Komponenta 2

advertisement
This project is funded by the European Union
Projekat finansira Evropska Unija
3RD STEERING COMMITTEE
MEETING
BELGRADE, 18 JUNE 2013
3. SASTANAK ODBORA ZA
PRAĆENJE PROJEKTA
BEOGRAD, 18. JUN 2013. GODINE
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Project implemented by Human Dynamics Consortium
Projekat realizuje Human Dynamics Konzorcijum
GENERAL OVERVIEW OF THE
IMPLEMENTATION AND
PRESENTATION AND OVERVIEW OF
PROJECT QUARTERLY REPORT
OPŠTI PREGLED IMPLEMENTACIJE
PROJEKTA I PREZENTACIJA I
PREGLED KVARTALNOG IZVEŠTAJA
PROJEKTA
Hans Lauritzen– Team Leader/Vođa
tima
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Overview:
Pregled:
•
Implementation status
•
Status implementacije projekta
•
2nd Quarterly report
•
Drugi Kvartalni izveštaj
•
Project activities
•
Projektne aktivnosti
•
Upcoming activities
•
Naredne aktivnosti
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Implementation status
Status implementacije projekta
•
Second quarter finalized 2nd of
March 2013
•
Drugi kvartalni period finaliziran 2.
marta 2013. godine
•
Current reporting period: 3 March
2013 – 2 June 2013
•
Period izveštavanja:
This Project is funded
by the European Union
3. mart 2013. – 2. jun 2013 .
Project implemented by Human
Dynamics Consortium
Aktivnosti u drugom kvartalnom periodu
implementacije bile su fokusirane na:
Activities in the 2nd quarter of
implementation focused on:
•
Legal Component (Component 1)
implementation – activities related to
IPPC/IED and Seveso legal analysis
•
Implementaciju pravne komponente
(Komponenta 1)-aktivnosti u vezi sa
IPPC/IED i Seveso pravnom analizom
•
Working group meetings
•
Sastanke radnih grupa
•
Component 3 – development of visibility
materials, 1st visibility event and project
website
•
Komponentu 3-priprema promotivnih
materijala, uvodna konferencija projekta i
internet stranica projekta
•
Component 4 - Preparation of technical
Seveso documents
•
Komponentu 4-Priprema tehničkih Seveso
dokumenata
•
Component 5 - Integrated permits content
and Selection of installations for pilot sites
•
Komponentu 5-Sadržaj integrisanih
dozvola i selekcija probnih postrojenja
•
Analysis of EMAS Global approach
•
Analizu EMAS global pristupa
•
Visibility Event 24 May 2013
•
Uvodnu konferenciju 24. maja 2013.
godine
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Outputs prepared:
Pripremljeni rezultati:
Component 1:
Komponenta 1:
 Compliance Check Methodology
 First Draft of Tables of Concordance
for IED and Seveso III Directive
 Review of the findings of the Legal
Gap Analysis developed under EASS
and IPA 2010 Projects
 Predložena metodologija za proveru
usaglašenosti
 Prvi nacrt Tabela o usklađenosti za IED i
Seveso III Direktivu
 Pregled rezultata u vezi Analize pravnih
nedostataka koja je pripremljena u okviru
EASS i IPA 2010 projekata
Component 2:
 Preliminary Report on weaknesses
and constraints identified through the
previous and on-going related projects
Component 3:
 Draft target groups list and
composition
This Project is funded
by the European Union
Komponenta 2:
 Preliminarni izveštaj o slabostima i
organičenjima identifikovanim u toku
prethodnih i tekućih srodnih projekata
Komponenta 3:
 Finalni nacrt liste ciljnih grupa i sastav
Project implemented by Human
Dynamics Consortium
Component 4:
 Provisions of Seveso Directive, from Seveso II Komponenta 4:
to Seveso III (Roles and responsibilities of the  Odredbe Seveso Direktive, od Seveso II do
Seveso III (Uloge i odgovornosti operatera i
Operators and the Competent Authorities)
nadležnih organa)
Component 5
 Collection of best practices and case studies
of BAT assessment and implementation (1st
Draft)
 Basic contents of Monitoring Plan scheme
 Final report on Selection of IPPC installations
 Analysis of structure and contents of
integrated permits in different MS
Component 6
 Working paper: Approach to EMAS
Global/Third Country scheme in Serbia
This Project is funded
by the European Union
Komponenta 5
 Set najboljih praksi i studija slučaja procene
implementacije Najboljih dostupnih tehnika
(1. nacrt)
 Osnovni sadržaj šeme plana monitoringa
 Finalni izveštaj u vezi selekcije IPPC
