PLM-TEAMCENTER GATLA SAI RAM 206731 1 INRODUCTION HISTORY COMPONENTS AND PRODUCTS DATA MANAGEMENT IN TEAMCENTER -EXPORTS AND IMPORTS -MIGRATION -FACTORS -DESIGN OF APPROACH -REPORT BILL OF MATERIAL CUSTOMIZATION ADVANTAGES CONCLUSION 2 INTRODUCTION 3 TEAMCENTER History • Siemens PLM system(UGS PLM System) • In mid 1980’s with technology and products from CDC, SDRC and UGS. • Teamcenter Enterprise & Teamcenter Engineering Its robust architecture is integrated with Microsoft windows 4 COMPONENTS AND ITS PRODUCTS Community Collaboration Teamcenter Community Compliance Management Teamcenter for Compliance Management Engineering Process Management Teamcenter Engineering Enterprise Knowledge Management Teamcenter Enterprise Maintenance, Repair and Overhaul Teamcenter for MRO Manufacturing Process Management Teamcenter Manufacturing Program and Project Management Teamcenter Project Systems Engineering Teamcenter for Systems Engineering & Requirements Sourcing Management Teamcenter Sourcing Lifecycle Visualization Teamcenter Visualization Reporting and Analytics Teamcenter for Reporting & Analytic Simulation Process Management Teamcenter for Simulation 5 Data Management in Teamcenter 6 Export & Import PLM XML • Powerful tool • Flexible in defining rules • Contains admin module Transfer Mode Closure rule Property rule Filter rule 7 TRANSFER MODE 8 MIGRATION Aspects of data migration • Meta data • Document file • CAD data System migration Single system Multiple system a)multiple to single system b)multiple system to multiple system Preprocess migration What data analysis mapping 9 Analysis • • • • New system Old system Business process Gap analysis –finds the functionality difference Mapping • • • • One to one mapping, ExOne to many mapping Many to one mapping Property mapping Old system New system [property] [business object] 10 FACTORS OF MIGRATION Migration Bulk Phase 11 Bulk Data migration at once All users switch over All the process move to new Source system remain unaltered Phase • Group wise, project wise, workflow based etc. • Set of users switch over the time. • Co-existence of old and new system for some duration (From months to a year or so) 12 DESIGN APPROACH 13 CAD migration • Is done through third party migration tool (UG NX tool like ug_export/ug_import and ug_clone) 14 Report in Teamcenter Contain report builder module Reports are based on query and PLMXML frame work a)Get the object through query b)Convert to xml output c)Xsl style sheet is applied for layout Query Closure rule Property Report format Style sheet 15 BILL OF MATERIAL 16 CUSTOMIZATION 17 CAD DATA CUSTOMIZING 18 ADVANTAGE Secure Fast Simple customizing Reliable Reduce translation cost 19 CONCLUSION Enables the team to actively participate Long term business result Smart decisions Better product Success Source Manoj Tiwari http://teamcenterplm.blogspot.de/ http://en.wikipedia.org/wiki/Teamcenter 20 THANK YOU 21