This project is funded by the European Union Projekat finansira Evropska Unija 3RD STEERING COMMITTEE MEETING BELGRADE, 18 JUNE 2013 3. SASTANAK ODBORA ZA PRAĆENJE PROJEKTA BEOGRAD, 18. JUN 2013. GODINE This Project is funded by the European Union Project implemented by Human Dynamics Consortium Project implemented by Human Dynamics Consortium Projekat realizuje Human Dynamics Konzorcijum GENERAL OVERVIEW OF THE IMPLEMENTATION AND PRESENTATION AND OVERVIEW OF PROJECT QUARTERLY REPORT OPŠTI PREGLED IMPLEMENTACIJE PROJEKTA I PREZENTACIJA I PREGLED KVARTALNOG IZVEŠTAJA PROJEKTA Hans Lauritzen– Team Leader/Vođa tima This Project is funded by the European Union Project implemented by Human Dynamics Consortium Overview: Pregled: • Implementation status • Status implementacije projekta • 2nd Quarterly report • Drugi Kvartalni izveštaj • Project activities • Projektne aktivnosti • Upcoming activities • Naredne aktivnosti This Project is funded by the European Union Project implemented by Human Dynamics Consortium Implementation status Status implementacije projekta • Second quarter finalized 2nd of March 2013 • Drugi kvartalni period finaliziran 2. marta 2013. godine • Current reporting period: 3 March 2013 – 2 June 2013 • Period izveštavanja: This Project is funded by the European Union 3. mart 2013. – 2. jun 2013 . Project implemented by Human Dynamics Consortium Aktivnosti u drugom kvartalnom periodu implementacije bile su fokusirane na: Activities in the 2nd quarter of implementation focused on: • Legal Component (Component 1) implementation – activities related to IPPC/IED and Seveso legal analysis • Implementaciju pravne komponente (Komponenta 1)-aktivnosti u vezi sa IPPC/IED i Seveso pravnom analizom • Working group meetings • Sastanke radnih grupa • Component 3 – development of visibility materials, 1st visibility event and project website • Komponentu 3-priprema promotivnih materijala, uvodna konferencija projekta i internet stranica projekta • Component 4 - Preparation of technical Seveso documents • Komponentu 4-Priprema tehničkih Seveso dokumenata • Component 5 - Integrated permits content and Selection of installations for pilot sites • Komponentu 5-Sadržaj integrisanih dozvola i selekcija probnih postrojenja • Analysis of EMAS Global approach • Analizu EMAS global pristupa • Visibility Event 24 May 2013 • Uvodnu konferenciju 24. maja 2013. godine This Project is funded by the European Union Project implemented by Human Dynamics Consortium Outputs prepared: Pripremljeni rezultati: Component 1: Komponenta 1: Compliance Check Methodology First Draft of Tables of Concordance for IED and Seveso III Directive Review of the findings of the Legal Gap Analysis developed under EASS and IPA 2010 Projects Predložena metodologija za proveru usaglašenosti Prvi nacrt Tabela o usklađenosti za IED i Seveso III Direktivu Pregled rezultata u vezi Analize pravnih nedostataka koja je pripremljena u okviru EASS i IPA 2010 projekata Component 2: Preliminary Report on weaknesses and constraints identified through the previous and on-going related projects Component 3: Draft target groups list and composition This Project is funded by the European Union Komponenta 2: Preliminarni izveštaj o slabostima i organičenjima identifikovanim u toku prethodnih i tekućih srodnih projekata Komponenta 3: Finalni nacrt liste ciljnih grupa i sastav Project implemented by Human Dynamics Consortium Component 4: Provisions of Seveso Directive, from Seveso II Komponenta 4: to Seveso III (Roles and responsibilities of the Odredbe Seveso Direktive, od Seveso II do Seveso III (Uloge i odgovornosti operatera i Operators and the Competent Authorities) nadležnih