GEPCO 2nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010 1 2 ROUSCH P/H 500KV GRIDS & TRANSMISSION LINES 500KV G/S SH: MULTAN MOHAMMADI MULTAN 500KV G/S M/GARH GATTI 500KV G/S PESHAWAR LAHORE (SHEIKHUPRA) TARBELA P/HOUSE 500KV G/S NEW GHAKHAR (NOKHAR) 500KV G/S RAWAT GHAZI BROTHA P/HOUSE 3 GEPCO NTDC SOURCES 220KV CIRCUITS REWAT-2 500KV GSS GHAKHAR(NOKHAR) 03 No. 600MVA, 500/220KV POWER T/Fs HAFIZABAD LAHORE (Shp) HAFIZABAD LAHORE (Shp) SHAHEENABAD-1 SHAHEENABAD-2 03 No. 160MVA (EACH) 220/132KV POWER T/Fs MANGLA RAWAT 132KV GSS FATEHPUR AROOP-1 AROOP-2 FUTURE 500KV CIRCUITS REWAT-1 MANGLA 132KV CIRCUITS Q.D. SINGH MANGLA GHAKHAR MANGLA MANGLA MANGLA 220KV GSS GHAKHAR 04 No. 160MVA, 220/132KV POWER T/Fs GUJRAT-1 GRW CANTT AWAN CHOWK GRW 220KV CIRCUITS 132KV GSS 220KV GSS SAHUWALA(SIALKOT) 03 No. 160MVA, 220/132KV POWER T/Fs 132KV GSS 132KV CIRCUITS 132KV GSS DASKA IND. WAZIRABAD MANGLA 220KV CIRCUITS MANGLA MANGLA THERI SANSI RAVI RAVI GATT-1 GATT-1 220KV GSS K.S KAKU 03 No. 160MVA, 220/132KV POWER T/Fs KAMOKI NEW SIALKOT GHUINKI KOLI LOHARAN BADHOMALHI VIA NARANG KOLI LOHARAN SAMBRIAL P/ROAD SIALKOT BAND ROAD Note:• 225 MW HUBCO (Narowal) Power House is expected in circuit during Nov-2010 to Mar-2011. It will give relief to 220KV Sahuwala & 220KV Kala Shah Kaku G/Stations. • 425 MW Nandipur Power House is expected circuit during Dec-2010 to Mar-2011. It will give relief to 220KV Ghakhar G/Station • Hence there will be no constraint on 220/132 KV system in GEPCO. 4 GEPCO SECONDARY TRANSMISSION AND DISTRIBUTION SYSTEM As on 30-09-2010 Grid Stations • • • • Total 500/220/132/11KV Grid 220/132/11KV Grids 132/11 KV Grids 66/11 KV Grids Power Transformers 01 No 02 Nos 41 Nos 08 Nos 52 Nos *124 (2870 MVA) * 4 No P.T/Fs 132/66 KV not included Secondary Transmission Lines • 132 KV Lines (Circuit Wise) • 66 KV Lines (Circuit Wise) Total 1669 KM 335 KM 2004 KM Distribution Lines • 11 KV or HT Feeders • Length of HT Lines •Length of LT Lines Distribution Transformers 625 Nos 19870 KM 16801 KM 48799 Nos (3027 MVA) 5 GEPCO FIELD FORMATIONS Sr. No. Formation Circle Division SubDivision Total 1 G.S.C 1 2 4 7 2 G.S.O 1 3 16 20 3 Project Construction 1 4 8 13 4 Operation 4 23 113 140 5 Computer Center 3 - - 3 6 Technical Services (M&T) 1 4 - 5 7 Civil Works - 1 4 5 8 R.Os - 23 - 23 08 Nos. Field Stores 9 9 Regional/ Field Store Total 1 No. Regional Store 225 10 Officers Sanctioned-399/Actual-303 11 Officials Sanctioned-15,921/Actual-13,400 6 GEPCO CUSTOMER PROFILE ENDING 09/2010. Category Number of Customers % Customers % Consumption % Revenue Domestic 2,116,104 85.5 63.0 54.8 Commercial 272,744 