Brown - Substation Business Application Using CIM PI AF

advertisement

December 12, 2007

Substation Business

Applications using

CIM / PI AF

by

Stephen Diebold

Manager – Real Time Systems

Kansas City Power & Light

Agenda

• Overview of KCP&L

• CIM / PI AF Project

 A Convergence of Opportunities

 Main Goal

 Situation Without Project

Closing the Loop

 Asset-Related Applications

 Applications

• Interoperability Test

• Project Status

• Questions

• Over 810,000 customers

• Peak in excess of 5,660 MW

• Service territory across 47 counties in MO and KS covering 17,934 sq. miles

• Over 3,170 employees

• 30 office/service center locations

• 9 generation plant sites and 10 peaking facilities

• 3,309 miles transmission lines

• 24,466 miles of overhead distribution lines

• 3,400 miles of underground distribution lines

• 322 substations

CIM/PI AF Project

A Convergence of Opportunities

• EMS comes with PI Historian

– Stores history of EMS real-time point data

– PI features for model-based access to tags

– Utilizes standards-based CIM model for

EMS database configuration

CIM/PI AF Project

Main Goal

Transmission Engineering Interest in moving from

Event-based maintenance to

Condition-Based Maintenance

AF

CIM DE

Environment

CIM/PI AF Project

Situation Without Project

EMS gathering 50,000+ points of real-time data

CIM database where equipment and associated real-time data points defined for EMS

PI Server

..

Point data history stored in PI tags, but accessible only by point name

PI product (AF) able to model equipment’s relationships to tags, but product not currently used field devices

EMS

AF

CIM DE

Environment

CIM/PI AF Project

PI Server

Closing the Loop

Export CIM model data to PI AF product

Create PI equipment / asset model for retrieving historic tag data

GDA

(Utility Integration Bus)

.

.

• Create infrastructure for generalized retrieval of historic real-time information

– on equipment basis (by reference to equipment location in system)

– on asset basis no matter where asset has been moved in system

• Generalized retrieval is essential to the creation of applications field devices

Network Manager

EMS

CIM/PI AF Project

Asset

Management

System

Asset-Related Applications

Condition-Based Maintenance

Applications for transformers and breakers

Condition-Based

Maintenance

Applications

AF

PI Server

GDA

(Utility Integration Bus)

PI Server

.

.

• Desktop access

• Paging/Email notification

• Web access

• First step toward

“dashboard” access to real-time Operations data field devices

CIM DE

Environment

Network Manager

EMS

Interoperability Test

• Demonstrate interoperability between ABB, SISCO and

OSISoft’s products based on the CIM and/or GDA.

• Verify compliance with the CIM for those CIM classes/attributes involved in the information exchanges.

• Demonstrate the exchange of power system models using the CIM and an RDF schema and XML representation of the model data.

• Demonstrate exchange between ABB and SISCO products using the services defined in the GDA Client and Server interface standard.

Interoperability Test

Vendor

ABB

OSISoft, LLC

SISCO, Inc .

Product Name

• Network Manager, CIM

DE Toolkit

• PI AF

• PI System Explorer

• Part number: UIB -

PIWRAP-412-

095 Version 2.0.0 Beta

• PI Adapter

Tests

• Full Import using CIM XML and

GDA services

• Incremental Import using CIM XML and GDA services

• Storage of the ABB model data

• Review and browsing of the ABB model data

• Full Import using CIM XML and

GDA services

• Incremental Import using CIM XML and GDA services

• Provide UIB message bus for transport and communication

Project Status

• FAT completed June 4, 2010

• Interoperability tests completed

June 9, 2010

• SAT is being scheduled

Questions

Condition-Based

Maintenance

Applications

Asset

Management

System

AF

PI Server

GDA

(Utility Integration Bus)

PI Server

.

.

CIM DE

Environment

Network Manager

EMS field devices

Contact information:

Stephen.Diebold@KCPL.com

December 15, 2007