organa) Component 5 Collection of best practices and case studies of BAT assessment and implementation (1st Draft) Basic contents of Monitoring Plan scheme Final report on Selection of IPPC installations Analysis of structure and contents of integrated permits in different MS Component 6 Working paper: Approach to EMAS Global/Third Country scheme in Serbia This Project is funded by the European Union Komponenta 5 Set najboljih praksi i studija slučaja procene implementacije Najboljih dostupnih tehnika (1. nacrt) Osnovni sadržaj šeme plana monitoringa Finalni izveštaj u vezi selekcije IPPC postrojenja Analiza strukture i sadržaja integrisanih dozvola u različitim Državama članicama Komponenta 6 Radni dokument: Pristup EMAS Global/ Šema zemalja trećeg sveta u Srbiji Project implemented by Human Dynamics Consortium Ressourse utilisation : Upotreba resursa This Project is funded by the European Union Project implemented by Human Dynamics Consortium Procenat iskorišćenih radnih dana u skladu sa planom u trećem kvartalnom periodu This Project is funded by the European Union Project implemented by Human Dynamics Consortium Planned usage of working days next Quarter and remaining working days per component: Planirana upotreba radnih dana u sledećem kvartalnom periodu i preostali radni dani po komponenti: This Project is funded by the European Union Project implemented by Human Dynamics Consortium Faktori koji utiču na implementaciju u Issues that affected implementation in the reporting period: • Procedure for approval of STEs defined, evaluation of JSTEs lasting longer than planned (horizontal) • IT changes related to activities of other projects and its analysis in order to avoid overlaps (Activity 2.10) • Since the new systematization is stable considerations is needed on the whole component 2. This Project is funded by the European Union periodu izveštavanja: • Definisana procedura za odobrenje kratkoročnih eksperata, evaluacija mlađih kratkoročnih eksperata je trajala duže nego što je bilo planirano (horizontalno) • IT promene u vezi sa aktivnostima drugih projekata i njihova analiza kako bi se izbegla preklapanja (Aktivnost 2.10) • Budući da je nova sistematizacija stabilna, neophodno je razmotriti celokupnu komponentu 2. Project implemented by Human Dynamics Consortium GENERAL OVERVIEW OF IMPLEMENTATION IN THE REPORTING PERIOD OPŠTI PREGLED IMPLEMENTACIJE U PERIODU IZVEŠTAVANJA Riccardo Quaggiato – IPPC ekspert George Mouzakis – Seveso ekspert This Project is funded by the European Union Project implemented by Human Dynamics Consortium HORIZONTAL ACTIVITIES • Web-site HORIZONTALNE AKTIVNOSTI •Internet stranica •Projektna dokumenta Project documents •Planirani događaji Scheduled events Members area •Članovi sajta •Vesti News This Project is funded by the European Union Project implemented by Human Dynamics Consortium HORIZONTAL ACTIVITIES Brief description of project activities Info on project team This Project is funded by the European Union HORIZONTALNE AKTIVNOSTI Kratak opis projektnih aktivnosti Informacije o projektnom timu Project implemented by Human Dynamics Consortium HORIZONTAL ACTIVITIES HORIZONTALNE AKTIVNOSTI Opening Conference Uvodna konferencija • 24.05.2013 at Serbian Chamber of Commerce • 24. 05. 