Presentation from mini

advertisement
New Offshore Wind Tenders in Denmark
Invitation to dialog
Call for tenders for Horns Rev 3 and Kriegers Flak
Director Hanne Windemuller
New Offshore Wind Tenders in Denmark
Today
•Introduction
•Presentation of Horns Rev 3 and Kriegers Flak
•Presentations and discussions on the 12 questions for dialog
•Summary of the result of the first round of dialog concerning
pre-investigations.
Coffee break at 14.25
New Offshore Wind Tenders in Denmark
New offshore projects
Horns Rev 3: 400 MW
Kriegers Flak: 600 MW
Tender for 450 MW near
shore wind farms
50 MW turbines for
research and development
Horns Rev 3
Kriegers Flak
New Offshore Wind Tenders in Denmark
Role of the Danish Energy Agency
Responsible for the call for tenders
Contracting authority
Responsible authority for EIA offshore
One-stop-shop for permits
New Offshore Wind Tenders in Denmark
Role of Energinet.dk
Finance, construct and operate platform and sea cable
Bringing power from new OWF ashore and strengthen
grid
Secure that grid connection is available in due time
Conduct pre-investigations and EIA for the offshore
wind farms
New Offshore Wind Tenders in Denmark
The tender proces
Negotiated procedure with prequalification and dialog
Focus on competition and dialog
The dialog:
Bilateral meetings May 27 – 30
Deadline for written contributions June 7
New Offshore Wind Tenders in Denmark
Horns Rev C Platform Design
400 MW Transformer Platform
Point of interface to the Concession Owner
New Offshore Wind Tenders in Denmark
Horns Rev 3: Layout of the Grid-connection
Platform, 3 pcs. 140 MVA transformers
Blåbjerg, new 220 kV GIS Cable Station,
Platform
HRC
Offshore cables, 220 kV
Location B:
34 km
Blåbjerg
Onshore Cables, 220 kV
HR2 rute:
58,0 km
Short rute:
47,0 km
Overheadlines, 400 kV
Total OHL length: 29,3 km
Endrup
Revsing
Holsted
Onshorecables, 150 kV
Rute:
15 km
New Offshore Wind Tenders in Denmark
Horns Rev 3: Platform location
• Platform located 34 km from the
Coastline
• Water depths at platform
positions: app. 18 meters
• Platform to be located at the
perimeters of the area for the
turbines.
New Offshore Wind Tenders in Denmark
Kriegers Flak
•
•
Combined Grid Connection
Wind Farm and Interconnector
•
Cooperation with 50Hertz
Transmission GmbH
•
CO-financed by the European Union
•
In operation from July 1st 2018
•
Grid connection – two AC platforms
•
400 kV AC connection in Ishøj
New Offshore Wind Tenders in Denmark
Kriegers Flak 600 MW in the Baltic Sea
Pre-investigation area devided in
two: West 69 km2 East 110 km2
Central area reserved for gravel
extraction
Platform locations fixed:
West 200 MW AC East 400 MW AC
(+ 600 MW HVDC platform)
Wind Turbine location allowed
within West and East area.
Kriegers Flak
New Offshore Wind Tenders in Denmark
Conditions for prequalification
• DEA will conduct a prequalification of potential tenderers
• Requirements for financial and technical capacity
• Only prequalified tenderer will be entitled to submit a tender
• Requirements adapted to the company set-up of the
individual applicants
New Offshore Wind Tenders in Denmark
Requirements for financial capacity
• Expected projectsum may amount to no more than 25 % of
the tenderer’s business (or parent company)
• Equity-ratio requirement of 20 %
• Credit rating of BBB- with ”Standard & Poors”, ”Moody’s” or
”Poors”
• Submit general financial information on earnings for the past
3 years, equity capital, equity ratio and EBIT margin (all in the
consortium)
New Offshore Wind Tenders in Denmark
Requirements for technical capacity
• Documenting experience in:
– project development and establishment of offshore wind
farms or other large –scale offshore installations
or
– operation of large offshore wind farms above a specific
size, e.g. 100 MW
• Question: Any questions to the requirements under
consideration for financial or technical capacity?
New Offshore Wind Tenders in Denmark
Compliance with tender
•
•
•
•
Compliance penalty
Bank guarantee placed as collateral for the penalty
400 mill. for Horns Rev 3 and 600 mill. for Kriegers Flak
Bank (first of declaration of intention and later of guarantee)
needs ratings with “Standard & Poors” of A-, with Moody’s” of
A3 and with “Fitch” of A-.