postrojenja
 Analiza strukture i sadržaja integrisanih
dozvola u različitim Državama članicama
Komponenta 6
 Radni dokument: Pristup EMAS Global/
Šema zemalja trećeg sveta u Srbiji
Project implemented by Human
Dynamics Consortium
Ressourse utilisation : Upotreba resursa
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Procenat iskorišćenih radnih dana u skladu sa planom u trećem kvartalnom periodu
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Planned usage of working days next Quarter and remaining working days per component:
Planirana upotreba radnih dana u sledećem kvartalnom periodu i preostali radni dani po
komponenti:
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Faktori koji utiču na implementaciju u
Issues that affected implementation
in the reporting period:
•
Procedure for approval of STEs
defined, evaluation of JSTEs lasting
longer than planned (horizontal)
•
IT changes related to activities of
other projects and its analysis in
order to avoid overlaps (Activity 2.10)
•
Since the new systematization is
stable considerations is needed on
the whole component 2.
This Project is funded
by the European Union
periodu izveštavanja:
•
Definisana procedura za odobrenje
kratkoročnih eksperata, evaluacija
mlađih kratkoročnih eksperata je
trajala duže nego što je bilo planirano
(horizontalno)
•
IT promene u vezi sa aktivnostima
drugih projekata i njihova analiza
kako bi se izbegla preklapanja
(Aktivnost 2.10)
•
Budući da je nova sistematizacija
stabilna, neophodno je razmotriti
celokupnu komponentu 2.
Project implemented by Human
Dynamics Consortium
GENERAL OVERVIEW OF
IMPLEMENTATION IN THE
REPORTING PERIOD
OPŠTI PREGLED IMPLEMENTACIJE
U PERIODU IZVEŠTAVANJA
Riccardo Quaggiato – IPPC ekspert
George Mouzakis – Seveso ekspert
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
HORIZONTAL ACTIVITIES
•
Web-site
HORIZONTALNE
AKTIVNOSTI
•Internet stranica
•Projektna dokumenta
Project documents
•Planirani događaji
Scheduled events
Members area
•Članovi sajta
•Vesti
News
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
HORIZONTAL ACTIVITIES
Brief description
of project activities
Info on project team
This Project is funded
by the European Union
HORIZONTALNE
AKTIVNOSTI
Kratak opis
projektnih
aktivnosti
Informacije
o
projektnom
timu
Project implemented by Human
Dynamics Consortium
HORIZONTAL ACTIVITIES
HORIZONTALNE AKTIVNOSTI
Opening Conference
Uvodna konferencija
•
24.05.2013 at Serbian Chamber of Commerce
•
24. 05. 2013. godine u Privrednoj komori Srbije
•
About 100 participants, more than 50 operators
•
100 učesnika, više od 50 operatera
•
Proactive discussion, emerging need for info and
support
•
Proaktivna diskusija, potreba za informacijama i
podrškom
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp 1– Activities 1.1 and 1.2 Komponenta 1– Aktivnosti 1.1 i 1.2
LEGAL GAP ANALYSIS
ANALIZA PRAVNIH NEDOSTATAKA
•
STEs deployment started in
April;
•
Preliminary activities;
•
Analysis of laws
•
Draft methodology
•
•
•
•
•
Draft ToCs for IED and Seveso •
III
This Project is funded
by the European Union
Angažman kratkoročnih eksperata
počeo je u aprilu;
Preliminarne aktivnosti;
Analiza zakona;
Nacrt metodologije
Nacrt Tabela usklađenosti za IED i
Seveso III
Project implemented by Human
Dynamics Consortium
Cmp 1– Activities 1.1 and 1.2 Komponenta 1– Aktivnosti 1.1 i 1.2
ANALIZA PRAVNIH NEDOSTATAKA
LEGAL GAP ANALYSIS
1st
•
•
•
•
1. nacrt Tabele usklađenosti u vezi IEDdraft of ToC on IED:
Direktive o industrijskim emisijama:
•
EU : IED (Poglavlje I-II)
EU: IED (Chapter I-II)
SR : Zakon o IPPC i srodnim
SR: Law on IPPC and connected •
zakonima/podzakonima;
laws/bylaws;
•
Novi elementi obezbeđeni od strane
New elements provided by IED
IED
•
Rezultati koji će biti detaljno
Findings to be detailed by GA
objašnjeni Analizom nedostataka, a
then recommendations
zatim preporuke
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp 1– Activities 1.1 and 1.2 Komponenta 1– Aktivnosti 1.1 i 1.2
ANALIZA PRAVNIH NEDOSTATAKA
LEGAL GAP ANALYSIS
1st draft of ToC on Seveso III:
1. nacrt Tabele o usklađenosti u vezi sa
Seveso III:
•
Analysis of Seveso III Dir.
