ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Metropolitan Local Government Group Recycled Water Scheme For Metropolitan Adelaide Opportunities and Constraints Presented by Nathan Silby www.wallbridgeandgilbert.com.au Page 1 ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Recycled Stormwater • Harvest Volumes o Current – 8 GL/annum o Committed – 13 GL/annum o Proposed – 10 GL/annum USHOS 6.2, 11.6, 8.8 – 26.6 GL/a • “Water For Good” targeted capture and harvest of 35 GL/annum by 2025 www.wallbridgeandgilbert.com.au Page 2 ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Sewage • 85 GL/annum currently produced in the greater Adelaide area. • Approximately 25 GL/annum is reused. • Storage requirement 40 GL (Hope Valley + Happy Valley 14 GL) www.wallbridgeandgilbert.com.au Page 3 ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Recycled Stormwater v’s Treated Effluent • Combined potential yield ≈ 140 GL/annum • 75% of Adelaide's current mains water supply, (≈ 180 GL/a) & 40% of the predicted 2050 supply (≈360 GL/a) . • Demand for non-potable water less than potential supply – prioritisation of treated wastewater v's stormwater required. (Council irrigation Demand 5 GL/a) www.wallbridgeandgilbert.com.au Page 4 ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Distribution Networks • A number of constructed, committed & proposed networks across metro Adelaide. • Connection between networks to provide reliability of supply across council boundaries. www.wallbridgeandgilbert.com.au Page 5 Page 6 Page 7 Page 8 ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Indicative Network Connection Costs Network Connection Possible Route Connector Costs Length Adelaide Airport – Charles Trimmer Parade 5km $2.1m Routes to run minimal $0.2m 1km $0.4m 1.5km $0.7m N/A Under tender 2km $0.9m 1.5km $0.3m Curtis Road 2.5km $1.1m Extensive route 20-30km $15m Sturt Connection Adelaide Airport - GAP parallel in sections Barker Inlet – Charles Sturt Connection GAP – Eastern Region Connection First Avenue & Coker Street Walkerville Terrace & Stephen Terrace GAP – Unley Connection Hutt Rd & George Street Salisbury – Playford Connection Bellchambers Rd & West Avenue Salisbury – Tea Tree Gully Connection Barina Avenue & Alexander Avenue Salisbury / Playford and Virginia North-South Connection requiring further investigation www.wallbridgeandgilbert.com.au Page 9 ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Pricing • SA Water 75% Tier 2 – ($1.86) (Current mains water price $2.48) Bolivar <$0.15 sliding Glenelg $0.23 to $0.44 • Salisbury / TTG / Playford Usage $2.20 Supply $50/annum Bulk Transfer $1.60 www.wallbridgeandgilbert.com.au Page 10 ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Issues Moving Forward • Mixing recycled stormwater & treated effluent (ASR, benefits) • Prioritisation of source • Pricing (data, competition, restriction v price) • Detailed demand study to quantify likely demand for reuse water • Control of carp in treatment wetlands www.wallbridgeandgilbert.com.au Page 11 ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Issues Moving Forward • Assessment of the tertiary aquifers capacity to store expected volumes of stormwater. • Use of treated stormwater as a source of potable water. • Interconnection between council networks (operation, liability, benefits) • Funding www.wallbridgeandgilbert.com.au Page 12