m3/day - SWAP-bfz

advertisement
EXPERIENCES IN PROMOTING SUSTAINED
IMPETUS FOR WATER & SANITATION
PRESENTED BY ENG MALAQUEN
MILGO - CEO
ATHI WATER SERVICES BOARD
1
VISION
A future with reliable, affordable, and safe water and sewerage services that
exceed our customers’ expectations
MISSION
To improve the quality of life of our community by ensuring
access to safe water and sewerage services.
2
Introduction
• AWSB was formed in March 2003
as a result of Water Act 2002;
• Mandate: broadly responsible for
developing infrastructure and
provision of Water supply and
sewerage services;
• Coverage: Nairobi City, Thika East
, Thika West, Ruiru, Gatanga,
Kiambu East, Gatundu, Limuru,
Lari and Kikuyu Districts;
• Area of coverage is about
4,000Km2 with a population of
5million people.
•
Source: Water Service Boards Areas of jurisdiction, Ministry of Water
and Irrigation
RIFT
VALLEY
NORTHERN
LAKE
VICTORIA
NORTH
LAKE
VICTORIA
SOUTH
TANA
ATHI
TANATHI
COAST
Historical background – Nairobi Supply
• The initial water supply facility for
Nairobi was constructed in 1899
abstracting water from Nairobi river in
the Athi river catchment.
• Kikuyu springs were first water source
developed in 1900-1906. The yield
from this source was 5,000m3/day.
• Ruiru (photo) is the second water
source developed during 1936 to
1938. Ruiru dam completed in 1950.
The yield is 22,000m3/day.
Developed Water Sources for Nairobi City
• Third is Sasumua dam
located up stream of the
Chania river was completed
in 1956. Production is
57,000m3/day.
• Lately, Thika dam and
Ngethu t/works system were
developed from 1974 to 1994
in three phases. Total
capacity is 440,000m3/day.
(schematic diagram on source next
slide)
•Ruiru 2
Summary of Existing Water Production for
Nairobi
Source
Kikuyu springs
Rated capacity
(m3/day)
Treated water flows
(m3/day)
5,000 (11,000)
4,800 (11,000)
Ruiru dam
22,000
18,000
Sasumua dam
59,000
42,000
Thika Dam
440,000
327,000
Total
532,000
398,000
Development objectives of WaSSIP II
• Rehabilitating selected existing water production,
transmission, storage and distribution facilities and waste
water collection, treatment and disposal facilities
• Construction of new water treatment works in identified
towns
• Expanding piped water supply services to underserved
areas and through expansion of primary and secondary
distribution systems
• Refining and strengthening the institutional structure,
emphasizing on increasing accountability and
transparency of the institutional, governance and
management framework
Challenges….. (some)
• Huge investment estimated at Kshs 42 Billion
required to develop infrastructure to meet
medium term (2020) water demands;
• Competing needs for scarce water resources.
Athi catchment is said to have 162m3/cap/year
against the available 650m3/cap/year Nationally.
• High unaccounted for water.
• Environmental degradation and climate change
effects;
NAIROBI PROJECTED POPULATION
BY YEAR 2030
YEAR
PROJECTED
POPULATION
%GE GROWTH
2005
2,775,087
24
2010
3,441,748
20
2015
4,147,304
20
2020
4,997,498
16
2025
5,793,470
16
2030
6,716,220
SOURCE: NAIROBI NETWORK MODELLING FINAL REPORT (AUG 2007) by Suereca/CAS JV
NAIROBI PROJECTED WATER
DEMAND BY YEAR 2030
YEAR
2005
2010
2015
2020
2025
2030
PROJECTED WATER
DEMAND
542,217
672,994
816,141
981,212
1,147,327
1,340,073
%GE GROWTH
DEMAND
24
21
20
17
17
SOURCE: NAIROBI NETWORK MODELLING FINAL REPORT (AUG 2007)
by Suereca/CAS JV
SITUATION ANALYSIS
• Currently, the water demand stands at
672,994 m3 per day against a
production of 501,350 m3 per day –
hence a deficit of 171,644 m3/day
which is 25% deficit
• It is estimated that current service
levels for Nairobi City stand at 76 l/c/d
(Source: Draft Working Paper No 1 of February 2011, Agis BCEOM/MIPP)
Current
Status
on
Sewerage
• The sewerage infrastructure in Nairobi
only covers 25% of the area and
serves about 40% of the population.
• Currently,
there
are
178,099
connections to the existing sewerage
network.
