ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, 28-29 January 2014 Telescope Calibration Planning Dominique Broguière TelCal planning Ressources : TelCal group Current status Plan for R10.8 and 2014 releases Future releases (after 2014) ICT-CPM2 28-29 January 2014 TelCal group ICT TelCal : 1.3 FTE Dominique Broguiere, lead, 0.8 FTE Jean-Christophe Roche, developer, 0.5 FTE SubSystem Scientists Denis Barkats Baltasar Vila Vilaro (Deputy) Other contributions Robert Lucas • Holography package • Scientific support ICT-CPM2 28-29 January 2014 Current status : Online calibration Calibration Delivered Phase Cal x Ampli Cal x Bandpass x Delay x Pointing x Focus x - new method : holographic focus Atmosphere x - Improve efficiency by using only sky scans WVR x - On-line validation in progress - improvement : use actual frequency range of WVR spectral channels and WVR coupling efficiency x - Using side band rejection, needs a little work in side band separation mode - delayed until new sideband separation mode available Sideband ratio ICT-CPM2 28-29 January 2014 Status CPM1 Status CPM2 Current status : Offline calibration Calibration Delivered Tower Holography x Astro Holography x Antenna Positions x - improved : weight scans using delay or phase error Pointing model x - option added to fit the model Primary Beam x - available as a CASA task (tc_primarybeam) ICT-CPM2 28-29 January 2014 Status CPM1 Status CPM2 - Use on-line WVR correction :done Current status (3/3) Other delivered features in R10.2, 10.4 or 10.6 Offline TelCal Tasks features • Plot improved (summary plots added, new options, etc...) • Speed increased (ASDM read once, useless data not read, etc...) • Appending results to an existing ASDM enabled Online features • TelCal behaviour adapted when no wvr is available • Performance improvements : parallelization of Bandpass engine • Binary flags taken into account • TelCalSpy : new results displayed APP features • New event (AppPhaseReduced event), ASDM table (CalAppPhase table) and engine (calculation of phase offsets between antennas) • Implemented in the same way than other TelCal engines • Successfully tested (simple phasing) ICT-CPM2 28-29 January 2014 Plan for R10.8 and 2014 releases (1/2) Priorities are defined in collaboration with SubSystem Scientist. ALMA-10.8 : Off-line mode TelCal Standalone software : user-interface improvements Performances Optimizations in ATM library Parallelization of Atmospheric engine (Tsys calculation) needed in FDM mode Redhat 6.5 upgrade Test needed, especially for fortran code (clic) ICT-CPM2 28-29 January 2014 Plan for R10.8 and 2014 releases (2/2) 2014 releases : Dual mode Sharing data (totalpower and correlator data) in the same Telcal component to improve atmospheric calibration Scan sequence with interspersed telescope calibration – Provide a method to CONTROL, that returns an evaluation of computing time for each calibration Engines improvements Zero power subscan/scan (bias detector measurement) Error calculations in Sideband gain measurement Automatic flagging of noisy basebands/ polarization in calibrations Plan may be modified to reflect changes in priorities ICT-CPM2 28-29 January 2014 Future releases Features depending on Control schedule shadowing flag sideband separation subarrays (no specific development, just testing) multi-resolution mode (no specific development, just testing) Improvements in calibration algorithms Need analysis and proposals from astronomers Topics : • on-line WVR correction • long baselines • high frequencies Error calculations Error calculations are missing in some results Reduced chi square calculation gives incorrect results in Pointing engine ICT-CPM2 28-29 January 2014