Consulting services for all industries ABB Reliability Fingerprint Identifies opportunities for productivity, reliability and cost improvement If only it were this simple… I found the problem. The batteries are upside down. © ABB Group April 13, 2015 | Slide 2 Introduction © ABB Group April 13, 2015 | Slide 3 Plant automation provides abundant and valuable process, production and equipment data The ABB Reliability Fingerprint collects and evaluates site data to identify opportunities for productivity, reliability and cost improvement Collected data is used to benchmark your site against leading process industry and manufacturing sites Areas of opportunity are identified and evaluated by ABB process and industry experts Recommendations for sustainable productivity, reliability and cost improvements are provided Benefits © ABB Group April 13, 2015 | Slide 4 Develops snapshot of current practices Benchmarks site against industry best practices Establishes recommendations for site performance improvement Identifies both short and long term benefits Quantifies potential benefits Productivity improvement (OEE) Cost optimization Reliability Develops a strategy that will deliver benefits Qualifies and quantifies opportunities Three-part assessment 1. Overall Equipment Effectiveness (OEE) Composite measure of equipment availability, production rate and quality 2. Maintenance Performance Evaluates maintenance practices: Utilization, Methodology, Performance 3. Reliability Culture © ABB Group April 13, 2015 | Slide 5 Evaluates roles and responsibilities, reliability training, failure analysis Reliability-centered maintenance (RCM) Root cause analysis (RCA) Description Periodic assessment Price based on number of Full-time Maintenance Employees (FTEs) Performed by Reliability Service team 2-Week program (week 1: data gathering, week 2: analysis and reporting offsite) 1-2 consultants per week Deliverable © ABB Group April 13, 2015 | Slide 6 $15,000: <50 FTEs $20,000: 50-100 maintenance FTEs $25,000: 100+ maintenance FTEs Qualitative assessment of plant reliability and improvement plan Quantitative assessment of financial business opportunities Paper Machine (PM) example From the base data provided: PM1 loss est. at 1,163 tons 10% improvement Year 1 = $34,890 (10% x 1,163 x $300) PM2's loss est. at 2,497 tons 10% improvement Year 1 = $74,910 (10%x 2,497 x $300) Total for both machines Year 1 = $109,800 During Year 2: Additional10% PM1 increase PM2 = $31,401 = $67,419 Total for both machines Year 2 = $98,820 Each extra or marginal ton of PM1 availability = $300 ($756/hour) © ABB Group April 13, 2015 | Slide 7 1. OEE assessment Evaluates process and assets Financial Mgr. Maintenance Mgr. Production Mgr. Equipment Availability (A) Production Rate (P) People HR Manager Product Profit Plant VP/Manager © ABB Group April 13, 2015 | Slide 8 Applies proven analysis methodology Measures relationships Equipment availability Production efficiency Rate of quality Uncovers potential benefits Quality Mgr. Quality Factor (Q) Material Supply Manager 2. Maintenance Performance Assessment Includes maintenance cost Financial Mgr. Maintenance Mgr. People Production Mgr. Product HR Manager Quality Mgr. Material Supply Manager Profit Plant VP/Manager Utilization Time spent waiting Craft coordination Availability of drawings Craft flexibility Parts availability Level of rework © ABB Group April 13, 2015 | Slide 9 Methodology • Business processes • Planning • Special tools • Scheduling • Standard jobs library • Rebuild procedures Performance • Skills • Training • Job interruptions • Supervision • Morale • Labor issues • Precision maintenance 3. Reliability Culture Assessment: Roles and responsibilities, reliability training, failure analysis Financial Mgr. Maintenance Mgr. People Production Mgr. Product HR Manager Quality Mgr. Material Supply Manager Profit Plant VP/Manager © ABB Group April 13, 2015 | Slide 10 Review maintenance practices and maintenance culture (planning and scheduling effectiveness) Understand plant reliability culture Identify perceived strengths and improvement opportunities Review organizational structure (job responsibilities, ratios) Identify maintenance and reliability gaps Primary Activities Information Gathering (On- and off-site) 1 Week on-site Pre-arrival data collection packet Collect Data on-site Validate Data Confirm information understanding with Customer © ABB Group April 13, 2015 | Slide 11 Analysis (off-site) 1 Week off-site Develop Metric Charts Draw Cost/Structure Conclusions from Metrics Finalize OEE Calculations Develop OEE Waterfall Develop Business Case with ABB Account Personnel Develop Findings Presentation Complete Executive Summary Delivery (on-site) Present Reports Assessment Evaluation © ABB Group April 13, 2015 | Slide 12 The assessment findings are reviewed by a collaborative Reliability/ABB Field Services Team The team maps service portfolio opportunities to identified performance gaps OEE Overview Total Available Production Time Nonproduction time Planned production time Availability Losses Gross operating time Net operating time Valuable operating time OEE % © ABB Group April 13, 2015 | Slide 13 = Equipment failure Set-up and adjustments Speed Losses Idling and minor stoppages Reduced speed Quality Losses Availability factor (A) Planning Factor (Pf) Defects in process Start-up losses X Performance factor (P) X Quality factor (Q) Availability Factor (A) Performance Factor (P) Quality Factor (Q) Valuable operating time = Planned production time Sample Deliverable OEE Waterfall – PM 1: OEE = 75% PM 1: OEE = 75 % 0 Total Time (hours) (8760 hrs) Steam (2 hrs) Electrical (98.1 hrs) Other (5.1 hrs) Planned Production Time (8654.8 hrs) Scheduled Total Outages (294 hrs) Electrical (120.9 hrs) Mechanical (191.4 hrs) Roll Failures (59 hrs) Instrumentation (6.9 hrs) DCS (15.2 hrs) Hydraulics (4.1 hrs) Drives (13.7 hrs) Operations (332.4 hrs) Breaks (410 hrs) Available Time (7207.2 hrs) Quality Losses (730 hrs) Making Good Product at MPR (6477.2 hrs) © ABB Group April 13, 2015 | Slide 14 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 Maintenance Performance Example: 20 Maintenance Cost is tied to: Maintenance cost as % of facility replacement cost World class 1.5% – 2.0% 14 Your facility 12 10 Example PM#1 - Vibration detects bearing wear 8 6 4 2 0 5 10 15 20 25 30 Facility number © ABB Group April 13, 2015 | Slide 15 Effectiveness of maintenance Skill level and quality of knowledge of personnel Asset type % of unplanned maintenance % of predictive maintenance 35 40 45 Proactive Maintenance Bearing is changed (cost $5,000) Reactive Maintenance Bearing is not changed, Machine fails (cost $100,000) Areas evaluated with fingerprint Reliability Culture Areas 10 9 High dB Avg Site Score Low 8 7 6 5 4 3 2 1 0 RR RM PM ML OS SS PAP CE PA