List of ongoing all project (17.09.13)

advertisement
Statistics & Informatics Division
Bangladesh Bureau of Statistics(BBS)
ADP Projects
Year 2013-14
1
Economic Census-2013 Project
1. Project duration
2. Project approval
date
3. Estimated cost
July 2011- June -2016.
20 March 2012
4. Fund
GOB
5. Objectives
•
•
Tk. 19352.90 lakh
•
•
•
•
To Conduct 3rd Economic Census of Bangladesh in 2013
To collect basic data on activity conducted, persons engaged, year of
establishment, type of ownership etc.
To develop benchmark database for all areas of the country for preparation of
development plans and programmes
To prepare an up to date directory of industries and business enterprises for
urban and rural areas based on Bangladesh Standard Industrial Classification
(BSIC-2009)
To develop sampling frame for planning and designing future surveys of nonfarm economic activities.
To understand the structure of the non-farm economic activities and measure
the relative contribution of non-agricultural sector to the economy.
Economic Census-2013 Project
cont….
Activities
Timeline
Present
Status
MoI
Main
Actor/s
HR
Equipmen
t
Comm
ents
a) Pre Census:
● Updating of Enumeration Area (EA)
and supervisor maps and geo-codes
● Designing and pre-testing of
questionnaire
● Listing of households and data entry
to UISC.
● Pilot Census for verifying overall
preparation for the census
● Preparation of publicity material and
actuation of publicity
May
2012Feb
2013
Done
Listing,
Data
entry,
Committ
ee
formatio
n,
appoint
ment of
SV and
Enu.
18
persons
from
BBS
(Additi
onal
duty).
Photo-1,
Comp-2,
Print-2,
Furniture10+
(Procurem
ent is
pending)
30
persons
study
tour is
remaini
ng.
b) During Census:
● Training of Master Trainers, Zonal
Officers, Enumerator and Supervisors
● Holding Census Committee Meeting
at Different level
● Main Count
MarchMay 2013
• Done
PD and
Team,
SID and
BBS
officials,
Hiring
during
main
Census.
UISC.
c) Post Census:
● Storing and Inventory of
Questionnaire
● Data capturing, Editing, Analysis and
Report Writing
● PEC & Conducting Sample Census.
July
2013Febru
2014
Not yet
started.
.
Economic Census-2013 Project
Financial Progress up to July, 2013
ADP
Allocati
on
(P.A)
1976.00
(-)
Target
Lakh Taka
Achievement
Achievement %
(P.A)
Monthly
(P.A)
Yearly
(P.A)
110.50
(-)
(-)
-
-
-
(-)
(-)
(-)
Monthly
Yearly (July)
(P.A)
110.00
(-)
Monthly Yearly Allocation
(P.A)
(P.A)
(P.A)
(-)
% of Cumulative
Progress
Financial
(P.A)
Physical
52.48%
(-)
45.00%
Harmonization and Dissemination of Unified
Agricultural production Statistics Project
1. Project duration July 2012- Jun 2014
2. Project approval 18th July, 2012
date
3. Estimated cost Tk. 345 lakh
4. Development
Partner
5. Objectives
FAO
1. Harmonization in estimation of rice production statistics in
Bangladesh through developing a unified scientific methodology .
2. Human resource development.
Harmonization and Dissemination of Unified Agricultural
production Statistics Project (Cont..)
Activities
Timeline
Present Means of
Status Implement
ation (MoI)
Main
Actor/s
HR
Equipment
Comments
Workshop/train
ing on rice
statistics
17-18 Oct
2012
Comple
ted
February
2013
Comple
ted
13
persons
from
BBS
(AD.
Duty)
Recommendati
on for a unique
scientific
methodology
for rice yield
estimation and
June
2013
Accepted
by all.
Vehicle-1
(FAO),D.Com
p-3,Printer3,UPS3,Laptop-1,
Scanner1,Photo.c.1Cemara1,Beamer1,Bookshelf8,Table4,Comp table4,Side table-4.
One Study tour
has been
completed.
Assess existing
methodologies
use by BBS &
DAE for rice
yielding
estimation
Pd and
Team,
Officials of
BBS,DAE,
MoA and
SPARRSO.
Arrange Final
Workshop
March
2014
Not yet
started.
Experimental
Crop Cutting,
Meeting/Nego
tiation.
Harmonization and Dissemination of Unified Agricultural Production
Statistics Project (Cont..)
