Annual Project Implementation Plan for ICDS (APIP) Madhya Pradesh APIP 2012-13 Presentation by GoMP 3/10/12 1 MADHYA PRADESH - Demographic Profile Area (in sq.kms.) 308 thousand sq. K.M. Population Census 2011 72597565 Male 37612920 Female 34984645 Scheduled Tribes 20.27 (Census 2001) Scheduled Castes 15.17 (Cenus 2001) Population (0-6 Years) 1.05 Cr Development Blocks 313 Populated villages 54903 Gram Panchayats 23012 Literacy 70.6 Male 80.53 Female 60.02 Density of Population 236 Sex Ratio 930 Child Sex Ratio 912 2 Health Indicators Madhya Pradesh INDIA Current Status Current status MMR 310 (AHS 2010-11) 212 (AHS 2010-11) IMR 62 (SRS - 2011) 47 (SRS - 2011) U 5 MR 89 (AHS- 2011) 98 TFR 3.2 (SRS 2010) 2.5 (SRS 2010) 3 An Overview of ICDS Services Total no. of Districts 50 Total no. of Blocks Total Projects ( ICDS ) 313 453 Projects in Rural area Projects in Tribal area Projects in Urban slum Total no. of Anganwadi Centres 281 99 73 80160 (1231 newly sanctioned AWCs) Total no. of Mini AWCs 12070 Average no. of AWCs / project Additional no. of AWCs required for total 1.05 Cr children 174 20000 Facilities at AWCs (Infrastructure and Other facilities) Total number of AWCs 78929 AWCs having their own buildings 22590 (28.2%) AWCs functional in other Govt. buildings 16349(20.7%) AWCs functional in other rented buildings 40266 (51.0%) AWCs having toilet facilities 35457 (45.0%) AWCs having electricity facility 24631 (31.2%) AWCs having facility for drinking water 68617 (86.9%) Service Outreach Total Population of MP 7.25Cr.(2011) Population of 0-6 yrs, Children,@ 14.5% 1.05 Cr Eligible population 0-6 yrs to be enrolled 0.88 Cr (as per survey) 0.84 Cr (Actual enrolled) Gap- 4.5% Covered under ICDS (SNP) 0-6 yrs 0.72 Cr (86% of enrolled) Gap- 14.3% Population of P/L mothers @ 3 % of the total population 0.21Cr (Expected) 0.17 Cr (Enrolled) Gap- 19.04% Covered under ICDS(SNP) P/L 0.15Cr (Preg. and Lact.) Gap- 11.8% Total No. of Children Benefitted Under SNP 6 Months - 6 Years In lacs 120 105 100 87 84 80 72 60 40 20 0 Total Children Expected Children Actual enrolled SNP beneficiary 7 Total No. of Pregnant & Lactating Mother Benefitted under SNP In lacs 25 21 20 17 15 15 10 5 0 Expected beneficiary Actual Enrolled 8 SNP Beneficiary % SNP Coverage 2006-2012 120 100 95.6 87.4 79.4477.9 80 81.7 88.1 85.4 79.4 80.2 2011 2012 71.3 71.2 70.1 64.2 59.2 59.9 60 65.4 65.7 60.9 49.9 45.9 45.2 40 20 0 2006 2007 2008 6m-3y 2009 9 3-6y 2010 P&L Status of Malnutrition - MP 70 60 60 51 50 50 51.9 48.9 45 40 30 19.8 20 12.6 8.3 10 0 Stunted (H/A) NFHS-II (2003-04) Wasted (W/H) NFHSIII (2005-06) Underweight (W/A) NIN (2010) 10 Weight for Age – Underweight (0-5 years %) 60.7 51.9 27.3 TOTAL UNDERWEIGHT 32.7 32.1 19.8 SEVERE UNDERWEIGHT MODERATE UNDERWEIGHT NFHS III(2005-06) NIN Survey(2009-10) 11 SEVERE UNDERWEIGHT – STATE AVERAGE <19.8% ABOVE AVERAGE BELOW AVERAGE 12 Weight for Height – Wasting (0-5 years %) 35 25.8 22.4 17.5 12.6 8.3 TOTAL WASTING SEVERE WASTING NFHS III(2005-06) MODERATE WASTING NIN(2009-10) 13 SEVERE WASTING – STATE AVERAGE <8.3% ABOVE AVERAGE BELOW AVERAGE 14 Breastfeeding Indicator 71 80 61.5 70 60 50 36.8 26.4 40 30 21.6 13.3 20 10 0 Early Initiation Breast Feeding With in 1 hour NFHS-III (05-06) Execlusive Breast Feeding after 6 Months NIN (09-10) 15 AHS (10-11) ICDS- Challenges ICDS – Challenges 100% Coverage of Children and Mothers (Universalization) Opening of AWCs Ensuring the presence of children and retaining them at AWCs Growth Monitoring Ensuring proper distribution of breakfast , hot cooked meal & THR Strategy for Community Based Care of SAM children Capacity building Monitoring & Evaluation