2013. godine u Privrednoj komori Srbije • About 100 participants, more than 50 operators • 100 učesnika, više od 50 operatera • Proactive discussion, emerging need for info and support • Proaktivna diskusija, potreba za informacijama i podrškom This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp 1– Activities 1.1 and 1.2 Komponenta 1– Aktivnosti 1.1 i 1.2 LEGAL GAP ANALYSIS ANALIZA PRAVNIH NEDOSTATAKA • STEs deployment started in April; • Preliminary activities; • Analysis of laws • Draft methodology • • • • • Draft ToCs for IED and Seveso • III This Project is funded by the European Union Angažman kratkoročnih eksperata počeo je u aprilu; Preliminarne aktivnosti; Analiza zakona; Nacrt metodologije Nacrt Tabela usklađenosti za IED i Seveso III Project implemented by Human Dynamics Consortium Cmp 1– Activities 1.1 and 1.2 Komponenta 1– Aktivnosti 1.1 i 1.2 ANALIZA PRAVNIH NEDOSTATAKA LEGAL GAP ANALYSIS 1st • • • • 1. nacrt Tabele usklađenosti u vezi IEDdraft of ToC on IED: Direktive o industrijskim emisijama: • EU : IED (Poglavlje I-II) EU: IED (Chapter I-II) SR : Zakon o IPPC i srodnim SR: Law on IPPC and connected • zakonima/podzakonima; laws/bylaws; • Novi elementi obezbeđeni od strane New elements provided by IED IED • Rezultati koji će biti detaljno Findings to be detailed by GA objašnjeni Analizom nedostataka, a then recommendations zatim preporuke This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp 1– Activities 1.1 and 1.2 Komponenta 1– Aktivnosti 1.1 i 1.2 ANALIZA PRAVNIH NEDOSTATAKA LEGAL GAP ANALYSIS 1st draft of ToC on Seveso III: 1. nacrt Tabele o usklađenosti u vezi sa Seveso III: • Analysis of Seveso III Dir. • Analiza Seveso III Direktive. • Transpozicija odredbi u • Transposing provision in the zakone/podzakone nacionalnog National legislation zakonodavstva (MERZ i ostali) laws/bylaws (MERZ and others) • Obaveze EU • EU Obligations • Komentari u vezi statusa transpozicije • Comments on status of Treba da bude potvrđeno da će Analiza transposition pravnih nedostataka biti urađena uzimanjem u obzir samo Seveso IIIDirektive To be confirmed that LGA will be done considering Seveso III Dir. only This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp. 2 – Activity 2.1 DYNAMIC SWOT ANALYSIS • • Analysis of the findings identified by the other previous and on going projects, as well as the current findings, has been prepared In the fields of IPPC/IED and Seveso, the findings are not completely up-to-date due to the changes implemented in the intervening period This Project is funded by the European Union Komponenta 2 – Aktivnost 2.1 DINAMIČNA ANALIZA SNAGA, SLABOSTI, PRILIKA I PRETNJI (SWOT) •Pripremljena je analiza rezultata identifikovanih na prethodnim i tekućim projektima, kao i sadašnjih rezultata •Na polju IPPC/IED i Seveso, rezultati nisu u potpunosti ažurirani zbog promena implementiranih u periodu delovanja Project implemented by Human Dynamics Consortium Cmp. 2 – Activity 2.1 DYNAMIC SWOT ANALYSIS Komponenta 2 – Aktivnost 2.1 DINAMIČNA SWOT ANALIZA Findings Rezultata • Legal framework (amendments to Law on Env. Prot. And on IPPC, SEVESO III, inclusion of water permit into IP…) •Pravni okvir (izmene Zakona o zaštiti životne sredine i u vezi IPPC, SEVESO III, uključivanje dozvole za vodu u IP-Integrisanu dozvolu…) • IED (intra/inter-institutional cooperation, inspector’s role…) •IED (intra/inter-institucionalna saradnja, uloga inspektora…) • Seveso (implementation of SMS principles..) •Seveso (implementacija principa SMSSistema upravljanja bezbednošću…) • EMAS Global •EMAS global . This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp. 2 – Activity 2.1 DYNAMIC SWOT ANALYSIS Komponenta 2 – Aktivnost 2.1 DINAMIČNA SWOT ANALIZA Previous project and preliminary analysis have highlighted only weaknesses and gaps •Prethodni projekat i preliminarna analiza su istakli samo slabosti i nedostatke • • • Lack of identification of Strengths and Opportunities Seveso and EMAS have never been addressed by SWOT analysis Dynamic SWOT analysis can provide input to improve further actions (transposition, implementation, communication…) •Nedostatak identifikacije snaga/prednosti i prilika •Seveso i EMAS nikad nisu bili pokriveni SWOT analizom Dinamična SWOT analiza može da obezbedi inpute kako bi se poboljšale dalje akcije (transpozicija, implementacija, komunikacija...) LONG-TERM FOLLOW UP This Project is funded by the European Union DUGOROČNO PRAĆENJE . Project implemented by Human Dynamics Consortium Cmp 2– Activity 2.10 IT SOLUTIONS - - Additional meetings with SEPA: IT system will be changed (EMC project) No significant changes in strategy confirmed IT solutions for document management: necessary better coordination with other initiatives This Project is funded by the European Union Komponenta 2– Aktivnost 2.10 REŠENJA INFORMATIVNIH TEHNOLOGIJA - Dodatni sastanci sa SEPA organizacijom: IT sistem će biti promenjen (EMC projekat) - Potvrđeno je da nije bilo značajnih promena u strategiji - IT rešenja za upravljanje dokumentima: neophodna je bolja koordinacija sa drugim inicijativama Project implemented by Human Dynamics Consortium Cmp 3 – Activity 3.1 COMMUNICATION Target groups - List of stakeholders - Communication channels - Flow and direction This Project is funded by the European Union Komponenta 3 – Aktivnost 3.1 KOMUNIKACIJA Ciljne grupe -Lista zainteresovanih strana -Kanali komunikacije -Protok i pravac Project implemented by Human Dynamics Consortium Cmp 4 – Activity 4.1/4.2 SEVESO Komponenta 4 – Aktivnost 4.1/4.2 SEVESO Technical documents prepared during the reporting period: A. Preliminary analysis of provisions of Seveso Directive, required to upgrade the legal and administrative system from Seveso II to Seveso III (Roles and responsibilities of the Operators and the Competent Authorities). B. Technical rules for the implementation of Seveso II Directive C. Drawing up an External Emergency Plan. Tehnička dokumenta pripremljena za vreme perioda izveštavanja: This Project is funded by the European Union A. Preliminarna analiza odredbi Seveso Direktive, neophodna za ažuriranje pravnog i administrativnog sistema od Seveso II do Seveso III (Uloge i odgovornosti operatera i nadležnih organa). B. Tehnička pravila u vezi implementacije Seveso II Direktive C. Priprema Eksternog plana u slučaju udesa Project implemented by Human Dynamics Consortium Cmp. 5– Activity 5.1 Komponenta 5– Aktivnost 5.1 BAT implementation Implementacija Najboljih dostupnih tehnika Analysis of approaches/best practices used in different MS: Analiza pristupa/najboljih praksi upotrebljenih u različitim Državama članicama: • BREF and translations •BREF i prevodi • Opinions of TWGs • National guidance • IT tools • Multicriteria methods This Project is funded by the European Union S W O T •Mišljenja u vezi sa radnim grupama •Nacionalne instrukcije •IT oruđa •Višekriterijalne metode S W O T Project implemented by Human Dynamics Consortium Cmp. 5– Activity 5.4 Komponenta 5– Aktivnost 5.4 Monitoring Plans Planovi u vezi monitoringa Analysis of basic Monitoring activities in Integrated Permits: Analiza osnovnih aktivnosti monitoringa u integrisanim dozvolama: • BREF monitoring principles; •BREF principi monitoringa • Goal: (self)control, efficiency, compliance promotion •Cilj: (samo)kontrola, efikasnost, promocija usaglašenosti • What? (emissions, resources, noise, soil…) •Šta? (emisije, resursi, buka, zemljište...) • How: frequencies, sampling, methods and standards This Project is funded by the European Union •Kako: učestalost, uzorkovanje, metode i standardi Project implemented by Human Dynamics Consortium Cmp. 5– Activity 5.6 Komponenta 5– Aktivnost 5.6 Integrated Permits Templates Obrasci integrisanih dozvola Structure and contents of IP