•
Analiza Seveso III Direktive.
•
Transpozicija odredbi u
•
Transposing provision in the
zakone/podzakone nacionalnog
National legislation
zakonodavstva (MERZ i ostali)
laws/bylaws (MERZ and others)
•
Obaveze EU
•
EU Obligations
•
Komentari u vezi statusa transpozicije
•
Comments on status of
Treba da bude potvrđeno da će Analiza
transposition
pravnih nedostataka biti urađena
uzimanjem u obzir samo Seveso IIIDirektive
To be confirmed that LGA will be
done considering Seveso III Dir. only
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp. 2 – Activity 2.1 DYNAMIC
SWOT ANALYSIS
•
•
Analysis of the findings identified by the
other previous and on going projects, as
well as the current findings, has been
prepared
In the fields of IPPC/IED and Seveso, the
findings are not completely up-to-date due
to the changes implemented in the
intervening period
This Project is funded
by the European Union
Komponenta 2 – Aktivnost 2.1
DINAMIČNA ANALIZA SNAGA,
SLABOSTI, PRILIKA I PRETNJI
(SWOT)
•Pripremljena je analiza rezultata
identifikovanih na prethodnim i tekućim
projektima, kao i sadašnjih rezultata
•Na polju IPPC/IED i Seveso, rezultati nisu u
potpunosti ažurirani zbog promena
implementiranih u periodu delovanja
Project implemented by Human
Dynamics Consortium
Cmp. 2 – Activity 2.1 DYNAMIC
SWOT ANALYSIS
Komponenta 2 – Aktivnost 2.1
DINAMIČNA SWOT ANALIZA
Findings
Rezultata
•
Legal framework (amendments to Law on
Env. Prot. And on IPPC, SEVESO III,
inclusion of water permit into IP…)
•Pravni okvir (izmene Zakona o zaštiti životne
sredine i u vezi IPPC, SEVESO III, uključivanje
dozvole za vodu u IP-Integrisanu dozvolu…)
•
IED (intra/inter-institutional cooperation,
inspector’s role…)
•IED (intra/inter-institucionalna saradnja,
uloga inspektora…)
•
Seveso (implementation of SMS
principles..)
•Seveso (implementacija principa SMSSistema upravljanja bezbednošću…)
•
EMAS Global
•EMAS global
.
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp. 2 – Activity 2.1 DYNAMIC
SWOT ANALYSIS
Komponenta 2 – Aktivnost 2.1
DINAMIČNA SWOT ANALIZA
Previous project and preliminary analysis
have highlighted only weaknesses and
gaps
•Prethodni projekat i preliminarna analiza su
istakli samo slabosti i nedostatke
•
•
•
Lack of identification of Strengths and
Opportunities
Seveso and EMAS have never been
addressed by SWOT analysis
Dynamic SWOT analysis can provide input to
improve further actions (transposition,
implementation, communication…)
•Nedostatak identifikacije snaga/prednosti i
prilika
•Seveso i EMAS nikad nisu bili pokriveni SWOT
analizom
Dinamična SWOT analiza može da obezbedi
inpute kako bi se poboljšale dalje akcije
(transpozicija, implementacija,
komunikacija...)
LONG-TERM FOLLOW UP
This Project is funded
by the European Union
DUGOROČNO PRAĆENJE
.