IEC& BCC Strategy 16 States Initiatives Mangal Diwas (community participation) New WHO growth standard rolled out across the State Mapping current nutritional status through NIN Developed about 7000 AWCs across the State on BalA pattern to attract community and Children in collaboration with RSK Reference manual for AWWs in collaboration with IGNOU and ECCE manual in collaboration with RSK Setting up of 273 NRCs and 55969 SAM children have been rehabilitated (April 2011- March 2012), all blocks will be covered with NRC facility Scaling up Sick New Born Care Units Atal Bal Mission 17 ABM Goals Reducing U5MR from 94.2 to 60 per thousand live births by 2015 Reducing the percentage of underweight children under five years from 60% to 40% by 2015 and further from 40% to 20% by 2020 Reducing prevalence of SAM in children under 5 years from 12.6% to 5% by 2015 and to negligible by 2020 ABM Strategy • To fill in the gaps primarily in the State Health and Nutrition programs, including ICDS. • To undertake evidence based pilots with a view to scale up on the basis of results. • To serve as a platform for Convergence of Various Schemes of Different Departments. • To promote decentralized planning through District Specific Action Plans. ABM - Key Components included in DAP Decentralized planning by districts including following key components • Provision of additional nutritious diet to SUW Children besides SNP. • Convergent Bottom-up Planning • Capacity building of frontline workers revamped • Community involvement through Atal Bal Mitra Yojana • Culture-specific BCC initiatives • Concurrent Monitoring and Evaluation 20 Convergent Efforts • Strengthening of MCTS • Linkage with Growth Monitoring and Health services through MCP cards • Skill Enhancement trainings • Joint supportive supervision • Developing linkages between MIS of Health and WCD for improved tracking of malnourished children • Village wise online data capture of SAM Children Major Activities Proposed in APIP 2012-13 • Human Resources i. Level Sanctioned Position Filled in position Vacant State level 98 98 0 District level 231 198 73 Block level Sector level (Supervisors) AWW 2673 1899 794 3157 2728 429 80160 77086 3074 AWH 80160 76188 3972 Mini AWW 1270 1270 0 ii. Proposing a technical team of consultants (Nutrition,MIS,M&E) for better implementation of the program both at State level as well as ICDS project level 22 Major Activities Proposed in APIP 2012-13 • Procurement: i. Medicine Kit & Pre School Education will be supplied to all the AWCs including Mini AWCs. ii. Equipments and supplies to strengthen field offices (From State to Project office) iii. Essential supplies to AWCs (Weighing machines, MUAC, growth monitoring charts, registers and storage boxes) • Nutrition and Health Education i. Strengthening Village Health and Nutrition Days. ii. Observance of Special Days and weeks (Women’s day, Nutrition week, Breastfeeding week etc). iii. Tracking of food commodity being distributed under SNP 23 Major Activities Proposed in APIP 2012-13 • IEC i. ii. iii. iv. Use of Audio-video channels for mass awareness Observance of important days and communication campaign Capacity Building of staff on IEC, IPC etc Special IEC strategy for high burdened districts • Monitoring and Evaluation:i. Assessment of nutritional status of under five children were done by NIN during 2012-13 ii. Strengthening of Web enabled MIS iii. Third party concurrent monitoring will be done iv. Strengthening of supportive supervision at all level v. Tracking of severely under weight children 24 Major Activities Proposed in APIP 2012-13 • Capacity Building i. Assessment