in different MS: Struktura i sadržaj Integrisanih dozvola u različitim Državama članicama: • UK, Ireland, Italy, Spain, Bulgaria, Austria; •Velika Britanija, Irska, Italija, Španija, Bugarska, Austrija; • Analysed characteristics: structure, conditions, monitoring plan •Analizirane karakteristike: struktura, uslovi, plan monitoringa • Good practices: clear conditions, plain language, reference to documents, IT solutions. •Dobre prakse: jasni uslovi, jednostavan način izražavanja, IT rešenja ENFORCEABILITY This Project is funded by the European Union SPROVODLJIVOST Project implemented by Human Dynamics Consortium Cmp. 5– Activity 5.5 Komponenta 5– Aktivnost 5.5. Selection of IPPC installations Selekcija IPPC postrojenja 1. Presence and number of IPPC installations: IPPC installations on Republic and Provincial level IPPC postrojenja na republičkom i pokrajinskom nivou This Project is funded by the European Union 1. Rasprostranjenost i broj IPPC postrojenja IPPC installations on Local level IPPC postrojenja na lokalnom nivou Project implemented by Human Dynamics Consortium Cmp. 5– Activity 5.5 Komponenta 5– Aktivnost 5.5 Selection of IPPC installations Selekcija IPPC postrojenja 2. 2. Kriterijumi evaluacije: Evaluation criteria: • Nr. Of installations • Broj postrojenja • Relevance (economic impact; complexity of • Relevantnost (ekonomski uticaj; kompleksnost procesa proizvodnje; ekološki uticaj; kompleksnost izdavanja dozvola) production process; environmental impact; complexity of permitting) 3. Evaluation grid: Evaluaciona tabela: Kategorija Broj postrojenja Relevantnost Ukupan iznos Proizvodnja energije Proizvodnja i prerada metala Industrija minerala Hemijska industrija Upravljanje otpadom Ostale aktivnosti Proizvodnja hrane i pića - Intenzivan uzgoj This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp. 5– Activity 5.5 Komponenta 5– Aktivnost 5.5. Selection of IPPC installations Selekcija IPPC postrojenja 4. 4. Procena zahteva (nivo kompletiranosti, 5. Assessment of applications (level of completeness, complexity) and state of operability with MERZ and AP Selected installations kompleksnosti) i stanje operativnosti što se tiče MERZ i AP 5. Selektovana postrojenja Nacionalni nivo National level Provincial level Local level IMPOL SERVAL (Sevojno) Aluminum production HIPOL ad (Odžaci) Polypropylene prod DIJAMANT ad (Zrenjanin) Oil and derivate production This Project is funded by the European Union IMPOL SERVAL (Sevojno) Proizvodnja aluminijuma HIPOL ad Pokrajinski nivo (Odžaci) Proizvodnja polipropilena Lokalni nivo DIJAMANT ad (Zrenjanin) Proizvodnja ulja Project implemented by Human Dynamics Consortium Cmp. 6 – EMAS Decision on EMAS Global/Third Country have been taken and first steps in approach defined Output: First approach to EMAS Global/Third country scheme Komponenta 6 – Ekomenadžment i šema provere (EMAS) Doneta je odluka u vezi sa EMAS Global/Zemlje trećeg sveta i definisani su prvi koraci u pristupu Rezultati: Prvi pristup Šemi EMAS Global/Zemlje trećeg sveta This Project is funded by the European Union Project implemented by Human Dynamics Consortium PROJECT PLANNING FOR NEXT REPORTING PERIOD PLANOVI PROJEKTA ZA SLEDEĆI IZVEŠTAJNI PERIOD This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp. 1 – LEGAL ACTIVITIES Activities 1.1 and 1.2 Finalization of draft ToCs in line with the comments received by MERZ; Preparation of draft legal gap analysis report for IED and SEVESO III; Komponenta 1 – PRAVNE AKTIVNOSTI Aktivnosti 1.1 i 1.2 Finalizacija nacrta Tabele o usklađenosti u skladu sa komentarima primljenim od strane MERZ; Priprema nacrta izveštaja Analize pravnih nedostataka za IED i SEVESO