Lakh Taka
(Financial Progress up to July, 2013)
ADP
Allocation
(P.A)
Target
Monthly
119.00
(79.89)
2.50
(2.00)
(P.A)
Yearly (July)
(P.A)
2.50
(2.00)
Achievement
Monthly
(P.A)
(2.00)
Yearly
(P.A)
(2.00)
Achievement %
Monthly
(P.A)
(100%)
Yearly
(P.A)
(100%)
Allocation
(P.A)
(2.50%)
% of
Cumulative
Progress
Financial
(P.A)
Physical
60.08% 84%
(62.58%)
Remarks:
• Training on data entry will be held in Augusr, 2013.
•Dissemination workshop will be held in August, 2013.
7
Monitoring the Situation of Children and Women
(3rd Phase) Project (MSCW)
1. Project duration
Jan 2012- Dec 2013
2. Project approval date 3rd May 2012.
3. Estimated cost
Tk. 685 lakh
4. Development Partner UNICEF
5. Objectives
To monitor the situation of children and women
through conducting Multiple Indicator Cluster Survey
(MICS) and to institutionalize and update of BDInfo
in the statistical system as the national database for
monitoring progress of the indicators.
Monitoring the Situation of Children and Women (3rd Phase)
Project (MSCW) Cont…
Activities
Timeline
Present Status
Means of
Implementa
tion (MoI)
Main
Actor/s
HR
Equipment
Multiple
Indicator
Cluster
Survey
(MICS)
2012-2013.
09.12. 12
08.04.13.
Data collection
is done.
Data
processing is
going on.
Field
Survey,
Training,
Seminar,
Workshop
.
PD and
Team,
Trainers
and
Trainees
.
12
persons
from
BBS (On
Add.
Duty).
Institutional
ization of
BDInfo on
the NSS to
monitor
MDGs,
FYPs, PPs.
By
31.12.13
Going on.
Technical
Support to
SVRS.
31.12.12
31.12.13
Going on
Vehicle-1, Comp70, Printer-27,
UPS-70, Laptop6, Scanner-3,
Photo-4, Air
Con.-9,
Hemoglobin M.
M-83, Baby w.120, W.Scale-223,
H.M.board68,M.projector3,Sound1,Projector-1,Fax2,In.Modem30,Furnitures215+
Comments
Monitoring the Situation of Children & Women (3rd Phase)
Project (MSCWP) Cont…
(Financial Progress up to July’ 2013)
ADP
Allocation
(P.A)
Target
Monthly
(P.A)
173.00
(165.00)
1.45
(1.10)
Achievement
Yearly(July)
(P.A)
1.45
(1.10)
Remarks
1.
2.
Lakh Taka
Data Cleaning
Syntax customization
Monthly
(P.A)
(-)
Yearly
(P.A)
(-)
Achievement %
Monthly
(P.A)
(-)
Yearly
(P.A)
(-)
% of Cumulative
Progress
Allocation Financial
(P.A)
(P.A)
(-)
70.00%
(70.00%)
Physical
72.00%
Population and Housing Census-2011 Project
1. Project duration
July 2008- Dec 2013
2. Project approval date
22, December 2008
3.Estimated cost
Tk. 25259. 79 lakh
4. Development partner
UNFPA, EU ,USAID, USCB
5. Objectives
● To conduct the 5th national population and housing
census of Bangladesh through count of 100% households
and population on specific date of 2011
● To collect detailed socio-economic data on sample areas
to complement the main count.
● To develop benchmark database for all areas of the
country for preparation of development programmes
● To develop sampling frame for all socio-economic
surveys
● To use in area delimitation and updating of electoral rolls
of all national and local level elections
Population and Housing Census-2011 Project (Cont..)
Activities
Timeline
Present Means of Main
Status Impleme Actor/s
ntation
(MoI)
HR
Equipment
Preparing
documents
of 64 Zilas
Dec 2012
Going
on
46
persons
from
BBS
(Addl.
Duty)
Vehicle- 27, Motor
cycle-380, D.comp223,Printer-33,Photo2,Dehumitiffer-26,
B.reader-24,Air19,UPS-221,Backup
battery -260,Laptop10,Furniture300,Scanner8,Modem-20.,
Battary-306
Communit June
y Report
2013
for Printing
Going
on.
Preparing
February
Urban Area 2013
Report
Going
on
Preparing
Zila Report
Going
on
March
2013
Using
Census
Data
PD and
Census
Team
Comments
Population & Housing Census-2011 Project ( Cont..)
