HVSC Shore Connections for ships

advertisement
ABB Marine
High Voltage Shore Connection
© ABB Group
April 13, 2015 | Slide 1
Driving forces for shore connection

Green profiling of cities and ship operators

Regulations like

© ABB Group
April 13, 2015 | Slide 2

MARPOL 73/78 Annex VI
Limits on sulphur oxide and nitrogen
oxide emissions from ship exhausts and
prohibit deliberate emissions of ozone
depleting substances

EU Directive 2005/33/EG
Limits the amount of sulphur to 0,1% in
all marine fuel used while at berth for
more than 2 hours in European ports

EU Recommendation 2006/339/EG
The commission recommends its
membership countries to promote shore
side electricity facilities
Cost of producing electricity on board
Infrastructure Considerations

Voltage, frequency and grounding of the
supplying network and ship network

Continuous and temporary power
demand

Cable management systems
 On shore

© ABB Group
April 13, 2015 | Slide 3
On board

Location of ship berth

Location of shore connection point on
board

Available space on board

Existing ship distribution network

Safety management
ABB Marine Shore Connection Concept
Shore
Connection Box
© ABB Group
April 13, 2015 | Slide 4
Shore Connection Feeder

The ABB High Voltage shore
connection is an integrated
system of both power and
control equipment for
seamless power transfer

The ABB Shore connection
concept will comply to the
international standards, which
are being developed

IEC 60092-510 edition1
IEC/ISO PAS
On board Installation
Depending on the
vessel’s design, ABB
Marine Services is
able to install and
commission a
complete shore
connection system as
a turnkey project
during operation of
the vessel with out
interruptions of
services
© ABB Group
April 13, 2015 | Slide 5
Shore Connection System Solutions
Example

Light grey = ABB
delivery for OPS

RED lines = HV
circuit

BLACK lines =
control circuit
© ABB Group
April 13, 2015 | Slide 6

In this example the cable and cable reel
are located on board the vessel

The power cable from the ShoreConnection Box is connected directly to
the Main Switchboard

Power transfer is seamless

Synchronization and load transfer
of the shore power will be controlled
in the Engine Control Room and it is
fully automatic
Shore Connection Control and Supervision
© ABB Group
April 13, 2015 | Slide 7

Power transfer is seamless

Synchronization and load transfer
of the shore power will be controlled in
the Engine Control Room and it is
fully automatic

Interfacing to ship automation and onshore supply

Procedure can also be followed on
shore side
ABB Shore Connection benefits

Turn key supply
for the complete system

Safety through experience
and system understanding

Reliability with type approved
equipment

Availability of ABB worldwide
service network

Environmental benefits through
lower emissions

Better comfort due to reduced vibration and noise

Flexible arrangement and easy installation

Reduced lifecycle cost by reduced fuel consumption and maintenance
cost
© ABB Group
April 13, 2015 | Slide 8
References
Vessels with ABB High Voltage Shore connection system in
use today
© ABB Group
April 13, 2015 | Slide 9

Sun Princess
Cruise vessel
6,6 kV

Dawn Princess
Cruise vessel
6,6 kV

Sea Princess
Cruise vessel
6,6 kV

Ocean Princess
Cruise vessel
6,6 kV

Golden Princess
Cruise vessel
6,6 kV

Amsterdam
Cruise vessel
11 kV

Zuiderdam
Cruise vessel
11 kV

Westerdam
Cruise vessel
11 kV

Oosterdam
Cruise vessel
11 kV

Noordam
Cruise vessel
11 kV
© ABB Group
April 13, 2015 | Slide 10
Download