A Project Update for Trumpington
Residents’ Association
The Team
Countryside Properties - Special Projects
• Jo Clark – Planning
• Nigel Borrell – Clay Farm Technical
• James Blair – Clay Farm Site Manager
Countryside Properties– Housebuilding
• Jonathan Gimblett – Development
• Janice Kain – Glebe Farm Technical
• Steve Clarke – Glebe Farm Technical
• Richard Mortimer – Oxford Archaeology
• Paddy Mohan – Tamdown
Planning Permissions
On 6th August 2010 the following approvals were granted:
Clay Farm
• Outline planning permission for up to 2250 dwellings, community
facilities, 49ha strategic open space, landscaping, infrastructure.
• Full planning permission for the spine road, balancing ponds,
landscaping and works to trees
Glebe Farm
• Full planning permission for 286 dwellings, open spaces and
landscaping.
Clay Farm Outline Planning Permission
Outline planning permission for
up to 2250 dwellings, community
facilities, 49ha strategic open
space, landscaping,
infrastructure.
Full Planning Permission for the Spine
Road at Clay Farm
Including works to plantations
and formation of balancing
ponds
Glebe Farm Full Planning Permission
Full planning permission for 286 dwellings, open spaces and
landscaping.
Clay Farm Outline Planning Conditions
Approved:
•
•
•
•
•
•
Site-wide Ecological Conservation Management Plan
Green Corridor Strategic Landscaping
Groundwater Report
Play Strategy
Allotments and Community Gardens Proposal
Phasing Plan
Submitted but not yet approved:
• Design Code – exhibition on 4th February
• Surface Water Strategy
• Strategic Construction Environmental Management Plan
Clay Farm Phasing Plan
Clay Farm Design Code – Exhibition on
4th February at Trumpington Pavilion
Current Applications at Clay Farm
Reserved Matters Application for 308 dwellings – submitted 22nd
December. Exhibition on 4th February.
Current Applications at Clay Farm
Reserved Matters Application
for foul pumping station and
works to plantations
The Next Countryside Planning
Applications at Clay Farm
Reserved Matters Application for
landscaping and drainage west of
Hobson’s Brook
The Next Countryside Planning
Applications at Clay Farm
Reserved Matters Application for
landscaping of the Green Corridor
The Housebuilders
Infrastructure Work at Clay and Glebe Farm
Clay Farm, Glebe Farm
and the Cambridge
Biomedical Campus in
context
Infrastructure Work at Glebe Farm
Glebe Farm Site Access
Infrastructure Work at Glebe Farm
Glebe Farm off-site improvements to pedestrian and cycle routes
Programme of Work on Site at Clay Farm
• Surface water
• Foul water
• Highways
Clay Farm Spine Road Trees
Clay Farm Spine Road Trees
Glebe Farm Site Layout and
Traffic Management Plan 1
Glebe Farm Site Layout and
Traffic Management Plan 2
Glebe Farm Aerial View
Glebe Farm Landscaping
Programme Summary
• Site Infrastructure works underway
• House building to start on Clay Farm in June – south-western part
of the site (subject to planning), and Glebe Farm in May 2011
• During 2011 Applications from Bovis, Skanska and Countryside
• First housing occupations 2012
• Countryside to continue to manage the sites
• New Great Kneighton website