Project implemented by Human
Dynamics Consortium
Cmp 2– Activity 2.10 IT
SOLUTIONS
-
-
Additional meetings with SEPA: IT
system will be changed (EMC
project)
No significant changes in
strategy confirmed
IT solutions for document
management: necessary better
coordination with other initiatives
This Project is funded
by the European Union
Komponenta 2– Aktivnost
2.10 REŠENJA INFORMATIVNIH
TEHNOLOGIJA
-
Dodatni sastanci sa SEPA
organizacijom: IT sistem će biti
promenjen (EMC projekat)
-
Potvrđeno je da nije bilo značajnih
promena u strategiji
-
IT rešenja za upravljanje
dokumentima: neophodna je bolja
koordinacija sa drugim inicijativama
Project implemented by Human
Dynamics Consortium
Cmp 3 – Activity 3.1
COMMUNICATION
Target groups
-
List of stakeholders
-
Communication channels
-
Flow and direction
This Project is funded
by the European Union
Komponenta 3 – Aktivnost 3.1
KOMUNIKACIJA
Ciljne grupe
-Lista zainteresovanih strana
-Kanali komunikacije
-Protok i pravac
Project implemented by Human
Dynamics Consortium
Cmp 4 – Activity 4.1/4.2
SEVESO
Komponenta 4 – Aktivnost 4.1/4.2
SEVESO
Technical documents prepared during the
reporting period:
A. Preliminary analysis of provisions of
Seveso Directive, required to upgrade
the legal and administrative system
from Seveso II to Seveso III (Roles
and responsibilities of the Operators
and the Competent Authorities).
B. Technical rules for the
implementation of Seveso II Directive
C. Drawing up an External Emergency
Plan.
Tehnička dokumenta pripremljena za vreme
perioda izveštavanja:
This Project is funded
by the European Union
A. Preliminarna analiza odredbi Seveso
Direktive, neophodna za ažuriranje pravnog
i administrativnog sistema od Seveso II do
Seveso III (Uloge i odgovornosti operatera i
nadležnih organa).
B. Tehnička pravila u vezi implementacije
Seveso II Direktive
C. Priprema Eksternog plana u slučaju udesa
Project implemented by Human
Dynamics Consortium
Cmp. 5– Activity 5.1
Komponenta 5– Aktivnost 5.1
BAT implementation
Implementacija Najboljih
dostupnih tehnika
Analysis of approaches/best practices
used in different MS:
Analiza pristupa/najboljih praksi
upotrebljenih u različitim Državama
članicama:
• BREF and translations
•BREF i prevodi
• Opinions of TWGs
• National guidance
• IT tools
• Multicriteria methods
This Project is funded
by the European Union
S
W
O
T
•Mišljenja u vezi sa radnim grupama
•Nacionalne instrukcije
•IT oruđa
•Višekriterijalne metode
S
W
O
T
Project implemented by Human
Dynamics Consortium
Cmp. 5– Activity 5.4
Komponenta 5– Aktivnost 5.4
Monitoring Plans
Planovi u vezi monitoringa
Analysis of basic Monitoring
activities in Integrated Permits:
Analiza osnovnih aktivnosti monitoringa u
integrisanim dozvolama:
•
BREF monitoring principles;
•BREF principi monitoringa
•
Goal: (self)control, efficiency,
compliance promotion
•Cilj: (samo)kontrola, efikasnost, promocija
usaglašenosti
•
What? (emissions, resources, noise,
soil…)
•Šta? (emisije, resursi, buka, zemljište...)
•
How: frequencies, sampling,
methods and standards
This Project is funded
by the European Union
•Kako: učestalost, uzorkovanje, metode i
standardi
Project implemented by Human
Dynamics Consortium
Cmp. 5– Activity 5.6
Komponenta 5– Aktivnost 5.6
Integrated Permits Templates
Obrasci integrisanih dozvola
Structure and contents of IP in
different MS:
Struktura i sadržaj Integrisanih dozvola u
različitim Državama članicama:
•
UK, Ireland, Italy, Spain, Bulgaria,
Austria;
•Velika Britanija, Irska, Italija, Španija,
Bugarska, Austrija;
•
Analysed characteristics: structure,
conditions, monitoring plan
•Analizirane karakteristike: struktura, uslovi,
plan monitoringa
•
Good practices: clear conditions,
plain language, reference to
documents, IT solutions.
