John Boisvert, P.E. Chief Engineer July 27, 2012 7/27/12 Engineering Division 1 Engineering Who we are What we do Budget & Revenues Efficiency and Effectiveness Engineering and the Strategic Plan Initiatives Strengths, Weaknesses, Opportunities and Threats (SWOT) Questions 7/27/12 Engineering Division 2 John Boisvert, P.E. Chief Engineer Experience Pennichuck Water Works 2006 – Present: Chief Engineer Weston & Sampson Engineers 2000 – 2006: Team Leader – Water Resources Layne Christensen Co. 1998 – 2000: N.E. Manager - Geosciences Division Hydro Group, Inc. 1994 – 1998: Project Manager Hoyle, Tanner, & Associates 1992 – 1994: Project Manager Civil Consultants, Inc. 1986 – 1989: Project Engineer Underwood Engineers, Inc. 1985 – 1986: Project Engineer Education BS Civil Engineering - University of NH 1985 Masters of Studies in Environmental Law – Vermont Law School 1990 MS Civil Engineering – University of NH 1992 7/27/12 Engineering Division Education non-Degree Leadership New Hampshire Class of 2010 Memberships AWWA/NEWWA Member: NEWWA Sustainability Committee NHWWA Member: NHWWA Legislative Committee NHBIA Member: NHBIA Environmental Committee Government Member - NH Legislature Water Infrastructure Sustainable Funding Commission Member - Governor Lynch’s NH Water Sustainability Commission Chairman, Stratham Public Works Commission Licenses Professional Engineer – New Hampshire and Maine Civic/Volunteer Board Member & Coach: Exeter Youth Soccer Association Coach: Stratham Youth Soccer Association 3 Engineering: Who We Are Staff Member Title Years with Pennichuck Rich Philbrook Mgr. Engineering Services 43 Paul Dubowik Inspector 20 John Gureckis Inspector 30 David Levasseur CAD Technician/Inspector 11 Eric Levesque CAD Technician 8 Maurene Pepin CAD Technician 2 Kelley Murphy Administrative Assistant 11 Pete Tedder Distribution Engineer 26 Total Years: 7/27/12 Engineering Division 151 4 Engineering: What We Do Capital Projects Plan, design, permit, and oversee construction of capital projects Technical and Administrative support to: Internal Clients Distribution & Operations Water Supply & Treatment Customer Service Finance Administration External Clients Developers Government Customers Engineers Contractors Consultant Management 7/27/12 Engineering Division 5 Use of Consultants Where we lack expertise and experience Technical • Hydrogeology, Land Surveying, Structural Engineering, Electrical Engineering Special Projects • • • Treatment Asset Management Pipeline condition assessment Where we lack time and staff Environmental Permits & Reporting Cross connection surveys Where the activity is limited and infrequent 7/27/12 Wetlands & Shoreland Permitting Engineering Division 6 Future Staffing Considerations GIS Specialist “Re-tooling” of existing CAD Technicians GIS, GPS, and other evolving technologies Special Projects Engineer (previously funded position) Water Supply, Treatment, and Environmental Field Inspector 7/27/12 Engineering Division 7 Engineering: Budget and Revenues 2011 Direct Expenses and Revenues 2011 Direct Expenses and Revenues 2012 (Budget)* Labor & Benefits $877,461 $860,000 Expenses (Equipment & Supplies) $29,330 $34,100 $906,791 $894,100 Category Total Budget Less Inspection Fees Collected $27,089 Less Other Fees (Main Extensions, Flow Tests…) Collected $143,463 Total (Rate Supported) Less Capitalized Labor (Design & Inspection) Remaining Non-Capitalized/Non-Fee supported Labor and Expenses (Net engineering Expense) 7/27/12 Engineering Division $736,239 $282,928 $453,331 $30,000 $40,000 $824,100 $300,000 $524,100 8 Engineering: Efficiency and Effectiveness Category Value (2011) Capital Projects Construction/Contractor Costs Capitalized Labor (Design & Inspection) Engineering and Inspection as a Percent of Construction Number of Capital Project Work Orders Average Project Cost 7/27/12 Engineering Division $3,720,924 $282,928 7.60% 58 $64,144 9 Engineering: Non-Capitalized and Non-Fee Supported Expenses Net Engineering Expense (2011): $453,331 What does it support? Water Supply Distribution Customer Service Finance How? 7/27/12 Engineering Division 10 How: Water Supply Source assessment (wells) Pump design Treatment: design & technical support Permitting Watershed Management 7/27/12 Engineering Division 11 How: Distribution Mapping Customer response Technical support Cross connection surveys (in house and consultants) Meter sizing Fire Flows for Hydrant Coding GIS Support 7/27/12 Engineering Division 12 How: Customer Service New customer initiation Application, sizing, inspection, fee collection & processing Cross connection review Pressure complaints Project information 7/27/12 Engineering Division 13 How: Finance Fixed assets – Main Pipe Inventory Asset additions and retirements Fee processing Capital planning Rate Case testimony and support Invoice approval and coding 7/27/12 Engineering Division 14 Engineering and the Strategic Plan 7/27/12 Engineering Division 15 Strategy #1 Protect and Sustain our Water Resources Strategic Plan Maintain ownership of watershed land and well head properties Continue investment in the Company’s watershed plan Promote water conservation Educate communities regarding Engineering’s Role Mapping Monitoring (quantity/level) Stormwater improvement and enhancement Public Education the location and value of watersheds. Work with communities to develop local zoning that protects