and filling of position as per norms (all MLTCS and AWTCs). ii. Establishing State training cell dedicated exclusively for trainings. iii. Roll out of new MIS across the state after training of ICDS functionaries iv. Regular training of ICDS functionaries v. Renovations and establishing one new MLTC and 16 AWTCs with the support from Development Partners. • New Initiatives to strengthen ICDS i. Orientation for Community Participation in ICDS program ii. Appointment of additional AWWs in selected AWCs iii. Mobile tracking system for program activities iv. GIS mapping of AWCs are in the process Budgetary allocation and expenditure on SNP during 2008-2012 (in Rs. Lakhs) Financial Year Budget allocation Actual Expenditure % Utilization 2008 – 2009 27121.42 26388.69 97.29 2009 – 2010 56903.49 52215.22 91.76 2010 – 2011 92697.77 89736.40 96.81 2011-2012 90200.00 89365.76 99.07 26 Physical Targets and Financial Estimates S.N. Program Components Intervention/ Activities Unit Filling of vacancies Block level Sector level (Supervisors) 1 Human Resources AWC level Salary of ICDS staff State District Block/Sector AWC Physical Financial (Rs. Lakhs) Targets State level District level Norm 98 100% 231 (73 vacant) 100% 2673 (794 vacnt) 3157 (429 vacant) 80160 AWW (3074 vacant) 80160 AWH (3972 vacant) 12070 AWW (Mini AWC) 100% 100% 100% 100% 100% 98 231 5860 436.62 709.82 14905.80 172390 45003.6 SUB- TOTAL-1 61055.85 27 Physical Targets and Financial Estimates S.N. Program Components Intervention/ Activities Unit Norm Time Line Rent/ Vehicle/Contingency Rural/Tribal AWC 29517 Rs. 200/m Rent Urban AWC 750/m 7875 2. Administrative cost Total Physical Financial (Rs. Lakhs) 708.4 708.75 1416.8 Hiring of vehicles and POL 820.75 Contingency 714.1 SUB-TOTAL- 2 Supplementary 3. Nutrition Supply of SN to children, P & L women and AGs Children 6 months- 6 85,00,000 yrs P & L women 1410000 Severe malnourishe 1.87,599 d children SUB- TOTAL -3 2951.65 Rs. 4 x 300 102000 .00 Rs. 5x 300 21150.00 Rs. 6 x 300 3376.78 Note: 50% of cost of SNP to be borne by State 28 126526.78 Physical Targets and Financial Estimates S.N. Program Component s Intervention/ Activities Unit Norm Physical Financial (Rs. Lakhs) Supply of material & equipments (see table 4B.1 at page 37) 4. Procurement PSE kit 80160 0.01 lakh/ kit 801.60 Medicine kit 80160 0.006 lakh/ kit 480.96 PSE kit (Mini AWC) Medicine kit (Mini AWC) Weighing scales Salter scale Baby weighing scale 12070 0.005lakh/kit 60.35 12070 0.003lakh/kit 36.21 23537 0.0075 / scale 176.52 Adult weighing scale Computers/ Printers and UPS @ Rs. .50 lacs each Almirah/ Storage box/ Utensils, equipment, etc AWC level@ 0.05 lakhs for furniture 51787 0.01 lakh / scale 517.87 45485 0.01 lakh / scale State-10 District- 10 0.50 Block -200 454.85 State to Block 51231 AWC SUB TOTAL – 4 110.0 124.15 0.05 2561.55 5324.06 Physical Targets and Financial Estimates S.N. Program Components Training and 5. capacity building Intervention/ Activities Unit Norm Physical Financial (Rs. Lakhs) Regular training (induction/ job/ Refresher 1110.35 MPR /MIS training for ICDS staff 1753.95 Exposure Visit 10.0 SUB – TOTAL- 5 2874.3 Mangal Diwas 80160 AWCs 0.025 2004.0 IEC per AWCs /yr 80160 AWCs 0.01 801.60 6. IEC SUB - TOTAL- 6 Routine monitoring 80160 AWCs through MPR 7. Monitoring & Evaluation Register, records etc. (80160 +12070 mini AWC) SUB TOTAL-7 2805.6 0.005 400.8 .005 461.15 861.95 30 Physical Targets and Financial Estimates S.N. Program Components Intervention/ Activities Uniform to AWW/AWH Convergent workshops Flexi Fund for the AWCs Unit Norm Physica l Financial (Rs. Lakhs) 80160 AWCs +80160 Rs. 425 / AWHs+12070 Mini worker AWWs / =172390 1.0 lakh / 50 districts distric 92230 681.36 50.0 0.01 922.3 Travel 8 Others 2297.0 Office expense 620.0 Special initiatives : See details at item 4 K at page 60 of the report. 