•Dobre prakse: jasni uslovi, jednostavan
način izražavanja, IT rešenja
ENFORCEABILITY
This Project is funded
by the European Union
SPROVODLJIVOST
Project implemented by Human
Dynamics Consortium
Cmp. 5– Activity 5.5
Komponenta 5– Aktivnost 5.5.
Selection of IPPC installations
Selekcija IPPC postrojenja
1.
Presence and number of IPPC
installations:
IPPC installations on Republic and Provincial level
IPPC postrojenja na republičkom i pokrajinskom nivou
This Project is funded
by the European Union
1. Rasprostranjenost i broj IPPC
postrojenja
IPPC installations on Local level
IPPC postrojenja na lokalnom nivou
Project implemented by Human
Dynamics Consortium
Cmp. 5– Activity 5.5
Komponenta 5– Aktivnost 5.5
Selection of IPPC installations
Selekcija IPPC postrojenja
2.
2. Kriterijumi evaluacije:
Evaluation criteria:
•
Nr. Of installations
•
Broj postrojenja
•
Relevance (economic impact; complexity of
•
Relevantnost (ekonomski uticaj; kompleksnost
procesa proizvodnje; ekološki uticaj; kompleksnost
izdavanja dozvola)
production process; environmental impact;
complexity of permitting)
3.
Evaluation grid:
Evaluaciona tabela:
Kategorija Broj postrojenja Relevantnost Ukupan iznos
Proizvodnja energije
Proizvodnja i prerada metala
Industrija minerala
Hemijska industrija
Upravljanje otpadom
Ostale aktivnosti
Proizvodnja hrane i pića - Intenzivan uzgoj
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp. 5– Activity 5.5
Komponenta 5– Aktivnost 5.5.
Selection of IPPC installations
Selekcija IPPC postrojenja
4.
4. Procena zahteva (nivo kompletiranosti,
5.
Assessment of applications (level of
completeness, complexity) and state of
operability with MERZ and AP
Selected installations
kompleksnosti) i stanje operativnosti što se tiče
MERZ i AP
5. Selektovana postrojenja
Nacionalni nivo
National level
Provincial level
Local level
IMPOL SERVAL (Sevojno)
Aluminum production
HIPOL ad (Odžaci)
Polypropylene prod
DIJAMANT ad (Zrenjanin)
Oil and derivate production
This Project is funded
by the European Union
IMPOL SERVAL
(Sevojno)
Proizvodnja aluminijuma
HIPOL ad
Pokrajinski nivo
(Odžaci)
Proizvodnja polipropilena
Lokalni nivo
DIJAMANT ad (Zrenjanin)
Proizvodnja ulja
Project implemented by Human
Dynamics Consortium
Cmp. 6 – EMAS
Decision on EMAS Global/Third
Country have been taken and first
steps in approach defined
Output:
First approach to EMAS
Global/Third country scheme
Komponenta 6 – Ekomenadžment i šema provere
(EMAS)
Doneta je odluka u vezi sa EMAS
Global/Zemlje trećeg sveta i
definisani su prvi koraci u pristupu
Rezultati:
Prvi pristup Šemi EMAS
Global/Zemlje trećeg sveta
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
PROJECT PLANNING FOR NEXT
REPORTING PERIOD
PLANOVI PROJEKTA ZA SLEDEĆI
IZVEŠTAJNI PERIOD
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp. 1 – LEGAL ACTIVITIES
Activities 1.1 and 1.2
Finalization of draft ToCs in line with the
comments received by MERZ;
Preparation of draft legal gap analysis report
for IED and SEVESO III;
Komponenta 1 – PRAVNE
AKTIVNOSTI
Aktivnosti 1.1 i 1.2
Finalizacija nacrta Tabele o usklađenosti u skladu sa
komentarima primljenim od strane MERZ;
Priprema nacrta izveštaja Analize pravnih nedostataka za IED i
SEVESO III;
Activity 1.3
Aktivnost 1.3
Draft ToC, legal gap analysis and legislation on
EMAS III Regulation
Nacrt ToC, Analiza pravnih nedostataka i zakonodavstva u vezi
sa EMAS III Uredbom
Milestones:
Final ToCs IED and Seveso III Directive
Legal gap analysis IED and Seveso III Directive
Draft ToC, legal gap analysis and legislation on
EMAS III Regulation
This Project is funded
by the European Union
Glavni rezultati:
Finalna Tabela o usklađenosti u vezi sa IED i SEVESO III
Direktivom
Analiza pravnih nedostataka o IED i SEVESO III Direktivom
Nacrt ToC, Analiza pravnih nedostataka i zakonodavstva u vezi
sa EMAS III Uredbom
Project implemented by Human
Dynamics Consortium
Cmp. 2 – INSTITUTIONAL
STRENGTHENING
Komponenta 2 –
INSTITUCIONALNO JAČANJE
Activity 2.1 – Dynamic SWOT Analysis –
pending approval by the SC
Milestones:
• Aktivnost 2.1 - Dinamična SWOT analizaočekuje se odobrenje od strane
Nadzornog odbora za praćenje projekta
SWOT meeting report,
Glavni rezultati:
Draft and final dynamic SWOT Analysis,
including description of three relevant
areas, main stakeholders and involved
structures, findings and recommendations
(including institutional and administrative
issues and progress monitoring system).
