CEER Presentation - European Energy Regulators

advertisement

Connecting markets

Pamela Taylor, Ofgem

Gas Target Model, 3 rd stakeholder workshop

11 th April 2011, London

What are we trying to achieve?

1. Where technically feasible gas should flow to where it is valued most

• Greater price convergence

2. Efficient use of cross-border infrastructure

• Capacity hoarding must be avoided

• Contractual congestion must be avoided

• Amount of offered capacity must be maximised

Gas Target Model, 3 rd workshop, 11 April 2011, London 2

Existing policy proposals – out for consultation

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission

Network

Draft for Consultation

DFGC-2011-G-001

3 March 2011

ACER’s Capacity Allocation

Framework Guideline

- Auctions

-Bundled products

European Commission’s proposals on Congestion Management

Procedures

- Capacity overbooking – firm

UIOLI

- Restriction of renominations

Objective is for short term firm capacity to allow for more short term gas trading

Gas Target Model, 3 rd workshop, 11 April 2011, London 3

What are we observing today?

Source: http://ec.europa.eu/energy/observatory/gas/doc/qregam_2010_quarter3.pdf

Markets are still not developed in all parts of Europe

Progress has been made, but more needs to be done

Gas Target Model, 3 rd workshop, 11 April 2011, London 4

Option 1: explicit, continuous

• Explicit capacity allocation with continuous trading Example for “overselling”:

-Shipper A books 100 units of capacity

• Explicit auctions (CAM FG)

-Shipper A nominates 50 units

• Bundled Products -TSO assumes that shipper A will not use remaining 50 units, TSO sells them day-

• No gate closure, no restriction of renomination rights ahead

-Shipper B buys remaining 50 units off

• Overselling

• Interruptible Use It Or Lose It

TSO

-Shipper A has paid for 100, but only

• All capacity is financially firm

(not necessarily physically firm) used 50 units

 Capacity hoarding is a bad deal!

 TSO takes a risk and needs appropriate incentives

Has been effective in GB, but requires NRAs to set appropriate incentives

Gas Target Model, 3 rd workshop, 11 April 2011, London 5

Option 2: explicit, gate closure

• Explicit capacity allocation with gate closure

Example of Gate Closure with firm UIOLI or UIOSI

Shipper A has 100 units in long-term contract

-Shipper A nominates 50 units, it loses or is paid for the remaining 50 units (or a proportion thereof)

TSO sells shipper A’s remaining 50 units (or a proportion thereof) in day-ahead auction on a firm basis

- Shipper B buys the 50 units, nominates only 20, so loses the remainder intraday

- If shipper A wants to increase its nomination, it buys additional capacity intraday

Long-term market

(explicit capacity allocation)

Gas day

Nomination

Intra-day shipper trading

Use it or lose it: unused capacity is sold through auction or FCFS

Firm day-ahead auction of any capacity that was not nominated ( Use It Or Sell It )

Gas trading would shift to where auction takes place, but can be adapted to allow for renomination during the gas day

Gas Target Model, 3 rd workshop, 11 April 2011, London 6

Option 3: implicit auctions

More efficient than explicit capacity auctions as it removes risk of separate transactions and allows markets to merge where no physical congestion

Gas Target Model, 3 rd workshop, 11 April 2011, London 7

CWE market coupling in electricity

Before CWE coupling After CWE coupling

100

90

80

70

60

50

40

30

20

10

0

5-Oct 12-Oct 19-Oct 26-Oct 2-Nov 9-Nov 16-Nov 23-Nov 30-Nov

Belpex Belgium

EPEX France

APX Netherlands

EPEX Germany

Gas Target Model, 3 rd workshop, 11 April 2011, London 8

What is needed for implicit allocation?

• A party to do the coupling – exchange or

TSO

• Can be same party for both price areas (e.g.

ITVC in electricity)

• Can be two parties that cooperate (e.g. CWE in electricity)

• Algorithm for determining flows and prices

• Firm network capacity

Gas Target Model, 3 rd workshop, 11 April 2011, London 9

Option 4: implicit, continuous

• Can be used FCFS or implicit auctions

• FCFS day-ahead not compatible with CAM FGs?

• Series of implicit auctions may disperse liquidity but more auctions allow for flexibility

• Arbitrages realised by the TSO from low price area to high price area with implicit allocation of capacity valued at the day-ahead price spread

(GRTgaz-Powernext market coupling work)

Auction gate closures

Long-term market

(explicit capacity allocation)

Day-ahead/ intra-day

Implicit allocation

Continuous implicit allocation may be a solution to allow for efficient gas flows while keeping the flexibility provided by continuous trading?

Gas Target Model, 3 rd workshop, 11 April 2011, London 10

Interactions with long-term gas trading

• If short term capacity is freed-up, what should be the reserve price?

• Zero reserve price allows capacity to be re-allocated at 0 cost if there is no congestion

• If congestion, auction price will rise above zero

• Will a zero reserve price change shippers behaviour and move markets towards the short term?

• In non-peak periods maybe more reliance on short term

• Peak period: long-term capacity still needed

0

No interconnection

High level of interconnection capacity

Interconnection capacity

Surplus interconnection capacity

Some markets have higher proportion of transit than others

Gas Target Model, 3 rd workshop, 11 April 2011, London 11

Interactions with long-term gas trading

Options for reserve prices for short term capacity

1. No reserve price (solution in electricity) but in gas domestic tariffs subsidise transit flows?

2. Set a reserve price to recover costs- impact on price convergence at congested points?

3. Set a reserve price at non-congested points but not at congested

4.

No reserve price at interconnection points but a ’membership fee’ at enduser exit points a.

Flat rate b.

Based on flows

Need a redistribution mechanism

Gas Target Model, 3 rd workshop, 11 April 2011, London 12

Interactions with long-term gas trading

How could a redistribution mechanism work?

1. Each NRA sets its TSO revenue requirements – identify how much needed for domestic network and how much for transit.

• Country A – 400 Euros domestic, 100 Euros transit

• Country B – 300 Euros domestic, 200 Euros transit

2. Each NRA sets membership fee to recover: a. Agreed amount form end-users for national network

• Country A - to recover 400 Euros from end-users and

• Country B 300 Euros from end-users b. Estimate amount from congestion revenues

• Country A & B recover at the interconnected point 150 Euros in congestion revenues (300

Euros is needed for transit) c.

Country A & B (or ACER) set a ‘membership fee’ to recover shortfall

• 150 Euros d. Congestion revenues and membership fee combined and redistributed

• 100 Euros to Country A and 200 Euros to Country B

Gas Target Model, 3 rd workshop, 11 April 2011, London 13

Initial conclusions

1. Short term firm capacity is needed

2. Explicit continuous model has been successfully implemented in GB but needs incentivises for TSOs

3. Explicit gate closure may alter gas trading but will free up unused capacity and allows for renominations during gas day

4. Implicit auctions are worth exploring via pilot projects; more efficient than explicit auctions

(electricity experience)

5. High proportion of transit capacity so pricing and redistribution of revenues is key for any model

Gas Target Model, 3 rd workshop, 11 April 2011, London 14

Thank you for your attention!

www.energy-regulators.eu

Gas Target Model, 3 rd workshop, 11 April 2011, London 15