NCMA Conference dated 14 March 2012

Trends in Services Contracting

According to:

Ms. Themoula (Theme) Poirier

Chief of Contracts, Enterprise Acquisition

Electronic Systems Center, ESC/CAA

1

Theme’s Disclaimer

• My presentation today is from my personal point-of-view and it is not officially the AF’s

CAUTION: The information contained in this briefing is for information purposes only, and may not apply to your situation

NOTHING stated in today’s meeting or throughout these charts should be construed as Government Direction, Government

Commitment, Government obligation or Government Changes!!!

ANY questions concerning your existing or future Government solicitation (i.e. RFPs or RFQs or FOAs) or contract must be handled through the appropriate Government channel/authority

(Example: Your PCO)

BEFORE I proceed, does anyone have any questions on the above?

2

Overview

• Approaches to obtaining services:

– If its not broken then why change the way we do business?

– Types of Services and typical DoD problems in Services Acquisitions

– Framework of Acquisition of Services (the seven steps)

– Step 6 Execute Strategy and the “Why” in shifts in source selection strategies for services

– LPTA Highlights

– Say What? Performance Based Acquisition?

– Putting it all together - Post award administration

3

If it’s not broken then why change the way we do business?

Theme’s Rationale:

• Current budget challenges support discrete decision making

• From a budget and acquisition standpoint, contract services are outpacing hardware purchases Over 51% of the DoD budget is Acquisition of Services

• Dollars are declining, we must find more efficient approaches

• 14 Sep 2010 USD(AT&L) memo -- The Department's practices for buying such services are much less mature Dr Carter's Better-buying Power initiatives:

Improve Tradecraft in Services Acquisition

• Assist users of services to define requirements…

• Enhance competition by more frequent re-competes

• Limit the use of T&M and award fee contracts for services

Contract services are essential to sustaining & maintaining AF mission

Restoring affordability to defense goods & services—biggest “User” complaint – it costs too much to get on contract

• Improvement in Services Acquisition will result in significant reductions in cost at all levels across the Services & DOD organizations

More $ saved = More War-Fighter Capabilities fielded!

4

A Lot of $$ are spent on Services

DOD FY 09 Dollars Spent

DOD Service Categories Spend in Dollars

Construction

Facility

Transportation

Medical

Electronics & Comm

Equipment Related

Knowledge Based Services

Research and Development

6

14

19

18

29

30

41

53

0 10 20 30 40 50 60

OSD Service Contracts

• $212 Billion

• 57% of all contracts in 09

• AF Share: >$34B

5

TYPES OF SERVICES

6

Typical Problems in DOD

Services Acquisitions

• Severe cases of “Cut-and-paste” requirements –

Not analyzing what has changed from last requirement

Lack of understanding of the key performance issues and stakeholder concerns

• Don’t understand difference between a performance objective and a performance standard

Task requirements with no performance standards -- confusion on

“How” to develop a PWS

• Overly specific “Personnel Qualifications” (Butts in Seats)

Business strategy and type of contract decided in a vacuum before requirement has been finalized

7

7 steps to the service acquisition process to procure services

8

Step 6 – Execute Strategy and the “Why” in shifts in source selection strategies for services

Best Value Spectrum

Chart provided by ESC/AQ

Greater Relative Importance of Cost or Price Lesser

Lesser

Lowest Price

Technically Acceptable

(LPTA) Source

Selection Process described in DoD Source

Selection Procedures,

Appendix A

Importance of Non-Cost Factors

Oh! The possibilities!

Mix-n-match tradeoffs:

Greater

Tradeoff Source Selection Process described in DoD Source Selection Procedures

Technical

Technical Risk

Past Performance

Cost or Price

Cost or Price

Non –Cost Factors

• USAF Source Selections now mirror DoD: AFFARs aligned w/new DoD Procedures & Competitive FAR 15 acq over $150k

• Goal: Consistent policy across DoD: DFARs 215.300 PGI (Procedures, Guidance & Info) 04 Mar 11 Memo & SAF/AQC 08

May 11 Policy Memo 9

LPTA Highlights

Chart provided by ESC/AQ

• Lowest Price Technically Acceptable

(LPTA) Source Selection (see FAR 15.101-2)

Lowest Price Technically Acceptable (LPTA) is a process used in competitive negotiated contracting where the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. See FAR 15.101-2.