(Financial Progress up to July’ 2013)
ADP
Allocation
(P.A)
Target
3957.00
(3020.00)
Achievement
(P.A)
Yearly(July)
(P.A)
Monthly
(P.A)
100.00
(50.00)
100.00
(50.00)
(-)
Monthly
Lakh Taka
Achievement %
Yearly
(P.A)
Monthly
(P.A)
Yearly
(P.A)
(-)
(-)
(-)
% of
Cumulative
Progress
Allocation Financial Physical
(P.A)
(P.A)
(-)
72.40%
(53.24%)
86%
13
Strengthening of Industrial Statistics (Manufacturing
Sector) of Bangladesh Project (SISB)
1. Project duration Jan 2011- Jun 2013
2. Project approval 24 January 2011
date
3. Estimated cost Tk. 500 lakh
4. Development
Partner
5. Objectives
GOB: JDCF
To develop a reliable, efficient and demand-driven industrial
statistics through•Product classification (BCPC),
•Occupation classification (BSCO),
•Cottage Industry survey,
•Manufacturing industry survey,
•Business register
Strengthening of Industrial Statistics (Manufacturing Sector) of Bangladesh
Project (SISB) Cont….
Activities
Timelin
e
Present
Status
Means of
Implementa
tion (MoI)
Main
Actor/s
HR
Equipment
Review of International
Standard classifications
and develop Bangladesh
standard classifications
April
2012
Published
Nationwid
e
survey/lite
rature
review.
PD and
Team
Design, pre-testing of
forms & questionnaires
January
2013
Done
3
appointed
daily
basis and
7 from
BBS as
Addl.
Duty.
Survey fieldwork &
follow-up for nonresponse
February
2013
Done
Microbus-1,
Comp-10,
Laptop-1,
Fax-1,
Photocopy-3,
Printer-2,
Scanner-1,
Comp server1, Mobile-2,
L.phone-1,
Air cooler-2,
Projector-1
Furniture-17
WG, TC, and Steering
committee meeting;
Workshop &
Stakeholders’ opinion
February
2013
4 Training
Program
completed
Develop human resources
thru training on survey
methodology and data
analysis.
May
2013
Complete
d
Comments
Strengthening of Industrial Statistics (Manufacturing Sector) of
Bangladesh Project (SISB) Cont…
Financial Progress up to July, 2013
ADP
Allocation
(P.A)
20.00
(-)
Target
Achievement
(P.A)
(P.A)
Monthly
(P.A)
2.00
(-)
2.00
(-)
(-)
Monthly
Yearly(July)
Lakh Taka
Achievement %
% of Cumulative
Progress
Yearly
(P.A)
Monthly
(P.A)
Yearly
(P.A)
Allocation
(P.A)
Financial
(P.A)
Physical
(-)
(-)
(-)
(-)
95.15%
(-)
82%
Remarks:
•Draft report of Business register is going on.
•Coding, Editing and Entry of Survey of Manufacturing Industry is completed. Data processing is in
progress.
16
Nutritional Surveillance Component Project
1. Project duration July 2009- June 2014.
2. Project approval TPP approved on 26.5.2010 (after 10 months later).
date
3. Estimated cost Tk. 639.70 lakh
4. Development
Partner
5. Objectives
European Union
• To institutionalize the Nutritional Surveillance System in BBS
•. Nutrition related data collection and provide to the stakeholders
• To develop the capacity of BBS human resources regarding
Nutritional Surveillance
• To strengthen the organizational capacity .
Nutritional Surveillance Component Project
Activities
Timeline
Present
Status
Means of
Implement
ation (MoI)
Main
Actor/s
HR
Equipment
Comments
To conduct post
Enumeration check
(PEC) survey.
FebApril-13
11th round
1st phase
Data
Collection
has
been
completed.
PD and
Team,
BU &
HKI
11
persons
from
BBS
By June
2014
b) 11th round
PEC training
is completed.
Preparation
of cspro
training is
going on.
To support BRAC
University and HKI
on sample designing,
questionnaire
preparation etc. for
the
main
Surveillance.
By
June
2014
c) Going on.
Jeep-1,Comp12,Laptop4,UPS6,Printer5,Television1,Refrig-1,
Mul.media1,C.Fan5,S.Fan-3,Air
con.-2,Kettle2,Camera1,H.M19,W.M15,Photo1,Tele6,V.recorder1,Scanner1,H.mich1,Router-1,
Furniture-113.
Study tour
for 14
persons is
remaining.
To arrange different
training programs for
the officials of
Bangladesh Bureau
of Statistics ( BBS )
on the relevant areas.
Data
collection,
analysis,
report
writing,
training
program
through
renowned
institutions.