III; Activity 1.3 Aktivnost 1.3 Draft ToC, legal gap analysis and legislation on EMAS III Regulation Nacrt ToC, Analiza pravnih nedostataka i zakonodavstva u vezi sa EMAS III Uredbom Milestones: Final ToCs IED and Seveso III Directive Legal gap analysis IED and Seveso III Directive Draft ToC, legal gap analysis and legislation on EMAS III Regulation This Project is funded by the European Union Glavni rezultati: Finalna Tabela o usklađenosti u vezi sa IED i SEVESO III Direktivom Analiza pravnih nedostataka o IED i SEVESO III Direktivom Nacrt ToC, Analiza pravnih nedostataka i zakonodavstva u vezi sa EMAS III Uredbom Project implemented by Human Dynamics Consortium Cmp. 2 – INSTITUTIONAL STRENGTHENING Komponenta 2 – INSTITUCIONALNO JAČANJE Activity 2.1 – Dynamic SWOT Analysis – pending approval by the SC Milestones: • Aktivnost 2.1 - Dinamična SWOT analizaočekuje se odobrenje od strane Nadzornog odbora za praćenje projekta SWOT meeting report, Glavni rezultati: Draft and final dynamic SWOT Analysis, including description of three relevant areas, main stakeholders and involved structures, findings and recommendations (including institutional and administrative issues and progress monitoring system). • Izveštaj o SWOT analizi This Project is funded by the European Union •Nacrt i finalna dinamična SWOT analiza, uključujući opis tri relevantne oblasti, glavne zainteresovane strane i uključene strukture, rezultate i preporuke (uključujući institucionalna i administrativna pitanja i progres sistema monitoringa) Project implemented by Human Dynamics Consortium Cmp. 2 – INSTITUTIONAL STRENGTHENING Activity 2.2 Preparation of administrative procedure for IPPC/IED Komponenta 2 – INSTITUCIONALNO JAČANJE Aktivnost 2.2 Priprema administrativne procedure za IPPC/IED • 1 WG1/ IPPC/IED meeting. • Radna grupa 1/IPPC/IED sastanak. • 1 WG1/ Seveso meetings • Radna grupa 1/Seveso sastanci Milestones: • Draft procedure for IPPC /IED Glavni rezultati: • Nacrt procedure za IPPC/IED This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp. 2 – CAPACITY BUILDING Activity 2.3 TNA Komponenta 2 – JAČANJE KAPACITETA • Preparation of draft TNA and training programme: • Institutional organization has changed and is now steady • New Directives introduced important topics • New tools are being prepared and introduced by the project Milestones: • Draft TNA and training programme This Project is funded by the European Union Aktivnost 2.3 TNA - Analiza potreba za obukom • Priprema nacrta TNA-Analize potreba za obukom i program obuka • Institucionalna organizacija je promenjena i sada je stabilna • Nove direktive su uvedene u vezi važnih tema • Nova oruđa se pripremaju i uvode od strane projekta Glavni rezultati: • Nacrt TNA i program obuka Project implemented by Human Dynamics Consortium Cmp. 2 – IT SOLUTIONS Komponenta 2 – REŠENJA INFORMATIVNIH TEHNOLOGIJA Activity 2.10 Aktivnost 2.10 • Assessment of existing IT systems for environmental data management; •Procena postojećih IT sistema u vezi upravljanja podacima o životnoj sredini; • Identification of needs and requirements for document handling •Identifikacija potreba i zahteva za rukovanje dokumentima Milestones: Glavni rezultati: • Preliminary report on assessment of existing IT solutions • Preliminarni izveštaj o proceni postojećih IT rešenja This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp. 3 – COMMUNICATION Activities • 3.1 - Contact and activation of target groups (mailing list); • 3.2 - List and preparation of promotional materials; • 3.3 - Planning of promotional activities on IED and Seveso Komponenta 3 – KOMUNIKACIJA Aktivnosti • 3.1-Kontakt i aktivacija ciljnih grupa (distributivna