January 2015 SlimLine XR ITS 2 SlimLine XR ITS2 : Contents for this presentation © ABB | Slide 2 Introduction of the new SlimLine XR ITS2 Applications Which data to be monitored by the ITS2 What is new about the ITS2 How to set up the ITS2 to communicate into a controlling system : - Apparatus set up - Software set up ( Ekip connect ) A complete User Manual ( pdf ) Modbus set up / Protocol Introduction © ABB | Slide 3 SlimLine XR ITS2 : Applications Typical applications for the XR ITS2 will be : © ABB | Slide 4 In Energy Management systems for analyzing and optimizing the energy consumption in commercial and industrial buildings Datacenters Hospitals Solar SlimLine XR ITS2 : Intelligent monitoring in Solar © ABB | Slide 5 Delivery of 590 pcs SlimLine XR 250 A with ITS2 to the second biggest Solar Farm in England. Installed in 42 pcs 20 feet containers working as a complete feeding device with transformer 400V > 33 kV inside. Remote controlling and monitoring by MODBUS from London. To be set in operation 2015 SlimLine XR ITS2 : What is new from the first ITS ? © ABB | Slide 6 ABB Ekip connect is used for configuration, this is a well known software within ABB. Manual configuring of XR size is no longer needed since the ITS module detects the XR size when plugged in. Motor operated XR’s can be configured to automatically open at fuse blown condition. Simpler design of electronics The EFM works for both busbar- and terminal feed. In phase 2 of the project additional communication protocols will be awailable when intoducing the Ekip COM module used in ABB SACE Emax series of breakers SlimLine XR ITS2 : Which data can be monitored Features Voltage Current kW kVA Cos fi Power factor kWh V : Voltage L1, L2, L3 A : Current L1, L2, L3 kW : L1, L2, L3 kVA : L1, L2, L3 Cos fi : L1, L2, L3 Sum kWh Fuse Status Fuse Status ( EFM ) Temperature Temperature at Terminal L2 Switch position On / Off Motor Control Motor control by bus Power / Energy /CosFI / Power Factor/ Max-Min measures © ABB | Slide 7 Communication Modbus RS485 Protocol Modbus RTU SlimLine XR ITS2 : Which data can be monitored © ABB | Slide 8 1. USB plug for connection via the T&P unit to the PC for configuration 2. Power incicator ( alt. WINK led during configuration ) 3. Communication indicator : Lit > OK 4. Fuse Blown indicator 5. Selection : Remote / Lit > Commands or settings of parameters are accepted Local / Dark > Commands or settings of parameters are refused How to set up the XR ITS2 © ABB | Slide 9 SlimLine XR ITS2 : Setting the feeding direction © ABB | Slide 10 XR1, 2 and 3 can be fed from the busbar side ( busbar feed ) or from the cable terminal side SlimLine XR ITS2 : Setting the feeding direction © ABB | Slide 11 XR1, 2 and 3 can be fed from the busbar side ( busbar feed ) or from the cable terminal side By default the link is set in the position marked “Busbar Feed”. SlimLine XR ITS2 : The EKIP T&P Unit Important : The ABB T&P unit is required for connection to a laptop Order code : 1SDA066989R0001 This is well known tool for ABB’s service personel working with the ABB SACE products. © ABB | Slide 12 SlimLine XR ITS2 : The EKIP T&P Unit Ekip T&P test and programming unit © ABB | Slide 13 SlimLine XR ITS2 : Download the EKIP Softwaretool Download and install the Ekip Connect software from the Web. 1) Go to http://www.abb.com/abblibrary/DownloadCenter 2) Search Ekip Connect 3) Download the software 4) Unzip 1SDC200011X0000.zip and run setup © ABB | Slide 14 SlimLine XR ITS2 : Log in as Advanced user Log in as Advanced user Password : 0001 © ABB | Slide 15 SlimLine XR ITS2 : 1 Setting the slave address Factory setting : 247 Options : 1-247 © ABB | Slide 16 SlimLine XR ITS2 : 2 Setting the Nominal voltage The Fuse blown indicator will turn off when the Nominel Voltage is set © ABB | Slide 17 SlimLine XR ITS2 : 3 Setting the Power Direction Busbar feeding © ABB | Slide 18 SlimLine XR ITS2 : Parameter settings Basically, there are 3 parameters that’s important to have the ITS up and running in a system 1. Set the «Nominal Line Voltage» according to the system voltage. If the line voltage in the system is 400 V, the Nominal Line Voltage should be set equal If not correctly set, the Fuse monitoring will not work. 2. Depending on the feeding side of the XR switch, Busbar- or terminal feed, Power direction must be set accordingly. Important for XR 1,2 and 3 :The jumpers on the fuse boards must be set accordingly to feeding direction. 3. Give the ITS unit a unique modbus slave address. If necessary the communication parameters must be changed to correspond with system builders settings. © ABB | Slide 19 SlimLine XR ITS2 : Multiplug layout Terminal 1 2 3 4 5 Signal 24 VDC 24 V GND (0V) RS-485 0V RS-485 + (A) RS-485 – (B) Conductor cross section stranded min. Conductor cross section stranded max. Conductor cross section stranded, with ferrule without plastic sleeve max. Conductor cross section stranded, with ferrule with plastic sleeve max. 0.25 mm2 1.5 mm2 1.5 mm2 0.75 mm2 The Multi plug connector has 2 connection points for each terminal, making it easier to loop the wiring between the XR switches. © ABB | Slide 21 XR ITS2 User tools © ABB | Slide 22 SlimLine XR ITS2 : User Manual 22 pages Contents : Installation of the XR switches, Ekip Connect software. Description of ITS units front panel. Menues in Ekip Connect showing measured values and status information Configuration of the ITS. Multiplug terminal Modbus interface Strapping for correct EFM operation Technical data. © ABB | Slide 23 SlimLine XR ITS2 : Modbus Protocol ( excel file ) © ABB | Slide 24 SlimLine XR ITS2 : Ekip view ( to come ) © ABB | Slide 25 SlimLine XR ITS2 : Ekip view ( to come ) © ABB | Slide 26 SlimLine XR ITS2 : Properties © ABB | Slide 27 A complete new range of ITS 2 Modules. ITS : Intelligent Tier Switch Network communication via Modbus RTU / RS485. To be configured via the software tool Ekip Connect ( common for Breakers and XR ). The optimal concept for Energy Management systems for analyzing and optimizing the energy consumption in commercial and industrial buildings © ABB | Slide 28