• Izveštaj o SWOT analizi
This Project is funded
by the European Union
•Nacrt i finalna dinamična SWOT analiza,
uključujući opis tri relevantne oblasti,
glavne zainteresovane strane i uključene
strukture, rezultate i preporuke
(uključujući institucionalna i
administrativna pitanja i progres sistema
monitoringa)
Project implemented by Human
Dynamics Consortium
Cmp. 2 – INSTITUTIONAL
STRENGTHENING
Activity 2.2 Preparation of administrative
procedure for IPPC/IED
Komponenta 2 –
INSTITUCIONALNO JAČANJE
Aktivnost 2.2 Priprema administrativne
procedure za IPPC/IED
• 1 WG1/ IPPC/IED meeting.
• Radna grupa 1/IPPC/IED sastanak.
• 1 WG1/ Seveso meetings
• Radna grupa 1/Seveso sastanci
Milestones:
• Draft procedure for IPPC /IED
Glavni rezultati:
• Nacrt procedure za IPPC/IED
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp. 2 – CAPACITY BUILDING
Activity 2.3 TNA
Komponenta 2 – JAČANJE
KAPACITETA
• Preparation of draft TNA and training
programme:
• Institutional organization has
changed and is now steady
• New Directives introduced important
topics
• New tools are being prepared and
introduced by the project
Milestones:
• Draft TNA and training programme
This Project is funded
by the European Union
Aktivnost 2.3 TNA - Analiza potreba za
obukom
•
Priprema nacrta TNA-Analize potreba za obukom
i program obuka
•
Institucionalna organizacija je promenjena i sada je
stabilna
•
Nove direktive su uvedene u vezi važnih tema
•
Nova oruđa se pripremaju i uvode od strane projekta
Glavni rezultati:
• Nacrt TNA i program obuka
Project implemented by Human
Dynamics Consortium
Cmp. 2 – IT SOLUTIONS
Komponenta 2 – REŠENJA
INFORMATIVNIH TEHNOLOGIJA
Activity 2.10
Aktivnost 2.10
• Assessment of existing IT systems for
environmental data management;
•Procena postojećih IT sistema u vezi
upravljanja podacima o životnoj sredini;
• Identification of needs and requirements
for document handling
•Identifikacija potreba i zahteva za
rukovanje dokumentima
Milestones:
Glavni rezultati:
• Preliminary report on assessment of
existing IT solutions
• Preliminarni izveštaj o proceni
postojećih IT rešenja
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp. 3 – COMMUNICATION
Activities
• 3.1 - Contact and activation of target
groups (mailing list);
• 3.2 - List and preparation of promotional
materials;
• 3.3 - Planning of promotional activities on
IED and Seveso
Komponenta 3 –
KOMUNIKACIJA
Aktivnosti
• 3.1-Kontakt i aktivacija ciljnih grupa
(distributivna lista);
• 3.2-Lista i priprema promotivnih
materijala;
• 3.3-Planiranje promotivnih aktivnosti u
vezi IED i Seveso
Glavni rezultati:
Milestones:
• List and design of promotional materials
• List of public debates/meetings
This Project is funded
by the European Union
• Lista i dizajn promotivnih materijala
• Lista u vezi sa javnim
raspravama/sastancima
Project implemented by Human
Dynamics Consortium
Cmp. 4 – SEVESO
Activities 4.1 and 4.2 are expected to be
completed by the end of the quarter (August
2013). The output of these activities is necessary
prerequisite for the start of Activity 4.3.
