Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS 8615 100 Bureau Drive Gaithersburg, MD 20899 (301) 975-8701 Email: aaron.forster@nist.gov NESCC HDPE Status: • PPTG report released in January 2013 • Held a workshop on February 28, 2013 to discuss merger of NESCC and ASME HDPE Roadmaps • Continue to Formalize Roadmap with communication between ASME and NRC • Held meeting at NRC on March 14, 2013 to discuss input on short term priorities. • Planning 2nd workshop for April 18, 2013 to further progress in creating a “Joint HDPE Roadmap” plan ASME Roadmap Implementation Issues 1 • Capturing Issues from Regulators and industry • Prioritization of Issues/concerns with input from NRC, DOE, SDOs and industry • Confirm Regulatory acceptance of priorities Planning Resolutions Standards Development Endorsement 2 3 4 5 • Identify projects: utilize • Solicit Contracts ASME’s HDPE with R&D Entities Roadmap, NESCC’s report & other sources • Oversee R&D Projects • Develop project scope • Review Results • Establish tasks, schedule & budgets • Share Final Findings and • Identify target code Outcome with case or standard Committees/NRC • Identify funding • Coordinate with other SDO’s, & government entities. • Obtain regulatory buyin on the plan forward • Confirm regulatory agreement of Issue Resolution • Standards development and writing • Revise or create Technical Concerns, Code Cases or Standards • Consensus process • Adoption to the Code • NRC participation in first 4 phases lead to standards endorsement • Obtain NRC endorsement of new or modified code cases or standards HDPE Roadmap Workshop EPRI Headquarters February 28, 2013 Attendees: • DOE, NRC, ASME, ASTM, EPRI, NIST Objective: Coordinate the NESCC and ASME “Joint Roadmap” efforts. Let’s work from one template. Identify potential short and long term R&D projects, deliverables, and standards impacts. Prioritize projects Identify current efforts on R&D, both confirmatory and new research Deliverables: Consensus Roadmap with basic prioritization Develop an understanding of current efforts and future research efforts required Methodology to track progress at ASME Methodology to prioritize projects and sub-tasks Strategy for Stakeholder engagement (Future Meeting) Move away from a numbered list to an actionable plan…. 1 2 2a 2b 2c 2d 2e 2f 2g 3 4 5 6 6a 6b 6c 6d 7 8 9 10 Need or Concern Thin wall vs. thick wall and thermal gradients Fusion Joints Validated and standardized fusion joint test for short and long term performance Butt fusion standardization and qualification Electrofusion standardization and qualification Essential variables for fusion of all materials Qualification procedure personnel and equipment Long term performance of fusion joints (SCG resistance) Performance based fusion procedure, performance, equipment Expanded standards for fittings and design Allowable stress for service temperature up to 140 F Determination of allowable surface flaw up to 10% of wall thickness Long term performance Creep behavior at elevated temperature and transient temperature and pressure Fracture mechanics qualification for crack growth Substantiation of linearity of HDB curve at 140 F Incorporation of chemical degradation into standards Pipe hangers and supports Seismic design Fire Resistance Visual and volumetric testing qualifications and requirements Identified Need? NRC ASME NRC NRC NRC NRC NRC NRC ASME ASME ASME ASME ASME ASME NESCC NESCC NESCC NESCC NESCC NESCC NRC NRC ASME ASME ASME NESCC NESCC NESCC NRC ASME NESCC NRC ASME ASME ASME ASME NRC NRC NRC ASME ASME NESCC NESCC NESCC NESCC NESCC ASME NESCC 1. NESCC 10-013 – HDPE use by Catawba Nuclear Station, Steve Lefler, Duke Energy 2. NRC Issues Regarding the use of HDPE piping in safety-related nuclear applications, Use of HDPE for Power Plant Piping Systems Workshop, June 7-10, 2010 North Carolina 3. STP-NU-YYY ASME Code Development Roadmap for HDPE Service Pipe in Nuclear Service, under revision 4. NESCC Polymeric Pipe Task Group Report, 2012, balloted for draft Prioritization: • Prioritize according to Code Deliverables: i. Short term (under 3 years) 1. Specify as “A” priority 2. conditioned code case: N755 (Section III) and 808 (Section XI) 3. currently working to finalize these priorities. Hard deadline is April 18, 2013. ii. Med term (under 5 years) 1. Specify as “B” priority 2. Collecting identified research gaps. Negatives resolved to go from conditionally accepted to fully accepted. iii. Long term (under 10 years) 1. Accept conditions and details into ASME code a. N755 (Section III) and 808 (Section XI) 2. Fully accepted code case with no conditions Interconnecting Roadmap Short Term (Conditioned CC) Medium Term (Unconditioned CC) Methodology to Commonize Roadmaps: • Basic level: Do they have the same information • Answering the questions: What are all the issues? Why these issue are critical? What needs to be done for conditional endorsement and then for full endorsement? Priorities within a group? What issues have been resolved, what activities under way including research and what research still needs to be done? Project timing for new activities and research?. Methodology to Track Progress: • • • Go through 1 line of the ASME tracking spreadsheet Go through 1 topic of the research plans Need to switch to Excel during presentation Concerns: • Main concerns (personal view): • • • • • Acceptance of this path forward in ASME volunteer community Developing a champion within the community of stakeholders Stewardship of roadmap Fostering communication between the stakeholders and regulators Funding those tasks that require more than code writing in the short term Stakeholders Meeting Objective: •Educate the economic and operational case for HDPE code acceptance, •Demonstrate the current regulatory and engineering challenges for HDPE usage that have limited deployment, •Identify impact of conditional approval on market development, •Present effort to manage existing ASME and NESCC R&D priorities into one Roadmap to support short and long term design, implementation, and regulatory goals, •Gain feedback from relevant industries regarding implementation and support of this process •Attendees: Utility Operators, Plant Design and Construction, Plastic Pipe producers, NRC, ASME