise2010 EjOPS; Cisco UCS B440 M2, 26,118.67 SPECjEnterprise2010 EjOPS; IBM Power 780, 16,646.34 SPECjEnterprise2010 EjOPS. IBM PowerLinux 7R2, 13,161.07 SPECjEnterprise2010 EjOPS. SPARC T3-4 9456.28 SPECjEnterprise2010 EjOPS. SPARC T5-8 (SPARC T5-8 Server base package, 8xSPARC T5 16-core processors, 128x16GB-1066 DIMMS, 2x600GB 10K RPM 2.5. SAS-2 HDD, 4x Power Cables) List Price $268,742. IBM Power 780 (IBM Power 780:9179 Model MHB, 8x3.86GHz 16-core, 64x one processor activation, 4xCEC Enclosure with IBM Bezel, I/O Backplane and System Midplane,16x 0/32GB DDR3 Memory (4x8GB) DIMMS-1066MHz Power7 CoD Memory, 12x Activation of 1 GB DDR3 Power7 Memory, 5x Activation of 100GB DDR3 Power7 Memory, 1x Disk/Media Backplane. 2x 146.8GB SAS 15K RPM 2.5. HDD (AIX/Linux only), 4x AC Power Supply 1725W) List Price $992,023. Source: Oracle.com and IBM.com, collected 03/18/2013. SPEC and the benchmark name SPECjEnterprise are registered trademarks of the Standard Performance Evaluation Corporation. Results from www.spec.org as of 5/1/2013. SPARC T5-8, 27,843.57 SPECjEnterprise2010 EjOPS; IBM Power 780, 10,902.30 SPECjEnterprise2010 EjOPS. Oracle server only hardware list price is $298,494 and total hardware plus software list price is $1,565,092 http://www.oracle.com as of 4/24/2013. IBM server only HW list price is $835,555 and HW+SW cost of $2,174,152.00 and BM PowerLinux 7R2 server total hardware plus software cost of $819,451.00 based on public pricing from http://www.ibm.com as of 4/24/2013. SPEC & the benchmark name SPECjbb are registered trademarks of Standard Performance Evaluation Corporation (SPEC). Results as of 3/26/2013, see http://www.spec.org for more information. SPARC T5-2 75,658 SPECjbb2013-MultiJVM max-jOPS, 23,334 SPECjbb2013-MultiJVM critical-jOPS. Sun Server X2-4 65,211 SPECjbb2013-MultiJVM max-jOPS, 22,057 SPECjbb2013-MultiJVM critical-jOPS. Sun Server X3-2 41,954 SPECjbb2013-MultiJVM max-jOPS, 13,305 SPECjbb2013-MultiJVM critical-jOPS. SPARC T42 34,804 SPECjbb2013-MultiJVM max-jOPS, 10,101 SPECjbb2013-MultiJVM critical-jOPS. HP ProLiant DL560p Gen8 66,007 SPECjbb2013-MultiJVM max-jOPS, 16,577 SPECjbb2013-MultiJVM critical-jOPS. HP ProLiant ML350p Gen8 40,047 SPECjbb2013-MultiJVM max-jOPS, 12,308 SPECjbb2013-MultiJVM critical-jOPS. Supermicro X8DTN+ 20,977 SPECjbb2013-MultiJVM max-jOPS, 6,188 SPECjbb2013-MultiJVM critical-jOPS. HP ProLiant ML310e Gen8 12,315 SPECjbb2013-MultiJVM max-jOPS, 2,908 SPECjbb2013-MultiJVM critical-jOPS. Intel R1304BT 6,198 SPECjbb2013-MultiJVM max-jOPS, 1,722 SPECjbb2013-MultiJVM critical-jOPS, HP DL980 G7 106,141 SPECjbb2013-MultiJVM max-jOPS, 23268 SPECjbb2013-MultiJVM critical-jOPS. 37 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Required Benchmark Disclosure Statement Must be in SPARC T5 & M5 Presos with Benchmark Results (2 of 2) Copyright 2013, Oracle &/or its affiliates. All