VA Capitol Health Care Network (VISN 5) Department of Veterans Affairs, VHA Construction Program Overview Presentation to Society of American Military Engineers (SAME) 28 February 2014 Presented By: Pedro E. Garcia, VISN 5 Capital Asset Manager (CAM) Integrity Commitment Advocacy Respect Excellence What we do • Capital Asset Management Office: – Network oversight & support as needed: • Construction projects and leases • Energy Program • Facilities Management Operations • Biomedical Engineering • RTLS Implementation • Vehicle Fleet Management & Acquisitions – Capital Asset Master Planning • Partnership with Strategic Planning & IT Offices VETERANS HEALTH ADMINISTRATION VISN 5 - At a Glance Martinsburg VAMC Medical Center Locations Representation Baltimore VAMC & Key Facts • 8 Senators • 17 Congressional Districts • 9 Vet Centers Washington DC VAMC Perry Point VAMC VETERANS HEALTH ADMINISTRATION 3 VISN 5 – At a Glance Square Miles: 19,269 Veteran Enrollees: 227,183 States: 04* VAMCs: 04 CBOCs: 18 Vet Centers: 12 State Veterans Homes: 01 VBA Regional Offices: 02 National Cemeteries: 06 State Veteran Cemeteries: 05 *District of Columbia not included VETERANS HEALTH ADMINISTRATION FY 2013 Mid-Year Budget Review – VISN 5 Pre-Decisional/Not for Public Release 4 VISN 5 - At a Glance • • • • • • Geography 19,269 square miles 4 States and the District of Columbia 4 Medical Centers 18 CBOCs 4 Community Living Centers 2 Domiciliaries Representation & Key Facts • 8 Senators • 15 Congressional Districts • 12 Vet Centers • 1 State Veteran Home • 2 VBA Regional Offices • 6 National Cemeteries • 5 State Veterans Cemeteries Key Facts Partners & Affiliates • • • • • 11 Public Housing Authorities 8 Medical School Affiliates 80 VSO Partners 4 National Unions-10 Locals Department of Defense • 4 Co-located CBOCs w/ MTF • 8 IDES Sites • 2 JIFs Veteran Centric VETERANS HEALTH ADMINISTRATION 5 VISN 5 - At a Glance Facility Complex. VISN 5 FY2012 Care Delivery CBOCs FY 2012 Uniques FY 2012 Outpatient Visits FY 12 Admissions (Acute and LTC) FY 12 Acute BDOC 505 18 148,642 1,796,394 16,984 116,528 Acute Beds Long Term Care Beds Dom Beds 482 561 VA Maryland Health Care System 1B 236 263 193 6 53,169 639,305 6,719 53,025 Martinsburg VAMC 2 71 178 312 7 33,992 462,972 3,123 15,643 Washington DC VAMC 1B 175 120 0 5 68,828 694,117 7,142 47,860 VETERANS HEALTH ADMINISTRATION 6 Transformation Strategy VETERANS HEALTH ADMINISTRATION 7 Capital Investment Strategy VISN Capital Asset Management Plan (CAMP) VISN Strategic Plans VHA Strategic Plan VA Healthcare Delivery Model VA Strategic Plan Veteran Population & Enrollees VETERANS HEALTH ADMINISTRATION VISN-wide CAMP • Focus on identifying overall health outcome goals for enrolled patients relying on VHA for health care and eligible Veteran population and enrolled patient population. • Recognizes that the VISN is the operational center for delivering healthcare to Veterans. • Capital Assets are defined as: – Construction Projects / Leases – Medical & Non-Medical Equipment – Virtual Care Technologies – Information Technology – Vehicle Fleet 8 Strategic Capital Investment Planning (SCIP) process • 10-year Construction/Lease Plan: FY 2016 – 2025 • SCIP is intended to be an integrated comprehensive planning process for capital programs across all Administrations • The overarching goal of SCIP is to establish an improved corporate approach to prioritizing all VA capital investments and to ensure investments are targeted to reduce existing gaps based on projected utilization/workload and other data-driven infrastructure gaps VETERANS HEALTH ADMINISTRATION 9 9 CAMP-SCIP Strategic Capital Focus Areas 1. Safety 2. End Homelessness 3. Virtual Hospital Expansion 4. Improve Environment of Care 