5 - TRF Limited

advertisement
Balance of Plant
TRF Limited
1
Balance of
Plant
TRF offers design, engineering, manufacturing, erection and
commissioning solutions for Complete or Partial Balance of Plant in
thermal power projects.
TRF develops the most crucial packages of BoP viz. the CHP and AHP
itself while the other important packages are supported by reputed
vendors as mentioned below:
 DM Water – Ion Exchange, Triveni
 Intake & Supply Water – JUSCO
 Fire Protection System – Sterling & Wilson, Unitech Machines
 HVAC – Voltas, Carrier-Aircon
 Civil – Bridge & Roof, JMC Projects
TRF Limited
2
Balance of
Plant Plant
Ash Handling
To provide innovative AHP solutions, TRF has associated
itself with well known international organizations – United
Conveyor Corporation (India) Pvt Ltd and Sinofinn New
Energy Investment Co Ltd, Shanghai, China – which are
globally respected for their economical and reliable ash
handling solutions.
Sinofinn has completed more than 65 projects globally (4
in India) and has recently built the world’s largest ash
handling system with standalone capacity of 341 TPH at
Jharsuguda, India.
TRF Limited
3
Balance of
Plant Plant
Ash Handling
The Company can provide following AHP solutions with its associates :
Bottom
Ash Systems –
Water
Impounded bottom ash systems
Scrapper chain conveyor
Dry bottom ash systems
Fly Ash
Systems –
 Vaccum conveying systems
 Pressure conveying systems
High
Concentrated Ash Slurry Disposal Systems Lean Slurry Disposal Systems
Water & Other Systems
Silo Unloading Systems
TRF Limited
4
Balance of
Plant Plant
Ash Handling
•1
x 500 MW Complete AHS For Sanjay Gandhi TPS
•1 x 250 MW Complete AHS For Sanjay Gandhi TPS
•3 x 210 MW Bokaro TPS Dry Fly Ash Handling System
•1 x 75 MW Complete AHS For Jindal Steel & Power
•2 x 250 MW REL Dahanu TPS Dry Fly Ash Handling
System
•5 x 50 MW + 5 x 210 MW Obra TPS Complete Ash
Handling Renovation System
•2 x 125 MW Complete AHS for BHEL Surat Lignite TPS
TRF Limited
5
Balance of
Plant Plant – Sinofin Reference in India
Ash Handling
Sr.
No.
1
CLIENT
JHARSUGUDA
station,
SPECIFICATION
(Capacity,
Head,
Motor, KW Rating etc)
power 6x600MW Pneumatic conveying fly ash
Four pipes per unit, 341t/h per unit
Two stage, pressure + pressure
Commissioning Date
2010
2
WARDH power company,
6x600MW
conveying
ash
Four pipes per unit, 220t/h per unit
Two stage, vacuum + pressure
2012
3
ADANI power company,
5x660MW Ash Handling
Three pipes per unit, 50t/h per unit
2010
4
ADANI power company,
5x660MW
2010
5
MPPL power station,
6
KAMALANGA
station,
Pneumatic conveying mill
rejector
Six pipes per unit, 10t/h per unit
1x135MW Pneumatic conveying fly ash
Three pipes per unit, 72t/h per unit
power 4x350MW
Pneumatic
conveying
2009
ash
2012
3x660MW Pneumatic conveying fly ash
Three pipes per unit, 190t/h per unit
2012
Three pipes per unit, 190t/h per unit
7
TRF Limited
TALWANDI power station,
6
Balance of
Plant Plant – UCC Credentials in India
Ash Handling
•1
x 500 MW Complete AHS For Sanjay Gandhi TPS
•1 x 250 MW Complete AHS For Sanjay Gandhi TPS
•3 x 210 MW Bokaro TPS Dry Fly Ash Handling System
•1 x 75 MW Complete AHS For Jindal Steel & Power
•2 x 250 MW REL Dahanu TPS Dry Fly Ash Handling
System
•5 x 50 MW + 5 x 210 MW Obra TPS Complete Ash
Handling Renovation System
•2 x 125 MW Complete AHS for BHEL Surat Lignite TPS
TRF Limited
7
Balance of
Plant Plant
Ash Handling
TRF Limited
- Arrangement with other associates
8
Balance of
Plant
The TRF
Advantage
“Why should one prefer TRF to other BoP contractors?”
manufacture in-house the most crucial system of BoP – the CHP.
Our CHPs are appreciated by clients for their high reliability and robust
performance.
Our technological tie ups with the global leaders in AHPs ensure that
we deliver the most appropriate and highly reliable AHP solutions with
less life cycle cost.
Our rich domain expertise accumulated over five decades enables us
to deliver the highest quality of solutions to the client.
Our globally proven best practices in project management and site
work assures the project delivery within stipulated time and cost.
Our strong and stable balance sheet eliminates the project delivery
risk.
Being a part of the prestigious TATA group, we are committed to
serve our customers in the most responsible and transparent manner.
We
TRF Limited
9
Esteemed Customers
TRF Limited
10
Esteemed Customers
TRF Limited
11
Our Mission & Vision
Mission: To be an international leader in material handling equipment, processes
and systems
We will grow five times in five years and become a Rs.2500 Crore company by
2013, by enhancing focus on material handling business and entering new
businesses as necessary.
We will expand our business on sustainable basis by building a team that is
passionate about serving all its stakeholders and is committed to making Trust,
Respect and Fellowship, a way of life.
Rs.2500 Cr. by 2012-13
To Grow 5 times in 5 years
TRF Limited
12
TRF Limited
13
Download