PLM Systems

advertisement
PLM-TEAMCENTER
GATLA SAI RAM
206731
1
INRODUCTION
HISTORY
COMPONENTS AND PRODUCTS
DATA MANAGEMENT IN TEAMCENTER
-EXPORTS AND IMPORTS
-MIGRATION
-FACTORS
-DESIGN OF APPROACH
-REPORT
BILL OF MATERIAL
CUSTOMIZATION
ADVANTAGES
CONCLUSION
2
INTRODUCTION
3
TEAMCENTER
History
• Siemens PLM system(UGS PLM System)
• In mid 1980’s with technology and products from
CDC, SDRC and UGS.
• Teamcenter Enterprise & Teamcenter Engineering
Its robust architecture is integrated with Microsoft
windows
4
COMPONENTS AND ITS PRODUCTS
Community Collaboration
Teamcenter Community
Compliance Management
Teamcenter for Compliance Management
Engineering Process Management
Teamcenter Engineering
Enterprise Knowledge Management
Teamcenter Enterprise
Maintenance, Repair and Overhaul
Teamcenter for MRO
Manufacturing Process Management
Teamcenter Manufacturing
Program and Project Management
Teamcenter Project
Systems Engineering
Teamcenter for Systems Engineering &
Requirements
Sourcing Management
Teamcenter Sourcing
Lifecycle Visualization
Teamcenter Visualization
Reporting and Analytics
Teamcenter for Reporting & Analytic
Simulation Process Management
Teamcenter for Simulation
5
Data Management
in Teamcenter
6
Export & Import
PLM XML
• Powerful tool
• Flexible in defining rules
• Contains admin module
Transfer Mode
 Closure rule
 Property rule
 Filter rule
7
TRANSFER MODE
8
MIGRATION
Aspects of data migration
• Meta data
• Document file
• CAD data
System migration
 Single system
 Multiple system
a)multiple to single system
b)multiple system to multiple system
Preprocess migration
What data
analysis
mapping
9
Analysis
•
•
•
•
New system
Old system
Business process
Gap analysis –finds the functionality difference
Mapping
•
•
•
•
One to one mapping, ExOne to many mapping
Many to one mapping
Property mapping
Old system
New system
[property]
[business object]
10
FACTORS OF MIGRATION
Migration
 Bulk
 Phase
11
Bulk




Data migration at once
All users switch over
All the process move to new
Source system remain unaltered
Phase
• Group wise, project wise, workflow based etc.
• Set of users switch over the time.
• Co-existence of old and new system for some duration (From months to a
year or so)
12
DESIGN APPROACH
13
CAD migration
• Is done through third party migration tool
(UG NX tool like ug_export/ug_import and ug_clone)
14
Report in Teamcenter
Contain report builder module
Reports are based on query and PLMXML frame work
a)Get the object through query
b)Convert to xml output
c)Xsl style sheet is applied for layout
Query
Closure
rule
Property
Report
format
Style
sheet
15
BILL OF MATERIAL
16
CUSTOMIZATION
17
CAD DATA CUSTOMIZING
18
ADVANTAGE
Secure
Fast
Simple customizing
Reliable
Reduce translation cost
19
CONCLUSION
Enables the team to actively participate
Long term business result
Smart decisions
Better product
Success
Source
Manoj Tiwari
http://teamcenterplm.blogspot.de/
http://en.wikipedia.org/wiki/Teamcenter
20
THANK YOU
21
Download