• Used for acquisition of commercial or non-complex services or supplies which are clearly defined and expected to be low risk

• Shall evaluate cost/price and acceptability of the product or services (consideration of one or more non-price evaluation factors/subfactors)

– Defined ratings for acceptable/unacceptable required for use

• Past Performance shall be used as evaluation factor unless waived by PCO

– Rated on acceptable/unacceptable basis – ratings defined

• Small Business participation is exempted from evaluation

– If determined an appropriate evaluation factor, should be considered one of the

“technical” factors/subfactors

10

EXAMPLES OF LPTA EVALUATION CRITERIA

EXAMPLE OF RECENTLY AWARDED AF A&AS CONTRACTS UTILIZING LPTAs:

Air Combat Command (ACC) Acquisition Management and Integration Center - Contracted Advisory and

Assistance Services (CAAS) IV--LPTA Evaluation Criteria:

- FACTOR 1: Technical acceptability with subfactors: Subfactor 1: Program Management (organizational structure; human resources; quality control plan); Subfactor 2: Organizational conflict of interest plan; Subfactor 3:

Security; Subfactor 4: OCONUS Support and Subfactor 5: Small business Subcontracting Plan (for Large primes business only)

- FACTOR 2 – Past Performance

- FACTOR 3 – Cost/Price

ASC - Aeronautical Systems Center (ASC) - Acquisition of Consolidated Enterprise Support Services

(ACCESS) – LPTA Evaluation Criteria:

- FACTOR 1: Technical Acceptability with subfactors: Subfactor 1: Program Management and Subfactor 2:

Organizational Conflict of Interest Mitigation

- FACTOR 2: Price Evaluation Factor

11

Say What?

Performance Based Acquisition?

Who do you think he looks like?

Involves acquisition strategies, methods, and techniques that describe and communicate measurable outcomes rather than direct performance processes. It is structured around defining a service requirement in terms of performance objectives and providing contractors the latitude to determine how to meet those objectives (via Performance

Work Statements (PWS))

Simply put, it is a method for acquiring what is required and placing the responsibility for how it is accomplished on the contractor

Objectives of PBAS

* Maximize performance

* Maximize competition and innovation

* Encourage and promote the use of commercial services

* Shift in risk

* Achieve savings

12

Example: Good Transportation Metrics

Based on All metrics being within Standard

• Transportation Sub Processes

– On-Base Taxi Response

– DV In Place

– Off-Base Taxi Response

– Air Crew Taxi

– Supply Delivery Time

– Vehicle In Commission

– Vehicle In Commission (Detail)

– Overdue Scheduled Maintenance

10,00

Minutes

Metric 27: Air Crew Taxi Response

Time (Minutes)

Standard = 10 Min

FY07 FY08

5,00

0,00

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP

10

9

8

7

6

5

4

3

2

1

0

Metric 30: Overdue Scheduled

Maintenance

(Vehicles)

Standard = 1 or less

FY07 FY08

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP

100

Percent

Metric 29: Vehicle In Commission Rate

95

90

85

80

Standard = 90 %

FY07 FY08

75

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP

13

How Government evaluates contractor’s performance:

Quality Assurance Surveillance Plan (QASP)

(formerly called the Performance Plan)

• The Government’s systematic method to evaluate the services the contractor is required to perform

• The Government has an obligation to actively manage performance after the supplier is selected

– Government’s job doesn’t stop at contract award

– QASP cites the same performance objectives (contract expectation) and performance thresholds (how it is measured) identified in the

PWS, and specifies the method of surveillance

– Ensures the government receives acceptable contractor performance against contractual requirements

– Contractor is responsible for quality control, not the government

– Minimum surveillance of the contractor is required to ensure contractual compliance

14

Putting it all together - Post award administration

Performance Management - It’s More than “Watching” the Supplier

Effective Supplier Relationship Management

THE NOT TO’S

• Getting the supplier to meet our needs

• “It’s in the contract, now it’s the supplier’s problem.”

• Blame and punish the supplier

• Unpleasant surprises

BECOMES

BECOMES

BECOMES

BECOMES

THE HOW TO’S

• Finding a way to meet both our needs

• Work together to achieve the performance and compensation goals

• Communicate the issues, jointly find solutions

• Integrated planning and communications

Are All of the Supplier’s Team Are On Board?

15

Step Seven – Performance Management

• Contract surveillance

• Prime responsibility of Contracting Officer Representative (COR) is surveillance

• Government COR is assigned and trained IAW AFFARS MP 5346.602-2(d)

• Method of surveillance in the QASP dictates how the COR will evaluate the contractor’s performance

• Establish a Performance Management Team that includes the contractor

• Use the Quality Assurance Surveillance Plan (QASP) to ensure that performance objectives are being met

• Track performance trends and results

• Determine if stakeholder needs are being met

• Develop a change management strategy

• Communicate performance results to stakeholders and customers

• Start planning for replacement contract when appropriate

16

Performance Plan (QASP)

Elements of Performance Plan

Requirements Roadmap Worksheet

Objective

Expectation

A -1

A -2

A -3

Performance

Threshold

Measurement

Incentive

PWS

Paragraph

Plus or Minus Who

COR

Alignment

A -3 a

A -3 b

B -1

B -2

Inspection

Method/Data

Source (Customer

Surveys)

Frequency

Plan Action Results

Will measured Results be traceable back to the Objectives?

17

ANY QUESTIONS????