Milestones:
-
Final Methodology for the selection of
Komponenta 4 – SEVESO
Očekuje se da Aktivnosti 4.1 i 4.2 budu
dovršene do kraja kvartalnog perioda (avgust
2013. godine). Rezultati ovih aktivnosti su
neophodan preduslov za početak Aktivnosti 4.3.
Glavni rezultati:
target Sectors and Target establishments,
-Finalna metodologija za selekciju ciljnih sektora
i postrojenja
-
Three target sectors selected
-Izabrana tri ciljna sektora
-
Three target establishments selected
-Izabrana tri ciljna postrojenja
-
Critical emergency protection zones to be
selected,
-Selekcija kritičnih zona zaštite u slučaju
opasnosti
-
Risk acceptance criteria to be selected.
-Selekcija kriterijuma za prihvatanje rizika.
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp. 5 – IPPC/IED-1
Komponenta 5 – IPPC/IED-1
Activity 5.1
Aktivnost 5.1
• Definition of ToC of BREF User Manual (BAT
assessment approach);
• Definicija Tabele o usklađenosti Priručnika za
korisnike BREF dokumenata (Pristup procene
Najboljih dostupnih tehnika);
Activity 5.3
• Analysis of Serbian legislation on ELVs;
• Identification of criteria to set conditions in
integrated permits.
Aktivnost 5.3
•Analiza srpskog zakonodavstva u vezi ELVGraničnih vrednosti emisija;
•Identifikacija kriterijuma za utvrđivanje uslova
u integrisanim dozvolama.
Milestones:
•
ToC of ‘BREF User Manual’
Glavni rezultati:
•
Analysis of Serbian legislation on ELVs
•Tabela o usklađenosti “Priručnika za korisnike
BREF dokumenata”
•Analiza srpskog zakonodavstva u vezi sa
Graničnim vrednostima emisija
This Project is funded
by the European Union
Project implemented by Human
Dynamics Consortium
Cmp. 5 – IPPC/IED-2
Komponenta 5 – IPPC/IED-2
Activity 5.4
Aktivnost 5.4
• Start drafting Monitoring Plans scheme;
• Početak pripreme nacrta šema planova u vezi
monitoringa;
Activity 5.5
• Start analysis of applications of 3
installations for drafting permit;
Aktivnost 5.5
• Početak analize zahteva 3 postrojenja za pripremu
nacrta dozvole;
Activity 5.6
Aktivnost 5.6
• Preparation of Integrated Permit templates.
• Priprema obrazaca integrisane dozvole.
Glavni rezultati:
Milestones:
•
Report on practical cases about Monitoring
•
Draft of Monitoring Plan scheme
•
1st draft of Integrated Permit Scheme
This Project is funded
by the European Union
•
Izveštaj o praktičnim slučajevima o monitoringu
•
Nacrt šeme plana monitoringa
•
Prvi nacrt šeme o integrisanim dozvolama
Project implemented by Human
Dynamics Consortium
Cmp. 6 – EMAS
Komponenta 6 – EMAS
Activity 6.1
Aktivnost 6.1
• EMAS market analysis;
• Tržišna analiza EMAS;
• Definition of a roadmap for EMAS Global
implementation.
• Definicija razvojnog puta za implementaciju
globalnog EMAS.
Glavni rezultati:
Milestones:
•
Draft of EMAS market analysis
•
Work-plan and priority list of steps to be
implemented
•
Procurement documents for translation of
EMAS regulation
This Project is funded
by the European Union
•
Nacrt tržišne analize EMAS
•
Plan rada i lista prioritetnih koraka koje
treba primeniti
•
Prevod dokumenata o EMAS uredbama
Project implemented by Human
Dynamics Consortium
Related documents
Download