our water sources 7/27/12 Engineering Division 16 Strategy #3 Maintain Fiscally Sound Operating Practices that Enhance Access to Long-Term Capital Markets Strategic Plan Work with Public Utilities Commission to establish a rate making structure that allows fiscal stability through periods of regulatory lag, inclement weather and increased operating costs Engineering’s Role Provide technical support Ensure that the risk of aging infrastructure assessed and minimized Continued evaluation and Ensure that the long term capital Identify lowest possible cost Follow least cost planning enhancement of fiscal operations to maximize bond ratings source of long-term bonding necessary to fund capital expenditures 7/27/12 Engineering Division plan is technically and financially feasible and documented principles 17 Strategy #4 Maintain Customer Confidence and Support Strategic Plan Engineering’s Role Maintain 100% compliance with all New Hampshire Public Utilities Commission rules and regulations Competitive bidding and procurement Seek efficient project delivery Maintain service level of less than 1% of customer complaints resolved without intervention from the New Hampshire Public Utilities Commission Communicate capital initiatives to our customers Apply company policies and technical standards fairly and consistently Communicate customer service initiatives and promote customer education through our website, customer mailings and community meetings Maintain skilled analysis of customer meter reading and fees to ensure timely and accurate billings 7/27/12 Engineering Division 18 Strategy #6 Meet Customer Expectations for Quantity and Quality of Water Strategic Plan Invest in and maintain water treatment equipment that insures 100% compliance with the Safe Drinking Water Act’s primary water quality standards Invest in and maintain water treatment equipment that addresses secondary or aesthetic water quality standards Invest in and maintain water supply facilities that ensure delivery of water pressure within established State and Local guidelines 7/27/12 Engineering Division Engineering’s Role Maintain in-house technical expertise Manage outside consultants Source evaluation and monitoring Design services Planning for: Efficient use of assets and resources Source redundancy and security 19 Strategy #7 Manage the Company’s Assets to Provide Cost Effective, Uninterrupted Provision of Water Service Strategic Plan Engineering’s Role Implement an Asset Management plan Lead Asset Management and Capital to optimize the maintenance and replacement of the Company’s assets to minimize their life cycle costs Invest in information technology to efficiently allow employees to interface with operating systems in order to enhance the operation of the distribution, customer service and financial organizations Planning Initiative Implement GIS Evaluate alternative energy opportunities to power our facilities Make efficiency a design priority Invest in sustainable (green) technologies that lower life cycle expenses Maintain unaccounted for water at less than 15% 7/27/12 Engineering Division 20 Moving Forward: Initiatives Asset Management GIS Planning for: 7/27/12 Increased asset utilization Redundancy and security Engineering Division 21 Engineering: Strengths, Weaknesses, Opportunities, and Threats STRENGTHS Staff: Experienced, knowledgeable, customer focused, cross trained and longevity Good buried asset inventory Engineering Manager that can focus on the day to day Chief Engineer that can devote time to long range planning Company/Engineering has a strong regulatory and legislative presence Well respected by our regulators, the NHDES, NHPUC and EPA Willingness to engage in public forums (Merrimack River Watershed, NH & NEWWA, Regional Planning Commissions, Local Economic Development Commissions, etc.) 7/27/12 Engineering Division 22 Engineering: Strengths, Weaknesses, Opportunities, and Threats WEAKNESSES Systems to project data and information to our customers are out step with current delivery applications Data retrieval systems are not user friendly Time reporting and timesheet structure does not allow for analysis and assessment Difficult to assess goal and objective attainment Engineering map & drawing files are not consistent with Distribution Long range planning was a low priority – need to catch up Staff shortage – GIS, Water Supply (Special Projects) Engineer, Inspector Lack condition assessment tools for buried infrastructure 7/27/12 Engineering Division 23 Engineering: Strengths, Weaknesses, Opportunities, and Threats OPPORTUNITIES Asset Management (to be presented at a future meeting) Initiate a transition to GIS based mapping, design and information delivery Allow for company wide access, use, and participation GPS City utility projects offer an opportunity to partner with the City on water main replacement projects Remain engaged in public activities (State and regional planning) 7/27/12 Engineering Division 24 Engineering: Strengths, Weaknesses, Opportunities and Threats THREATS Untimely staff departure would result in a loss of institutional knowledge Aging infrastructure Downward pressure on rates Lack of task/activity variation Capital water main replacement program may not align with City utility projects reducing partnering opportunities in the future 7/27/12 Engineering Division 25 Questions? 7/27/12 Engineering Division 26