Wastewater, a Resource not a Burden! Flemming B Møller Senior Technical Advisor, Project Manager Flemming B Moller • Senior Technical Advisor • Project Manager • Marine Engineer and experienced WWTP Operations Manager Aarhus Water • • • • Volume of abstracted, treated and distributed drinking water Volume of processed wastewater Number of employees Annual budget Our vision is to be a leader amongst water companies 3957 M gallons/year 7915 M gallons/year 209 146 mill USD/year Come learn more about... • • Net Zero WWT Plants, is that real? How WWT anaerobic digesters can create revenue streams A WRP consists of blocks, we know how to put them together ! Agenda. • What steps have we taken to make the energy producing WWTP in Aarhus a reality? • Reduction of energy • Production of energy • Struvite - From problem to resource • Best Practices US/DK First Step for Aarhus Vand – Energy Management Our consumption of electricity used to be large at our WWTP. In the fall of 2009, we were energy certified according to the European DS 2403 standard in our efforts to reduce our energy consumption. Reality – where Does the Energy Go Electrical Power Consumption Aeration 37 % 6 Energy Neutrality And Beyond The Development in electricy consumption – Marselisborg RA Average 24 – hour electricity consumption Total reduction achieved 27% New Sandfilter + 1000 kWh/d Process Optimizing New Blower Energy Balance - Power Self Sufficiency % % Introduction – Marselisborg WWTP Energy Savings – Power Production Optimization of N-removal and Power Consumption Set Point % DO Ammonium Nitrate HV Turbo blowers - 1992 • • • • Reduction in electricity consumption : 300,000 kWh/year CO2-reduction: 153 tons/year Construction costs : US$ 270.000 ROI: 4-5 years Key Figures ABS HST Compressor • • • • • Type: HST 40-350-1-L-4 Airflow 5000-16000 Nm3/h Power 350 Kw Pressure 430 mbar Water Depth 4 meter 15 Specific Energy Consumption – New Blower (HST Compressor) 0,014 kWh/Nm3 Kapselblæsere, Nøgletal (Egå, og Åby): 0,019-0,023 Positive displacement blower, Key figures (Egå, Viby Viby og Åby): 0,019-0,023 kWh/Nm3 kWh/Nm3 Sludge Balances and Control of Aerobic Sludge Age Increasing Co-generation of Electricity/ Excess Heat from Biogas Replacement of 3 old gas engines with two high efficiency - 2 pcs 250 kW - CHP units • Construction costs : 1,382,000 US$ CO2-reduction: 426 tons/year • ROI: 3 years • Construction period: 2010-12 • Electricity production (additional production): approx 1 mio kWh/year • • • 18 Power efficiency 38-39% Excess heat efficiency 50-55% Total efficiency 88-94% Surplus Heat from Biogas – Marselisborg WWTP Construction costs: US$ 180,000 Annual Income (sale): US$ 71,000 ROI: < 1 year CO2 Reduction: 322 ton/year Excess heat sales of 2.5 GWh/year (2013) 19 Struvite - From Problem to Ressource Recovery of a valuable phosphorous resource The problem • Gray irritating material in pipes, digesters and sludge treatment processes Mg2+ + HPO42-+ NH4+ + 6H2O → MgNH4PO4,6H2O + H+ magnesium +phosphorous +ammonium + water → The resource 12.6 % P, 5.6 % N, 10 % Mg a premium fertilizer! struvite + acid Full Scale Struvite Plant Aaby WWTP Capacity of plant: •Capacity 2600 gallons reject/h •3-400 kg Struvite/day •2 reactors Benefits of P-recovery: •Fewer problems with dewatering equipment •Savings on chemicals for P-removal in main process •Less sludge production. •Less polymer consumption •Less Electricity for nitrification (less NH4) •More biogas •Increase in plant capacity •ROI 5-7 years 21 Where are we going? Consulate General of Denmark in Chicago US - WWTP Our focus • Sharing and exchanging ”best practices” and knowledge on technical solutions as related to the entire Water Cycle. • Looking for US Champions who want to enter into a mutual knowledge sharing exchange and have an ongoing working relationship with our Water Specialist/WTA Next step • Workshop at Downers Grove, Nick Maninga on January 27, 2015 • Fact finding trip to Denmark Wastewater, a Resource not a Burden! Thank you for your attention.