Nutritional Surveillance Component Project
Lakh Taka
Financial Progress up to July, 2013
ADP
Alloca
tion
(P.A)
197.00
(197.00)
Target
Monthly
(P.A)
(1.00)
Yearly(July)
(P.A)
(1.00)
Achievement
Monthly
(P.A)
(0.65)
Yearly
(P.A)
(0.65)
Achievement %
Monthly Yearly Allocation
(P.A)
(P.A)
(P.A)
(65%)
(65%)
(0.51%)
% of Cumulative
Progress
Financial
(P.A)
65.45%
(65.45%)
Physical
82%
(82%)
Remarks:
•11th round (1st phase) main surveillance has been conducted by BBS & BRAC University jointly.
• TPP revision activities is going on.
19
Digital Information System Project (DIS)
1. Project duration July 2011- June 2013. (One Year No Cost Extended)
2. Project approval The project has been started after 5 months of the proposed date due
date
to approval and fund release.
3. Estimated cost
4. Fund
5. Objectives
Tk. 1267.00 lakh (Original)
Tk. 929.00 Lakh (Revised)
GOB
To Develop web based GIS application software and systematic
storing the data of censuses and surveys
To develop dataset of spatial and attribute to meet the global
requirement and 2021 vision of the government
Digital Information System Project (DIS)
cont….
Activities
Timeline
Present
Status
Means of
Implement
ation (MoI)
Main
Actor/s
HR
Equipment
Comments
Establishment of a
Digital Data Lab
Nov,12
Done
Procurement and
installation of
Machinery equipment's
(Servers, Storage and
Network)
Jan,13.
Done
Workshops
and
meetings,
Tender.
PDs
and
team,
Tender
commit
tees.
6 persons
from BBS
as Add.
Duty and
5 persons
hiring.
Got
approval of
no cost
extension
for one year
up to June
2014.
Acquisition of attribute
data from Population
Census-2011 and GIS
Section of Computer
Wing
June,13
Done
Micro-1,
Furniture-49,
Laptop-4,
Cemara-1,
Printer-3,
Co.printer-1,
Scanner-2,
Software-5,
Photo-1
Development of Web
enabled Digital
Information System
linkage with Spatial and
Attribute database, and
June,13
Going
on
Local Training on
Digital Information
System.
June,13
Done
3 persons
study tour is
remaining.
Need to
revise DPP.
Digital Information System Project
Financial Progress up to July, 2013
ADP
Allocation
(P.A)
700.00
(-)
Target
Monthly
Yearly(July)
(P.A)
(P.A)
5.00
(-)
5.00
(-)
Lakh Taka
Achievement
Monthly
(P.A)
(-)
Yearly
(P.A)
(-)
Achievement %
Monthly
(P.A)
(-)
Yearly
(P.A)
(-)
Allocation
(P.A)
(-)
% of Cumulative
Progress
Financial
(P.A)
Physical
36.63%
(-)
62.00%
(-)
Remarks:
• Software are being developed with CEGIS for web based GIS application software and Linkage
with BBS website (www.bbs.gov.bd).
Strengthening Capacity of BBS in Population and
Demographic Data Collection Using GIS Project
1. Project duration
2. Project approval
date
3. Estimated cost
July 2012- June -2017.
20 Nov 2012
4. Development
Partner
UNFPA
5. Objectives
Tk. 1598.25 Lakh (GOB: 540.25 Lakh, PA: 1058.00 Lakh)
•
•
•
•
•
•
To Improve capacity of BBS in data collection, analysis, dissemination and
report writing.
To prepare time series data on VAW /Gender based survey in Bangladesh.
Creation of Geo database along with Small Area Atlas using population census2011 data.
To improve SVRS and GIS data quality.
To Update GIS EA Mauza/Mahallah maps with health and education facility
pointed.
To develop online data entry system for SVRS.
Strengthening Capacity of BBS in Population and
Demographic Data Collection Using GIS Project
Activities
Timeline
Present
Status
MoI
Main
Actor/s
HR
Equipment
Comments
Field verification, editing,
conversion for Digital
Mauza/Mahallah map.
a) June
2017
Going
on
Data collection on Health
and Education facility using
GPS and pointed in the
maps.
b) Dec
2016
Going
on
Field visit/
survey/
training/
Orientatio
n
/workshop
/meeting.
Total
77
(66
perso
ns
from
BBS).
c) July
2015
Will be
started
soon
VAW/Gender based survey,
data entry, processing and
report writing
d) Dec
2015
Will be
started
in due
time
Training/Orientation for GIS
and SVRS enumerator
/supervisors
e)June
2014
Going
on.
Preparation of Thematic
Maps.
g) Dec
2016
Going
on
Vehicle-2,
Map
copier-1,
Photo co1, Fax-1,
Scanner-1,
GPS-20,
Air con-2,
Fire extin…,Laptop
-1,D.
com-15,C.
printer3,M
PrinterS2,Com
softLS,Furnit
ure-LS.