1.Orientation workshops for PRI Members 665.0 2.Appointment of additional AWWs at 11000 AWCs 643.50 4. Training of AWWs and Supervisors in Inter-personal communication 267.95 5. Tracking system for program activities 1202.4 SUB- TOTAL-8 7349.51 GRAND TOTAL 209749.70 31 Summary of Proposed Budget –APIP 2012-13 S.N. Intervention/ Activities Proposed Budget (Rs. Lakhs) 2 Human Resource (State to AWC) Administrative Cost ( Rent POL, Vehicle hiring, Computer, Furniture etc. 3 Supplementary Nutrition (Note: 50% of cost of SNP to be borne by State) 4 Procurement 5324.06 5 Training and Capacity Building 2874.3 6 Information ,Education and Communication 2805.6 7 Monitoring and Evaluation 861.95 1 8 Others (convergent workshops, Uniform for AWWs and AWHs, travel flexi fund for AWCs, office expenses and special initiatives like, workshops for PRI Members, Appointment of additional AWWs, IPC trainings and mobile tracking system) GRAND TOTAL 61055.85 2951.65 126526.78 7349.51 209749.70 32 Time line for Activities Proposed under APIP 2012-13 Time line (Quarterly) Activity Sub Activity Output Indicator I Human Resources Assessment of Vacant positions at state, district, block, sector & AWC level List of vacant positions ready Issuing directives to CDPOs for filling up the vacant positions of AWW/AWH with recommendations of Gram Sabha. Directives issued Advertise vacancies for supervisors, conduct test & hold selection (50% reservation for AWWs & 50% open) Selection held Advertise vacancies for CDPOs conduct test & Interview Interview Conducted Hold DPC for promotion of CDPOs to DPOs/DWCDO DPC Held Advertise vacancies for ASO/SA, conduct test & Interview Interview Conducted Appointment of additional AWWs in selected AWCs Appointment made Training & Honorarium to additional AWWs - II III IV All Vacancies filled Trainings completed 33 Time line for Activities Proposed under APIP 2012-13 Activity Sub Activity Conduct Induction training for newly recruited AWWs & Helpers Training needs assessment for Job & Refresher training of AWW/Helper Conduct Job & Refresher training of AWW/Helper as per STRAP Preparation of training module & material on IPC Training & Capacity Building Output Trainings Completed Need assessment completed Trainings completed as per STRAP Module & Material prepared Indicator I III IV No. of AWWs/AWHs trained All districts received the material Flip book printed All districts received the material Training of Master trainers on IPC Master Trainers trained No. of Master trained Training of trainers (supervisors) on IPC Supervisors trained No. of traines trained Training of AWW on IPC AWWs trained No. of AWWs trained on IPC Training of ICDS functionaries on MPR/MIS Training conducted No.of functionar Exposure visit conducted Trainings of community opinion leaders organized Best practices being rolled out Organize orientation trainings for community opinion leaders(PRI, CBO, SMS, Mahila Mandal, SHG etc.) II No. of AWWs & AWH trained Development & printing of Flip books on IPC for AWWs Exposure visit Time line (Quarterly) No. of functionaries trained 34 Time line for Activities Proposed under APIP 2012-13 Activity 3) SNP Sub Activity Processing procurement of SNP for AWCs (THR) Monitoring of SNP quality, quantity, frequency & beneficiaries covered ( at different levels) Monitoring of third meal programme for Severely Underweight Children through tracking & routine monitoring system Ensuring 