• Guarantee released when spent 1 bn. in establishment of
Horns Rev 3 or 1 ½ bn. on Kriegers Flak
• Question: Will the intended model on compliance penalty
influence interest in tendering the wind farms? Will this
affect the price offered?
New Offshore Wind Tenders in Denmark
Award criteria
• Lowest price is the only award criterion
• Open to include other criteria than price, if
– the criteria are reasonable and relevant
– contribute to increased competition
– without additional costs for the tenderer
• Question: What criteria other than price could be relevant ?
New Offshore Wind Tenders in Denmark
Financial terms
• The price supplement is the difference between the ”price
pr. kWh bid” and the spot price for electricity
• The supplement will be given for the first 20/30 TWh
• No price supplement in hours with negative spot prices
• Compensation for delayed grid connection and for limits on
production.
Questions:
• Is the supplement for 20/30 TWh the right level?
• Other comments?
New Offshore Wind Tenders in Denmark
Timetable for tendering procedure
Horns Rev 3
2013 2014 2015 … 2020
2
September
September
2013
2014
From
1 January
2017
Early
2015
DeadlineContract
forcontract
preliminary
notice
tenders
Guaranteed
connection
the grid
Concession
andtoconstruction
permit
1 December
Early
2020 2014
29
November
2013
binding
tenders
Full
operation
of offshore
farm
Deadline
for prequalification
New Offshore Wind Tenders in Denmark
Timetable for tendering procedure
Horns Rev 3
2013 2014 2015 … 2020
Questions:
• Timing of prequalification?
• Other comments?
New Offshore Wind Tenders in Denmark
Timetable for tendering procedures
Kriegers Flak
2013 2014 2015 … 2020
From
1 July
2018
February
2014
29
April
2015
Guaranteed
the grid
noticetotenders
DeadlineContract
forconnection
preliminary
Early
29
31 April
August
2020
2014
2015
Full
Deadline
operation
Prequalification
for binding
of offshore
tenders
farm
September/October 2015
Concession contract and construction permit
New Offshore Wind Tenders in Denmark
Timetable for tendering procedures
Kriegers Flak
2013 2014 2015 … 2020
Questions:
• Timing of prequalification?
• Other comments?
New Offshore Wind Tenders in Denmark
Compliance with deadline for completing
the wind farms
The political energy agreement:
The two wind farms are in full production from 1 January 2020.
Questions:
• How can DEA ensure a fair and sufficient incentive to
complete the farms before 2020?
• Will an economic incentive/sanction affect the interest in the
tender?
• Will the incentive affect the price offered?
New Offshore Wind Tenders in Denmark
Capacity of the farms
A required minimum of 395/595 MW and a maximum of
405/605 MW for Horns Rev 3 and Kriegers Flak respectively.
New Offshore Wind Tenders in Denmark
Horns Rev 3 area is reduced
New Offshore Wind Tenders in Denmark
Maximum area for construction
Maximum area: 44 km2 per 200 MW is being considered.
Question: Would a smaller area than 44 km2 per 200 MW
be acceptable and if so, how small could the area be?
New Offshore Wind Tenders in Denmark
Concession for Kriegers Flak - one or two?
Question: Should it be possible to
split Kriegers Flak into two
concessions?
Kriegers Flak
New Offshore Wind Tenders in Denmark
Horns Rev C Platform Design
400 MW Transformer Platform
Point of interface to the Concession Owner
New Offshore Wind Tenders in Denmark
Horns Rev 3: Platform location
• Platform located 34 km from the
Coastline
• Water depths at platform
positions: app. 18 meters
• Platform to be located at the
perimeters of the area for the
turbines.