Completed works
• Rehabilitation of Sasumua dam spillway and
embankment to restore the dam’s storage capacity
from 5 million m3 to 16 million m3.
• Rehabilitation of 23kms of water network within the
city of Nairobi and two booster stations aimed at
reducing ufw by 35% by December 2011
• Drilled and equipped 45 boreholes in the Nairobi
City in low income and high density areas producing
20,00 m3 per day.
•
14
• Construction of 40 elevated tanks of
various capacities with a total storage
capacity of 1,500 m3.
• Constructed 4 new water treatment
plants to produce 23,000 m3 per day.
• Constructed 2 new water treatment
plants in Komothai, and Bathi to
produce 9,000 m3 per day.
15
On-going works
• Constructing a new raw water intake
works and 2 treatment plants to
produce 13,000 m3 per day in Ruiru,
and 4,000 m3 in Juja.
• Supply of 340Km water pipes and
assorted fittings, 10Km sewers,
manhole rings and fittings. WSPs
implemented the works under the KKV
programme
16
• Rehablitation works for the main Ngethu to Gigiri.
The scope of works includes construction of 17Km
transmission main from Kwamaiko to Gigiri reservoir
and rehabilitation of Ngethu-Gigiri pipeline
• Construction of 20 water kiosks, 20 ablution blocks,
drilling and equipping 6 boreholes, 6 elevated steel
tanks capacity 48m3 each, and connection of
existing facilities to the water and sewer network is
ongoing. The works are under the project
construction of Independent Water Supply Points
and Sanitation Blocks in informal settlements
17
Sewerage works - Completed
• Construction of 1km f sewer in Umoja
• Construction of 27 kms trunk sewers
• Construction of 6 nos ponds, desludging
of 1 fulcultation ponds and 3 maturation
ponds
• Rehabilitation of Ngong river trunk sewers
to reduce spillage into the Ngong River
18
Sewerage – Ongoing
• Laying of 40kms of sewer pipes in the informal settlements of
Nairobi City by end of June 2012
• Laying of 8kms of sewer with 193 manholes to benefit 200,000
people.
• Construction of sanitation facilities in Kiambogo, Kirasha,
Gathangari, Githirioni, and Utugi schools. Other works under
lot 2 are substructure walling in Wamitaa, Ndundu,
Kiawandiga, Ndunyu Chege and Rubiro primary schools. All
the VIP latrines are completed and in use by the students
19
• Rehabilitating of Eastleigh Business
district infrastructure to make it a
modern CBD Works carried out include
trenching of 2km sewerline along
Muinami- Muratina streets and laid
700m sewer lines. The project
trenched and pipelaid 6.5km water
pipelines.
20
Community Water Projects
• Athi Water Services board is implementing community water
project in informal settlements in Nairobi City and the districts
of Lari, Kiambu West, Kiambu East, Kikuyu, Gatundu South,
Gatundu North, Gatanga, Ruiru, Githunguri, Thika East and
Thika West.
• CPC Projects implemented in all districts except Kiambu West,
Ruiru and Thika West
• 17 projects financed so far. Total funds received by the CBOs
amount to KShs. 101,347,816.
• Out of these, 16 CBOs have received total funding from WSTF,
i.e. 1st & 2nd disbursements
• 3 CBO have signed funding agreements and are awaiting
release of funds
Future works
• Construction of Maragua Dam
• Construction of the Northern Collector
Tunnel to relay water to the main
treatment plants
• Rehabilitation and improvement of
various water treatment woks of
Mwagu intakes, construction of Kiambu
Water project,.
22
• Other projects are construction of a
water reticulation system for Ruiru and
Juja, construction of Gatanga and
Gatundu community water supply and
construction of Kamiti dam and
construction of Gigiri – JKIA water
pipeline and development of two deep
exploratory wells
23
Challenges
• Currently we still have high ufw standing
globally at 36% with some schemes having
ufw as high as 85% - Ithanga
• Huge capital investment requirements
• Our WSPs are still on a tariff which is not
able to meet operational expenses with very
high utility power bills
• Implementation of the new constitution which
raises issues about status of Boards and
ability to borrow.
24
Way forward
• AWSB has negotiated funding from
various agencies to continue with the
investment momentum to the tune of
USD 160 million (IDA – 145 million and
AFD 15 million USD)
• The Board has developed a shopping
basket of Kshs 40 billion and is keen to
continue implementing targeted
projects within its mandate
25
• Thank you
• Eng Malaquen Milgo
• CEO – Athi Water Services Board
26