11.0 6.4 11.3 Industrial 50,538 2.0 20.6 24.8 Bulk 132 0.005 3.6 3.5 T/Wells 34,891 1.4 6.3 5.5 Others 469 0.02 0.1 0.1 Total 2,474,878 100 100 100 7 COMPANY STATISTICS & PROJECTIONS FY 08* FY 09* FY 12 FY 13 2,282,084 2,356,305 2,662,695 2,773,463 Peak 1,590 1,749 1,813 1,885 1,960 2,040 U. Purchased, (GWh) 6,839 6,695 6,987 7,565 8,325 9,160 U. Sold (Gwh) 6,077 5,957 6,220 6,734 7,407 8,148 Losses, % 11.14 11.03 10.98 11.00 11.00 11.00 Collection Ratio1, % 98.40 98.50 98.61 99.00 99.00 99.00 AT&C Efficiency 87.44 87.64 87.78 88.11 88.11 88.11 SAIFI – 11 KV - 400/230V 19.26 20.39 17.09 17.31 16.61 16.84 15.00 15.00 14.00 14.00 13.00 13.00 SAIDI – 11 KV - 400/230V 18.41 16.30 16.71 19.40 15.90 18.89 15.00 16.00 14.00 15.00 13.00 13.00 Consumers, No. Computed Load, MW FY 10* FY 11 2,454,254 2,556,351 8 GEPCO PROGRESSIVE DISTRIBUTION LINE LOSSES JUL 2010-SEP 2010 VS JUL 2009-SEP 2009 (11 KV & below system) Units (Millions) Received Billed Lost % Loss Jul-10 to Sep-10 2287.40 1998.46 288.94 12.63 Jul-09 to Sep-09 2229.99 1929.21 300.78 13.49 Period % Inc/ Dec -0.86 OVERALL COMPANY LOSSES (132 KV & below system) Units (Millions) Received Billed Lost % Loss Jul-10 to Sep-10 2331.93 1998.46 333.47 14.30 Jul-09 to Sep-09 2251.66 1929.21 322.45 14.32 Period % Inc/ Dec -0.02 9 GEPCO ANALYSIS OF PROGRESSIVE BILLING AND COLLECTION JUL 2010-SEP 2010 VS JUL 2009-SEP 2009 (Rs.in Million) Billing %Collection of Billing Collection Period Govt. Pvt. Total Govt. Pvt. Total Govt. Pvt. Total Jul-10 to Sep-10 873 17,616 18,489 492 16,828 17,320 56.4 95.5 93.7 Jul-09 to Sep-09 646 12,448 13,094 453 11,185 11,638 70.2 89.9 88.9 Rs.M 227 5,168 5,395 39 5,643 5,682 % 35 42 41 9 50 49 Inc. with Prev. Year 10 KPI Performance Description Target Jul-Sep 2010 Actual Jul-Sep 2010 Weighted score Operational & commercial (40%) Line losses % 14.30 14.30 7.50 Collection ratio % 89-00 93.70 15.00 Transformer failure ratio % 0-009 0.008 2.00 Line failure rate – below 20 min % 0-420 0.478 0.50 Line failure rate – above 20 min % 0.150 0.183 0.00 Defective meters as % of total % 0.120 0.00 4.00 29.00 Financial (20%) Cash in transit (monthly avg.) Mn Rs 250 416 0.00 O&M expenses Rs./Kwh Rs 0.503 0.453 8.00 8.00 KPI Performance Description Target Jul-Sep 2010 Actual Jul-Sep 2010 Weighted score Capital expenditure (15%) Capitalization – A-90 form Mn Rs 300 682 5.00 Secondary transmission grids Mn Rs 196 51 0.00 Distribution of power Mn Rs 75 21 0.00 Energy loss reduction Mn Rs 75 27 0.00 Rural electrification Mn Rs 0 0 0.00 5.00 Customer relation management (5)% New connections No 21,233 20,792 0.75 Customer faciliation % 