30 persons
study tour
is
remaining.
Preparation of Small Area
Atlas of 64 Districts using
Population and Housing
Census-2011 data.
PD and
Team,
DG,
BBS
and
UNFPA
represe
ntative.
Notificati
on of
award
already
sent for
procureme
nt of
equipment
.
Strengthening Capacity of BBS in Population and Demographic Data
Collection Using GIS Project
(Financial Progress up to July, 2013)
ADP
Allocation
(P.A)
566.00
(301.00)
Target
Monthly Yearly(July)
(P.A) (P.A)
27.00
(22.00)
27.00
(22.00)
Lakh Taka
Achievement
Monthly Yearly
(P.A)
(P.A)
(-)
(-)
Achievement %
% of Cumulative
Progress
Monthly
(P.A)
Yearly
(P.A)
Allocation
(P.A)
Financial
(P.A)
(-)
(-)
(-)
10.19%
(5.29%)
Physical
11%
25
Monitoring the Situation of Vital Statistics of Bangladesh Project
(MSVS)
1. Project duration
July 2012- June -2017.
2. Project approval
date
3. Estimated cost
13-11-2012
4. Fund
GOB
5. Objectives
•To make population projection in inter-census period
Tk. 2953.85 lakh
•To strengthen the existing database of vital statistics
•To compile Demographic & Health Statistics
•To monitor the progress of MDGs such as :
•
•
•
•
Under Five Mortality Rate (U5MR)
Infant Mortality Rate (IMR)
Maternal Mortality Ratio (MMR) and
Total Fertility Rate (TFR)
Monitoring the Situation of Vital Statistics of Bangladesh
Project (MSVS)
Activities
Timely
Present
Status
MoI
Main
Actor/s
HR
Equipment
Comments
a) Data collection
at field level
Monthly,
Quarterly,
Half yearly
and yearly
basis
Started
from
July
2013
b) Printing of
Survey Tafsil
yearly
Done
c) Data edit,
entry and process
Monthly
Going
on
Collecting
data from
1500
PSUs
using 10
kinds of
questionna
ires.
12 persons
will
be
newly
appointed
and
15
persons
will
be
deputed
from BBS.
d) Training
/Refresher
Training
H.Yearly
-
PD and
Team,
Local
female
registers
,
Supervis
ors,
RSO,
USO.
e) Selection of
Firm for Local
Consultant
Yearly
-
f) Publication of
report and
seminar.
Yearly
Reviewi
ng by
PDs
Forum
Comp-25,
No study
Laptop-2,
tour.
L.Printer-5,
M.printer-1,
UPS-30,
Sofware-5,
Micro-1,
Multimedia1,
Projector-1,
F.modem-1,
Projector
screen-1,
Fax-1,
Calculator50, Photo-2,
Aircooler-3,
Camera-1,
Furniture30+, Other.
g) Listing and
Sketch Mapping
Yearly
Going
on.
Monitoring the Situation of Vital Statistics of Bangladesh Project
(MSVS)
(Financial Progress up to July, 2013)
Lakh Taka
ADP
Allocat
ion
(P.A)
474.00
(-)
Target
Monthly Yearly(July)
(P.A)
(P.A)
Achievement
Monthly Yearly
(P.A)
(P.A)
Achievement %
Monthly
(P.A)
Yearly
(P.A)
% of Cumulative
Progress
Allocation Financial
(P.A)
(P.A)
1.00
1.00
-
-
-
-
-
(-)
(-)
(-)
(-)
(-)
(-)
(-)
Physical
9.91% 17.00%
28
Green Pages Project (Total-6)
Project Name
Poverty
Database
Sl.No.
Page-764
Sl. No.293
Baseline Survey of Page-767
IT
Statistics Sl. No.318
Project.
Optical
Archive
Networking
Project.
Data Page-738,
& Sl. No. 633
National
Data Page-767,
Resource Center
Sl. No. 319
Present Condition
A pilot study has been conducted in two
upazilas (Manikgonj Sadar & Nagorpur,
Tangail).
TPP has been prepared but waiting for the letter
from finance for the final TPP.
Comment
A meeting was
held on
15.07.2013 under
the Chairmanship
of Addl.
Secretary, SID.
The meeting
reviewed the
progress of green
pages projects
and took the
decisions to
accelerate those
projects .
Improving Labour Page No. 735
Statistics
Sl. No. 586
Agriculture
Census Project.
Page-709
Sl. No. 25
29
Download