ELECTRICAL UNIT JAIPUR JURISDICTION Electrical Works of Following Civil Units are Executed Bikaner Unit – I Bikaner Unit – II Kota Unit Alwar Unit Udaipur Unit Bharatpur Unit Jaipur Unit – III Jaipur Unit - IV ORGANIZATIONAL STRUCTURE Resident Engineer ( Elect.) (Santosh .Sharma) H.Q.,Jaipur Asstt. Resident Engineer (B.M. Gupta) H.Q.,Jaipur Asstt. Resident Engineer (K.S.Meena) H.Q.,Jaipur Asstt. Resident Engineer ( Manoj Goyal) H.Q.,Jhalawar Accountant and Their Staff (Vinod Jain) Major Activities • • • • • • • • • • • HT / LT Lines Shifting Street Light Works Internal Electrical Installations Air Conditioning Evaporative Air Cooling Fire Fighting and Fire Alarm System Electrical Sub-Station Computer Networking Passengers Elevators Power Fencing Medical Gas Supply System ( Oxygen, Vacuum, Nitrus Oxide) • E.P.B.X. System ENERGY SAVINGS MEASURES • CFL fixtures were used in all Buildings. • Air Cooling machine with cellulose pads and centrifugal blowers with high energy efficiency. • High efficiency screw chillers are used for Air Conditioners which saves nearly 25% electricity. • Solar Water Heating System Solar Street Lights • Traffic Lights Blinkers with Solar Panels • Stickers are pasted in buildings keep aware about energy savings. Major Electrical Projects • • • • • • • • • Satelite Hospital Gangauri Bazar Jaipur Charak Bhawan Jaipur Research Hospital Pratap Nagar Jaipur Police Housing Rajasthan Technical University Kota Electrification Work on ROB’s Maharaja Gangasingh University Bikaner Engineering College Banswara ( Proposed ) Power Fencing at Sajjangarh Biological Park Udaipur Satelite Hospital Gangauri Bazar Jaipur • • • • • • • • Medical Gas Supply System: 40 Lacs Operation Theatre Lights : 25 Lacs Fire Fighting and Fire Alarm system : 18 Lacs Campus Lighting Work : 5 Lacs Passenger Bed Elevators : 44 lacs Internal Electrification : 60 Lacs Electrical Sub-Station : 10 Lacs D G Set : 22 Lacs Bed Elevator at Satelite Hospital Satelite Hospital Jaipur Charak Bhawan, Jaipur • • • • • • • Internal Electrification Work. : 60 lacs Passenger Bed Elevators : 35 Lacs Electrical Sub station : 21 Lacs Air Conditioning Work : 5 Lacs Air Cooling Work : 40 Lacs DG Set : 8 Lacs EPBX System : 5 Lacs Research Hospital Pratap Nagar Jaipur • • • • • • Substation, LT Panel & Cabling work Fire Fighting and Fire Detection system D G Set Passenger Elevator Air Conditioning Work Internal Electrification Work Police Housing • • • • Electrification in Police Housing Jaipur : 105 Lacs Electrification in Police Housing at Udaipur : 95 Lacs Electrification in Police Housing at Bikaner : 280 Lacs Electrification in Police Housing at Kota : 40 Lacs Rajasthan Technical University at Kota • • • • Internal Electrification work in Examination Block : 16 Lacs Electrical Substation Work : 37 Lacs Air conditioning Work : 18 Lacs Internal Electrification work in Vice Chancellor’s Secteriate : 33 Lacs • External Electrification Work : 22 Lacs Substation at RTU kota Line Shifting Works • Shifting of LT / HT Line at Ramganj Mandi ROB : 30 Lacs • Shifting of LT / HT Line at Dholpur ROB : 25 Lacs Maharaja Ganga Singh University at Bikaner • Internal Electrification work : 30 Lacs • Electrical Substation Work : 10 Lacs • External Electrification Work : 20 Lacs Street Light at Maharaja Ganga Singh University at Bikaner Details of Police Housing Scheme S.No. Name of Place Nos. of Quarters LSQ USQ 1. Jaipur 236 44 2. Udaipur 344 40 3. Bikaner 374 60 4. Kota 60 16 WORK LOAD IN UNIT S. No Name of work Client Deptt. (A) SHRI K.S. MEENA, ARE 1 SATELLITE HOSPITAL, BAZAR, JAIPUR. 2 SHRIRADHAGOVIND JAIPUR. 3 GANGAURI TS for Elect. Work Exp. Till date Bal. Work DEEN DAYAL TRUST, JAIPUR. 350.00 338.12 11.88 GOVIND DEO MANDIR SAMITTI JI 14.22 1.63 12.59 MENTAL HOSPITAL, JAIPUR MEDICAL & HEALTH DEPTT. 15.58 8.11 7.47 4 POLICE QUARTERS, CHAINPURA POLICE DEPARTMENT 76.15 47.24 28.91 5 ROB , DHOLPUR PWD 25.00 9.72 15.28 6 POLICE QUARTERS, UDAIPUR POLICE DEPARTMENT 168.25 36.11 132.14 7 RESEARCH HOSPITAL, NAGAR, JAIPUR. MEDICAL & HEALTH DEPTT. 122.83 19.43 103.40 DEOJI TEMPLE, 358 NOS. PRATAP Work Load in Unit (B) SHRI D.K. GUPTA, ARE 1 ELECTRICAL WORK IN RAJASTHAN TECHNICAL UNIVERSITY, KOTA. 2 140.54 96.51 44.03 INTERNAL ELECTRIFICATION IN JAIL POLICE BUILDING, KOTA. DEPARTMENT 7.24 6.39 0.85 3 ELECTRIFICATION WORK IN RTO, KOTA RTO, KOTA 10.00 2.11 7.89 4 I/E WORK IN TRANSIT HOSTEL KOTA POLICE DEPARTMENT 4.80 0.00 4.80 5 I/E WORK IN KISHANGANJ. TAD 7.00 4.74 2.26 6 I/E WORK IN SAHKAR BANK, BARAN. CO-OPERATIVE DEPTT. 9.17 1.70 7.47 7 E/W IN POLICE HOUSING QTRS., KOTA POLICE DEPARTMENT 61.00 13.02 47.98 8 SHIFTING OF HT/LT WORK AT RAMGANJ MANDI, BHAWAN MANDI, KOTA. PWD 30.00 18.00 12.00 9 I/E WORK IN HOSTEL BUILDING TAD SCHOOL, SHAHBAD. TAD 3.20 0.00 3.20 GIRLS HOSTEL, RTU, KOTA Work Load in Unit (.C) SHRI B.M. GUPTA, ARE 1 POLICE HOUSING, BIKANER. POLICE DEPARTMENT 310.00 192.59 117.41 2 RSMM, BIKANER RSMM 40.00 1.50 38.50 3 ELECTRIFICATION WORK AT UNIVERSITY BIKANER UNIVERSITY, BIKANER 67.00 66.12 0.88 4 TAL CHAPAR, CHURU FOREST DEPTT. 8.80 6.60 2.20 5 POLYTECHNIC COLLEGE, CHURU TECH. COLLGE 7.80 6.12 1.68 6 RICCO GODOWN NAPASAR RICCO 3.00 1.32 1.68 877.08 604.50 Total : 1481.58