rights reserved. Oracle & Java are registered trademarks of Oracle &/or its affiliates.Other names may be trademarks of their respective owners.. Two-tier SAP Sales and Distribution (SD) Standard Application benchmarks SAP Enhancement package 5 for SAP ERP 6.0 as of 3/26/13:SPARC M5-32 (32 processors, 192 cores, 1536 threads) 85,050 SAP SD users, 32 x 3.6 GHz SPARC M5, 4 TB memory, Oracle Database 11g, Oracle Solaris 11, Cert# 2013009. SPARC T5-8 (8 processors, 128 cores, 1024 threads) 40,000 SAP SD users, 8 x 3.6 GHz SPARC T5, 2 TB memory, Oracle Database 11g, Oracle Solaris 11, Cert# 2013008. IBM Power 760 (8 processors, 48 cores, 192 threads) 25,488 SAP SD users, 8 x 3.41 GHz IBM POWER7+, 1024 GB memory, DB2 10, AIX 7.1, Cert#2013004. Two-tier SAP Sales and Distribution (SD) Standard Application benchmarks SAP Enhancement package 4 for SAP ERP 6.0 as of 4/30/12:IBM Power 795 (32 processors, 256 cores, 1024 threads) 126,063 SAP SD users, 32 x 4 GHz IBM POWER7, 4 TB memory, DB2 9.7, AIX7.1, Cert#2010046. SPARC Enterprise Server M9000 (64 processors, 256 cores, 512 threads) 32,000 SAP SD users, 64 x 2.88 GHz SPARC64 VII, 1152 GB memory, Oracle Database 10g, Oracle Solaris 10, Cert# 2009046. SAP, R/3, reg TM of SAP AG in Germany and other countries. More info www.sap.com/benchmark SPEC & benchmark names SPECfp, SPECint are registered trademarks of the Standard Performance Evaluation Corporation. Results as of March 26, 2013 from www.spec.org and this report. SPARC T5-8: 3750 SPECint_rate2006, 3490 SPECint_rate_base2006, 3020 SPECfp_rate2006, 2770 SPECfp_rate_base2006; SPARC T5-1B: 467 SPECint_rate2006, 436 SPECint_rate_base2006, 369 SPECfp_rate2006, 350 SPECfp_rate_base2006. IBM Power 780 8-chip 3.92GHz: 2640 SPECint_rate2006. IBM Power 710 Express 1-chip 3.556GHz: 289 SPECint_rate2006. TPC-H, QphH, $/QphH are trademarks of Transaction Processing Performance Council (TPC). For more information, see www.tpc.org, results as of 6/7/13. SPARC T5-4 409,721.8 QphH@3000GB, $3.94/QphH@3000GB, available 9/24/13, 4 processors, 64 cores, 512 threads; SPARC T4-4 205,792.0 QphH@3000GB, $4.10/QphH@3000GB, available 5/31/12, 4 processors, 32 cores, 256 threads; SPARC Enterprise M9000 386,478.3 QphH@3000GB, $18.19/QphH@3000GB, available 9/22/11, 64 processors, 256 cores, 256 threads; SPARC Enterprise M9000 198,907.5 QphH@3000GB, $15.27/QphH@3000GB, available 12/9/10, 32 processors, 128 cores, 128 threads; IBM Power 780 QphH@3000GB, 192,001.1 QphH@3000GB, $6.37/QphH@3000GB, available 11/30/11, 8 processors, 32 cores, 128 threads; HP ProLiant DL980 G7 162,601.7 QphH@3000GB, $2.68/QphH@3000GB available 10/13/10, 8 processors, 64 cores, 128 threads. ; HP ProLiant DL980 G7 158,108 QphH@10000GB, $6.49/QphH@10000GB available 4/15/13, 8 processors, 80 cores, 160 threads. 38 Copyright © 2013, Oracle and/or its affiliates. All rights reserved.