MÁLMEY Stockfish Processing The stockfish processing system comes in several versions. Malmey’s total solution for stockfish processing consists of wet and dry lines. Wet line includes cuttingmachine, tub-tipper, tub-washingmachine, washing-silos, weighing-silos, processing line, conveyors and stacker or a robot. Dry line includes drying-chamber, band-dryer, after-drying, feeding-container, weighing-silos, stockfishpress, conveyors and compress. All activities and procedures are set in a simple manner with timing by user-friendly computer system. The stockfish processing system was first produced in 2002 and has been under constant development since. The Stockfishpress packs from 50 to 100 bags per hour depending on products. The Headbreaker saves time and energy 15-20%. The Cuttingmachine sepperates the head from the fish and cutts the fish in to cutlets. The Stockfish Processing line is fully automatic. Tørrfisk Prosessing Tørrfiskanlegget finnest i flere versjoner. Vores total løsning for tørrfisk produksjon består av våt- og tørr linje. Våt linje omfatter skjeremaskin, kar-tipper, kar-vaskemaskin, hodeknekker, vekttrakter, produksjonslinje, samlebånder og stacker eller robot. Tørr linje omfatter tørkekammer, båndtørker, ettertørrking, fødekontainer, vekttrakter, tørrfiskpresse og samlebånder. Alle innstillinger for bevegelser og metoder som systemet skal utføre er via brukervennlig datasystem. Tørrfiskanlegget ble først produsert året 2002 og har vært under utvikling siden Processingline / Prosessinglinje Stockfishpacking / Tørrfiskpakking Headbreaker / Hodeknekker Wastewater Cleaning Unit Malmey’s cleaning unit consists of a coarse screening drum, fine screening belt og dissolved air flotation (DAF) unit. The Coarse screening drum filters particles from 2000 µm and larger. The Fine screening belt filters particles between 500-2000 µm. The DAF unit uses dissolved air flotation to remove particles, fat and oil from the wastewater which is injected with dissolved air (micro bubbles) which becomes attached to the particles allowing them to float to the surface where they form a scum which is skimmed off. Wastewater Cleaning Unit / Renseanlegg The Cleaning unit can be delivered with or without the Coarse screening drum and or the Fine screening belt. Renseanlegg for avløpsvann Malmey renseanlegg består av en grov filterings trommel, fin filterings bånd og oppløst luft flotasjon (DAF) enhet. Grov filterings trommelen filterer partikler fra 2000 µm og større. Fin filterings båndet filterer partikler mellom 500-2000 µm. DAF enheten bruker oppløst luft flotasjon for å fjerne partikler, fett og olje fra avløpsvannet som injiseres med oppløst luft (mikrobobler) som blir festet til partiklene slik at de kan flyte opp til overflaten hvor de danner skum som fjernes. Wastewater Cleaning Unit / Renseanlegg Renseanlegget kan leveres med eller uten grov filterings trommelen og eller fin filterings båndet. Coarse Screening Drum / Grov filterings trommel Flow rate: 5 - 500m3 per hour of wastewater. Detention time: From 3 minutes and up. Reduction performance Parameter COD BOD TSS Total nitrogen Total phosphorus Oil Grease Reduction (%) Up to 50 Up to 50 Up to 85 Up to 45 Up to 85 Up to 85 Up to 95 Coarse Screening: 2-6mm perforated drum. Dissolved Air Flotation (DAF): Generation of saturated pressure water with a two stage pump technology and a pressure tank. This unit provides the best available techniques known on market today for water and wastewater management. Málmey ehf. / Reykjavíkurvegur 60 / 220 Hafnarfjörður / ICELAND / Tel: +354 590 7700 / sales@malmey.is / www.malmey.is