New Offshore Wind Tenders in Denmark
Horns Rev C Platform – Design decisions
• HRC will be designed based on the Anholt platform
• 3 pcs. of 140 (200) MVA transformere to be installed at the
Topside – point of interface to the Concession Owner
• LV-supply (auxiliary power): 3 pcs aux.transformers and 2 pcs
of dieselgenerators
• MV earthing resistors to be designed and installed by
Concession Owner
New Offshore Wind Tenders in Denmark
Horns Rev Platform – Electrical diagram
Room B
Room A
Wind turbine radials
Room C
Wind turbine radials
*)
Wind turbine radials
*)
NC
NC
MV busbar 1a
MV busbar 1b
*)
NO
NO
NC
MV busbar 2b
MV busbar 2a
MV busbar 3a
MV busbar 3b
NO
Concession Owner
Energinet.dk
*)
*)
D
220/MV kV
140 (200) MVA
Y
Z
Y
Aux. Power 1
MV/0.4 kV
630 kVA
*)
D
220/MV kV
140 (200) MVA
Z
Y
Y
Aux. Power 2
MV/0.4 kV
630 kVA
220/MV kV
140 (200) MVA
Grid voltage in the wind farm:
33 kV or 66 kV
Number of wind turbine radials:
at 33 kV:
12 stk. (3 x 4 )
at 66 kV:
9 stk. (3 x 3)
D
Z
Y
Y
Aux. Power 3
MV/0.4 kV
630 kVA
*) Only if 33kV is chosen
220 kV GIS
switchgear
220 kV export cable to shore
New Offshore Wind Tenders in Denmark
Horns Rev 3 - Timeline
Kriegers Flak – MV specification same date as for Horns Rev 3
Kriegers Flak – MV switchgear delivery early 2017
New Offshore Wind Tenders in Denmark
OWF
TSO
Wind park array voltage
MV kV: 33 kV or 66 kV
VSC Converter 600 MW
Y
D
MV
Z Y
150 kV
MV/0.4 kV
630 kVA
Transition
joints
Z Y
NO
HVDC Land cables
600 MW
Ishøj
Exis. station
400 kV
HVDC Submarine
cables 600 MW
DK2
200 MW platform
The KF HVDC platform is to be located
15-30 m from KF 400 MW platform with
1 or 2 bridges between. The 150 kV AC
cables between the platforms is to be
installed on the bridge(s)
83.3 km
8.2 km
150/MV kV
140 (200) MVA
Submarine cable
200 MW
Y
D
±320kV
5.5 km
150/MV kV
140 (200) MVA
MV
Offshore wind farm 200 MW
MV/0.4 kV
630 kVA
Alternative DC Switchtyard
2 x 6 disconnectors
+ 320 kV
To Ishøj
From converter
150 kV
To DC breaker
MV/0.4 kV 630
kVA
From DC breaker
Z Y
D
Y
MV
Cable (in air)
200 MW
Z Y
NO
- 320 kV
To Ishøj
From converter
0.1 km
MV/0.4 kV
630 kVA
VSC Converter
600 MW
D
Cable (in air)
200 MW
*)
To DC breaker
*) For connection in the future
From DC breaker
To Sweden
To Germany
Y
MV
To Germany
*)
150/MV KV
140/200 MVA
150 kV Reactor
50-100 Mvar
MV/0.4 kV
630 kVA
Optional
extension SE
150/MV kV
140/200 MVA
150 kV
DK1
400 MW platform
Legend:
HVDC OSS platform
15 km
D
Y
Z Y
NO
150/MV kV
140/200 MVA
MV
Off shore wind farm 400 MW
To Sweden
±320kV
Contractors
Scope of Supply
Submarine cable
200 MW
Submarine cable
200 MW
150 kV
Baltic 2
Dok.no.: 49652-13 Sag: 12/1297
150 kV
Baltic 1
150 kV
Krigers Flak
Single line diagram
Solution 2xAC + DC
Bentwisch
POD 14-03-2013
New Offshore Wind Tenders in Denmark
Technical Project Description for both sites are published
– and we would like your comments!
Pre-investigations and EIA for:
Horns Rev 3, Project manager: Betina Haugaard Heron, Energinet.dk
Kriegers Flak, Project manager: Pernille Skyt, Energinet.dk
In brief we will present the technical project description for Horns Rev 3
and Kriegers Flak – our main question to you is:
• Will the current draft technical project description ensure the
flexibility necessary to select technical solutions for projects on Horns
Rev 3 and Kriegers Flak?
New Offshore Wind Tenders in Denmark
Technical Projects Descriptions – the overall objectives
The overall objectives of the published technical project descriptions
are:
• Provide description of the main technical parts: wind turbines,
park layouts, foundations design, inter-array cables and
installation methods.
• Use this as the technical foundation for the environmental impact
assessment
• Provide a combination of a “most likely” and a “worst case”
approach
• Enable the EIA to secure as high degree of flexibility as possible in
order to allow the concession winner to design and built the most
optimal offshore wind farm.