lista); • 3.2-Lista i priprema promotivnih materijala; • 3.3-Planiranje promotivnih aktivnosti u vezi IED i Seveso Glavni rezultati: Milestones: • List and design of promotional materials • List of public debates/meetings This Project is funded by the European Union • Lista i dizajn promotivnih materijala • Lista u vezi sa javnim raspravama/sastancima Project implemented by Human Dynamics Consortium Cmp. 4 – SEVESO Activities 4.1 and 4.2 are expected to be completed by the end of the quarter (August 2013). The output of these activities is necessary prerequisite for the start of Activity 4.3. Milestones: - Final Methodology for the selection of Komponenta 4 – SEVESO Očekuje se da Aktivnosti 4.1 i 4.2 budu dovršene do kraja kvartalnog perioda (avgust 2013. godine). Rezultati ovih aktivnosti su neophodan preduslov za početak Aktivnosti 4.3. Glavni rezultati: target Sectors and Target establishments, -Finalna metodologija za selekciju ciljnih sektora i postrojenja - Three target sectors selected -Izabrana tri ciljna sektora - Three target establishments selected -Izabrana tri ciljna postrojenja - Critical emergency protection zones to be selected, -Selekcija kritičnih zona zaštite u slučaju opasnosti - Risk acceptance criteria to be selected. -Selekcija kriterijuma za prihvatanje rizika. This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp. 5 – IPPC/IED-1 Komponenta 5 – IPPC/IED-1 Activity 5.1 Aktivnost 5.1 • Definition of ToC of BREF User Manual (BAT assessment approach); • Definicija Tabele o usklađenosti Priručnika za korisnike BREF dokumenata (Pristup procene Najboljih dostupnih tehnika); Activity 5.3 • Analysis of Serbian legislation on ELVs; • Identification of criteria to set conditions in integrated permits. Aktivnost 5.3 •Analiza srpskog zakonodavstva u vezi ELVGraničnih vrednosti emisija; •Identifikacija kriterijuma za utvrđivanje uslova u integrisanim dozvolama. Milestones: • ToC of ‘BREF User Manual’ Glavni rezultati: • Analysis of Serbian legislation on ELVs •Tabela o usklađenosti “Priručnika za korisnike BREF dokumenata” •Analiza srpskog zakonodavstva u vezi sa Graničnim vrednostima emisija This Project is funded by the European Union Project implemented by Human Dynamics Consortium Cmp. 5 – IPPC/IED-2 Komponenta 5 – IPPC/IED-2 Activity 5.4 Aktivnost 5.4 • Start drafting Monitoring Plans scheme; • Početak pripreme nacrta šema planova u vezi monitoringa; Activity 5.5 • Start analysis of applications of 3 installations for drafting permit; Aktivnost 5.5 • Početak analize zahteva 3 postrojenja za pripremu nacrta dozvole; Activity 5.6 Aktivnost 5.6 • Preparation of Integrated Permit templates. • Priprema obrazaca integrisane dozvole. Glavni rezultati: Milestones: • Report on practical cases about Monitoring • Draft of Monitoring Plan scheme • 1st draft of Integrated Permit Scheme This Project is funded by the European Union • Izveštaj o praktičnim slučajevima o monitoringu • Nacrt šeme plana monitoringa • Prvi nacrt šeme o integrisanim dozvolama Project implemented by Human Dynamics Consortium Cmp. 6 – EMAS Komponenta 6 – EMAS Activity 6.1 Aktivnost 6.1 • EMAS market analysis; • Tržišna analiza EMAS; • Definition of a roadmap for EMAS Global implementation. • Definicija razvojnog puta za implementaciju globalnog EMAS. Glavni rezultati: Milestones: • Draft of EMAS market analysis • Work-plan and priority list of steps to be implemented • Procurement documents for translation of EMAS regulation This Project is funded by the European Union • Nacrt tržišne analize EMAS • Plan rada i lista prioritetnih koraka koje treba primeniti • Prevod dokumenata o EMAS uredbama Project implemented by Human Dynamics Consortium