5. Home Based Primary Care (HBPC) Expansion VETERANS HEALTH ADMINISTRATION 10 CAMP-SCIP Strategic Capital Focus Areas 6. Expand VA/DoD Partnerships 5. Medical Equipment safety, standardization & replacement plan 6. Vehicle Fleet Plan 7. Energy Plan to reduce consumption 8. Increase Research Program Integration VETERANS HEALTH ADMINISTRATION 11 Special Focus Areas • Mission Critical Utility Sustainment Survey • Physical Security Vulnerability Assessments • Electrical Studies • Hurricane Readiness Study (Perry Point) • Steam Generation Special Studies (Perry Point & Martinsburg) VETERANS HEALTH ADMINISTRATION 12 Existing Gaps Access • Enrollees w/in Access Guidelines – Drive time: – Washington: 83% – VAMHCS: 80% – Martinsburg: 70% VETERANS HEALTH ADMINISTRATION 13 Existing Gaps Wait Time Baltimore Baltimore - LR Perry Point Primary Care (% Met) 83% 93% 89% 97% 93% 91% Specialty Care (% Met) 91% 93% 93% 96% 96% 94% VETERANS HEALTH ADMINISTRATION Martinsburg Washington VISN Total 14 Existing Gaps Supplies-Equip-Prosthetics Amb: LTC Non-Institutional Amb: Dental Clinic Pharmacy Amb: Med. & Othr Non-Surg Special. Amb: Mental Health Programs Amb: Surgical Specialties Amb: Prim Care-Geriat.-Urgent Care Amb: Laboratory and Pathology Amb: Radiology and Nuclear Medicine Inpatient LTC Inpat. Resident. Rehab Mental Health Prog. Acute Inpatient Surgery Acute Inpatient Mental Health Acute Inpatient Medicine Utilization VAMHCS 64% 69% 47% 30% 31% 23% 22% 18% 20% 16% 12% -10% -12% -33% -16% Martinsburg 87% 64% 37% 29% 26% 37% 26% 25% 25% 27% -2% 4% -8% -48% -19% Washington 96% 75% 40% 42% 37% 22% 29% 28% 25% 27% 43% -1% -17% -31% -19% VISN Total 78% 70% 42% 33% 32% 26% 26% 23% 23% 23% 19% -2% -14% -35% - 19% FY22 Projection change from FY12 Baseline VETERANS HEALTH ADMINISTRATION 15 Existing Gaps Space Baltimore (SF) Baltimore-LR (SF) Perry Point (SF) Martinsburg (SF) Washington (SF) Common/Swing/Construction Outpatient Specialty Care Outpatient Mental Health Primary Care Research Ancillary/Diagnostic 281,070 30,530 6,865 59,249 103,936 26,316 49,860 7,614 2,141 7,255 (15,250) (9,490) (246,032) 14,107 (24,301) (18,162) 0 (15,033) 107,905 34,391 36,222 23,474 0 39,884 218,748 90,020 76,158 20,835 4,419 28,766 411,551 176,662 97,085 92,650 93,104 70,442 Acute Inpatient Mental Health LTC: CLC / Hospice Administration 10,965 0 (18,414) 0 53,515 16,138 (48,542) (75,497) (48,250) (11,831) (44,224) 10,454 14,460 18,833 21,533 (35,048) (-13%) (47,373) (-11%) (18,539) (-5%) Acute Inpat. Med. & Surgery 11,215 0 (7,624) 8,002 (29,804) (18,211) (-10%) Support/Infrastructure 19,036 8,500 (156,580) 32,613 84,391 (12,041) (-2%) 530,768 120,283 (625,914) 236,890 548,257 810,282 (13%) Total: VETERANS HEALTH ADMINISTRATION VISN Total (SF) (18%) (30%) (32%) (24%) (35%) (15%) 16 Existing Gaps Facility Conditions Baltimore Baltimore-LR Perry Point Martinsburg Washington VISN Total Mechanical $11,560,626 $412,515 $30,581,539 $18,094,656 $32,236567 $92,985,902 Architectural Electrical $2,467,454 $6,558,633 $1,760,714 $1,239,357 $15,967,860 $17,186,080 $19,420,911 $14,743,610 $26,633,020 $12,419,329 $66,249,958 $52,147,009 $501,663 $547,481 $12,485,858 $5,291,173 $8,497,247 $27,323,421 $0 $0 $2,161,299 $6,240,973 $2,404,566 $10,806,838 $1,730,373 $0 $3,298,934 $1,311,007 $777,686 $7,117,999 Energy $0 $32,221 $0 $4,088,983 $1,662,639 $5,783,842 Water $0 $838,831 $1,342,459 $1,752,421 $208,568 $4,142,279 Sanitary $0 $0 $1,284,712 $0 $2,233,478 $3,518,190 $54,098 $241,416 $1,162,034 $993,196 $392,961 $2,843,707 Storm Water $0 $123,615 $1,853,769 $90,470 $35,650 $2,103,505 Structural $0 $0 $1,276,847 $312,655 $0 $1,589,502 Steam Gen $0 $0 $365,762 $68,761 $0 $434,523 Info. Tech. $0 $0 $13,791 $353,200 $17,507 $384,498 $22,872,846 $5,196,150 $88,016,752 $73,726,209 $87,619,217 $277,431,174 Plumbing Hazmat Transport Access Total: VETERANS HEALTH ADMINISTRATION 17 Existing Gaps Energy Baltimore Baltimore-LR Perry Point Martinsburg Washington VISN Total Sustainability (# of Bldgs Required) 1 1 7 (met w/ 8) 6 1 16 Energy Efficiency (Btu / Facility SF – % Gap met) 42,860 (57%) Combined w/ Baltimore 67,993 (68%) 35,648 (31%) 12,136 (8%) 158,637 (36%) Water Efficiency (Gallons/Facility SF – % Gap met) 43 (182%) Combined w/ Baltimore 17 (38%) 0 (met) 10 (30%) 70 (69%) GHG Emission (Metric Tons – % Gap met) 4,048 (27%) Combined w/ Baltimore 3,980 (27%) 8,111 (53%) 3,709 (20%) 19,828 (31%) 3,809,385 4,438,451 5,793,609 19,204,130 Renewable Energy (kWh) Combined w/ 5,162,685 Baltimore VETERANS HEALTH ADMINISTRATION 18 Existing Gaps Functional & Other • Patient Privacy • Parking • Sterile Processing System (SPS) Criteria • OR Criteria • EoC Patient Safety & Security Compliance • NFPA – OSHA Criteria • ADA Access Criteria VETERANS HEALTH ADMINISTRATION 19 FY 2015 / 2016 Forecast Project Construct CLC Residential Houses Vision for (Major) Location FY 2014 Estimated Size Perry Point Under $100 M TBD TBD DC, LR, MB Under $ 10 M DC / BT Under $ 10 M Construction 47-Bed Domiciliary Martinsburg Under $ 10 M Upgrade Fire Alarm System Perry Point Under $ 20 M Upgrade Electrical Distribution DC, MB DC / Perry Point Under $ 5 M New or Expanded CBOCs CLC & Hospice Expansions Medical / Psych Ward & ICU Renovations Upgrade Chiller Plant / Boiler VETERANS HEALTH ADMINISTRATION Under $ 10 M 20 FY 2014 Forecast Project Location Estimated Size Vision for FY 2014 Multi-Award Task Order Contract (MATOC) VISN-wide $5 M Equipment Planning VISN-wide Under $ 1 M Construct Dementia Unit (CON) Managed Care / ED Improvements & Enrollment Center (CON) Martinsburg Under $ 10 M Baltimore Under $ 10 M Construct Two 12-Bed CLC Residential Wings (DES) Martinsburg Under $ 10 M Construct Dental & Audiology Outpatient Center (DES) Martinsburg Under $ 10 M VETERANS HEALTH ADMINISTRATION 21 FY 2014 Forecast Project (Cont’d) Location Estimated Size Vision for FY 2014 Construct Warehouse (DES) Perry Point Under $ 10 M Renovate Sterile Processing (DES) Washington Under $ 5 M BT, DC Under $10 M BT, LR, DC Under $ 5 M Martinsburg Under $ 5 M HVAC Maintenance, Upgrades & RetroCommissioning BT, LR, PP, DC, MB Under $ 10 M Retrofit CLC for ADA Compliance Perry Point Under $ 1 M Renovate Rest Rooms Misc. Halls & Walls Projects Install New Emergency Generators VETERANS HEALTH ADMINISTRATION 22 FY 2014 Forecast (Cont’d) Vision for FY 2014 Location Project Estimated Size MRI Site Prep Perry Point Under $ 1 M OR Hybrid Conversion Martinsburg Under $ 1 M Linear Accelerator Site Prep Washington Under $ 2 M PP, MB Under $ 5 M Nurse Call Replacements VETERANS HEALTH ADMINISTRATION 23 Additional Information Capital Asset Management • Pedro Garcia – VISN 5 Capital Asset Manager – Pedro.Garcia@va.gov – 410-691-7814 • Steve Reinert – VISN 5 Energy Manager – Steve.Reinert@va.gov – 410-691-0603 • Ann Valliyakalayil – VISN 5 RTLS Manager / Biomedical Engineer – Ann.Valliyakalayil@va.gov – 410-691-7302 VETERANS HEALTH ADMINISTRATION Additional Information Contracting • Scott Sands – VISN 5 Director of Contracting – scott.sands@va.gov – 202-579-6098 • Donyale Smith – VISN 5 Deputy Director of Contracting – donyale.smith@va.gov – 410-303-9640 VETERANS HEALTH ADMINISTRATION Additional Information Contracting (cont’d) • Kandi McDonald – Construction Team Manager – MD/Martinsburg, WV – kandi.mcdonald@va.gov – 410-642-2411 ext. 2920 • Harry Parker – Construction Team Manager - DC – harry.parker@va.gov – 202-745-8000 ext. 58408 VETERANS HEALTH ADMINISTRATION Questions VETERANS HEALTH ADMINISTRATION 27