New Offshore Wind Tenders in Denmark
Horns Rev 3: Location of pre-investigation area
• App. 160 km2
• Has been reduced since February
2013
• The wind farm area will cover an
area of app. 80-90 km2
• Flexibility for coming developer
New Offshore Wind Tenders in Denmark
Kriegers Flak: Location of pre-investigation area
• Overall area: 250 km2
• Water depths 15 - 30 m
Distance to shore 15 km
• Distance to harbour 20-40 km
• Exclusion zone central in the area. Here
two-three platforms and export cables to
Denmark and Germany, will be
established
• 200MW turbines west of exclusion zone
(pre-investigation area: 70 km2)
• 400MW turbines east of exclusion zone
• (pre-investigation area: 110 km2)
 Flexibility for coming developer
New Offshore Wind Tenders in Denmark
Specifications for different turbines
Turbine
Capacity
(MW)
3.0MW
Rotor
Diameter
(m)
112m
3.6MW
120m
4.0MW
130m
6.0MW
154m
8.0MW
164m
Total Height (m)
135m or site
specific
141,6m or site
specific
153m or site
specific
177m or site
specific
187m or site
specific
Hub Height
above MSL
(m)
79m or site
specific
81,6m or site
specific
88m or site
specific
100m or site
specific
105m or site
specific
Swept
area
(m2)
9,852 m2
11,500m2
Northwind
13,300m2
Anholt Offshore
Wind Farm
-
18,600 m2
-
21,124m2
-
Smallest turbine for Horns Rev 3 and Kriegers Flak: 3.0 MW
Largest turbine for Horne Rev 3 and Kriegers Flak: 8.0 MW
Do you agree ?
Wind farms
New Offshore Wind Tenders in Denmark
Different locations and layouts of turbines have been modelled
3.6 MW:
3.6 MW:
NS: 640 m
EW: 1.170 m
8.0 MW:
8.0 MW:
NS: 1.050 m
EW: 1.781 m
Modelled by DTU Wind Energy, 2013
New Offshore Wind Tenders in Denmark
Kriegers Flak – park layouts
Parklayout - 3 MW turbines
West: 67 turbines
East: 133 turbines
Parklayout - 8 MW turbines
West: 25 turbines
East: 50 turbines
Modelled by DTU Wind Energy, 2013
New Offshore Wind Tenders in Denmark
Turbine foundations
Three main types are included:
• Monopile
• Gravitation
• Jacket
The different types of foundations have
different impacts concerning e.g.:
• Installation noise
• Seabed preparation
• Scour protection
• ‘Footprint’
• Hydrodynamic impacts
• Risk of ship collision
All of this will be covered in the EIA
New Offshore Wind Tenders in Denmark
Technical dialogue: Questions related to Geo Investigations
(UXO, geophysical, geological, geotechnical issues)
Note has been published summarizing the comments in anonymous form,
including answers or responses to the input.
In summary, the following suggestions have been included in the geotechnical
survey program:
• More CPTs at both sites
• Pressure meter tests
• Dynamic laboratory tests
• Acoustic Corer will not be part of the program
Expected publishing dates:
July 2013: Geophysical survey results
31. December 2013: Geotechnical factual reports
28. February 2014: Updated 3D geological models
New Offshore Wind Tenders in Denmark
Technical dialogue: Questions related to MetOcean
Note has been published summarizing the comments in anonymous form, including answers or
responses to the input. Additionally, methodology notes have been published.
In summary:
• No met-masts will be established at the two sites
• The level for MetOcean studies at the two sites will be identical, with natural differences as
existing data from the two areas varies.
• Some developers hold more detailed knowledge on MetOcean data than others in the two
areas. DEA and Energinet.dk will make efforts to equalize the advantage potential developers
may have compared to others.
• Estimations on productivity will not be part of the MetOcean studies.
• Certification of the conducted MetOcean studies, or a verification of a third party is sought.
• Notes describing the methodology for the MetOcean studies are published; please comment!
• Metocean studies will be completed as planned, late 2013.
New Offshore Wind Tenders in Denmark
Road map of the technical dialog 2013
• May 13: Kick-off conference.
• May 27 – 30: Invitation to participate in bilateral meetings.
• May 31: Deadline for written contributions regarding
Metocean.
• June 7: Deadline for written contributions.
• Go to www.ens.dk/offshorewind in order to read more about
the tenders and to subscribe to the newsletter.
New Offshore Wind Tenders in Denmark
Summary point
• The Danish Energy Agency is open to hearing all relevant
proposals and input to ensure that the tendering procedures
reflect current market conditions.
• These may be proposals for contract terms, etc. which may be
able to reduce or increase the price, or enhance knowledge
about market conditions of significance to the price in the
tendering period.
Download