90.00 90.00 1.00 Supply complaint resolution % 88.00 88.00 1.00 Billing complaint resolution % 8900 89.00 2.00 4.75 KPI Performance Description Target Jul-Sep 2010 Actual Jul-Sep 2010 Weighted score Human resource management (10%) Officers strength – Occupancy % 80.00 75.00 1.00 Staff strength – Occupancy % 80.00 85.00 2.00 Resolution of disciplinary cases % 16.00 25.00 1.00 Settlement of audit paras % 11.00 12.00 1.00 Officers training % 2.00 1.00 0.00 1.00 3.00 2.00 Staff training 7.00 Employees safety (10%) No of accidents – fatal No 0 4.00 0.00 No of accidents – non fatal No 8 1.00 4.00 4.00 TOTAL 57.75 FUTURE WORK PLAN A. UNDER ADB LOAN Sr. No. Name Of Grid Type Proposed Capacity (MVA) Completion Schedule 80 2011-12 80 2011-12 80 2012-13 80 2012-13 52 Completed in 2010-11 52 2012-13 52 2012-13 NEW GRID STATIONS 1 Sheranwala Bagh (Gujranwala) 2 New Daska 3 Gohad Pur (Sialkot) 4 Khiali Bye-Pass (Gujranwala) GIS AIS CONVERSION 5 Fateh Pur 6 Kolo Tarar 7 Jalal Pur Nau AIS B. UNDER KOREAN LOAN (EXIM BANK) NEW GRID STATIONS 1 Old Power House Sialkot 2 GIS 78 2012-13 Chianwali 78 2012-13 3 G.T. Road Gujrat 78 2012-13 4 Hafizabad-2 78 2012-13 5 Pindi Bhattian 78 2012-13 6 Phalia 52 2012-13 7 Awan Sharif 52 2012-13 AIS 14 Achievements & Corporate Goals Activity Past Achievements Future Goals/Objectives Customer service centers 141 150 Complaint resolution 87% 90% 0.29% 0.20% 18.262 Mwh / Rs. 135 Mn 20 Mwh / Rs. 140 Mn 98.61% 99.00% 6/15 0/0 10% / 14% 25% / 25% Rs. 266.50 Mn Rs. 200.00 Mn Implementation of ERP including customer care and billing solutions Defective meter as % of total Theft detection Recovery Employee safety fatal/non fatal Training officers/staff Improvement in cash cycle – Cash in transit monthly average 15 Financial Summary FY 08* FY 09* Unit Summary, Rs/kWh PPP – Unadjusted 3.59 5.82 PPP – Adjusted 4.06 6.52 Distribution Margin 0.63 0.67 Prior Period Adj. 0.86 Total 4.69 8.05 Actual Revenue 4.80 7.44 Variance, Rs/kWh 0.11 (0.61) Income Statement Summary, Rs Million Sales Revenue + GOP Subsidy - PPP - Operating Expenses + Non-operating Inc. - Fin. & other Exp. = EBT -Taxes = Net Income * Actuals FY 10* FY 11 FY 12 FY13 7.18 8.02 0.73 0.80 9.55 9.25 (0.30) 6.75 7.59 0.91 0.43 8.93 8.93 - 6.75 7.59 0.91 8.50 8.50 - 6.75 7.59 0.91 8.50 8.50 - 25,986 3,204 30,326 13,976 40,075 17,432 47,600 12,535 62,960 - 69,258 - (32,247) (3,521) 1,272 (1,076) (6,382) 42 (6,340) (40,264) (4,236) 1,474 (300) 975 (541) 434 (50,152) (4,873) 1,476 (335) 3,623 523 4,146 (51,100) (5,526) 1,445 (80) 4,874 4,874 (56,195) (6,080) 1,590 (150) 2,125 2,125 (61,830) (6,688) 1,750 (405) 2,085 2,085 17