100% children of 3-6yrs are enrolled & attend PSE 4) PreSchool Education Community Monitoring of PSE Programme for quality & regularity Organization of Parent-AWW meet every month for creating awareness about PSE Output Indicator SNP Procured No. of districts received SNP Improvement in coverage Coverage increased by 10% of current status Improvement in coverage 100% SAM children receive third meal Improvement in enrollment & attendance 100% children are enrolled & 10% increase in attendance from the current level Community monitoring system established System of Parent AWWs meet established Time line (Quarterly) I II III IV No. of villages with community monitoring system established No. of AWCs which started organizing regular meeting with parents 35 Time line for Activities Proposed under APIP 2012-13 Activity Sub Activity Output Time line (Quarterly) Indicator I Procurement of PSE kit by DPOs as per purchase rules Procurement of Medicine kit by DPOs as per purchase rules Procurement Kits procured Kits procured III IV No. of AWCs received PSE kit No. of AWCs received Medicine kit Place orders for procurement of Computers & Printers through LUN after finalizing the specifications at DWCD Orders placed No. of districts /blocks received supplies 5.4) Procurement of furniture & office equipments as per purchase rules Procurement done No. of districts /blocks received supplies 5.5) Assessment of requirement of serving utensils, boxes, dari, furniture etc for AWCs Assessment of requirement made No. of districts from where assessment received 5.6) Procurement of serving utensils, boxes, dari, furniture etc for AWCs as per purchase rules Procurement done No. of AWCs received supplies Strengthen Mangal Diwas Programme Mandal Diwas strengthened No. of AWCs where all four Mangal Diwas are held regularly Assess IEC needs & develop strategies & material IEC strategy document developed - IEC II 36 Time line for Activities Proposed under APIP 2012-13 Time line (Quarterly) Activity Sub Activity Output Indicator I Monitoring & Evaluation Others II III IV Linking of Mobile tracking monitoring system & referral of SAM children Development & Printing of New MPR formats, Checklist, Registers Material developed No. of districts started using new MPR & formats Procurement of Sarees & badges to AWW & AWH Procurement made No. of AWWs & Helpers received Sarees & badges Organizing Convergence workshops for improved interdepartmental coordination with health, RD, Education, Tribal departments Convergence workshops for interdepartmental coordination initiated No. of districts started organizing convergence workshops Strengthen NHED sessions in convergence with health department NHED sessions strengthened No. of NHED sessions organized as per the protocols 37 An update . . . I. Promotion of 14 ASOs to CDPOs, 7 APOs to CDPOs and 18 CDPOs to DWCDOs done, all the vacant post will be filled by March 2013 II. Procurement process of Pre-School Education Kit, Medicine Kit and uniform for AWWs and AWHs shall be completed by Jan.2013 III. Pilot for Community based management of SAM children is under consideration IV. Pilot for providing one full meal to Pregnant and Lactating Women proposed V. Training plan for induction of ICDS functionaries on revised MIS approved by GoI, and first SLMF training for three States being organized by MP VI. Printing of reporting registers and formats are in the process and will be delivered to all projects by November 2012 VII. Project “SANJHA PRAYAS” in collaboration with Rural Development department in 20 -20 villages , of two blocks in two districts will be implemented soon on pilot basis. THANKS 39