US Army Corps of Engineers
Spill Response at Hydropower Projects
Ken Duncan
Environmental Compliance Coordinator /
Sustainability Program Manager
Operations Division
Technical Operations Branch
Portland District
US Army Corps of Engineers
BUILDING STRONG®
NWD Corps Missions
Navigation
Flood Damage Reduction
Restoring Ecosystems
Hydropower
Wetland / Waterway Regulation
Recreation
PORTLAND DISTRICT
2
BUILDING STRONG®
PORTLAND DISTRICT
3
BUILDING STRONG®
PORTLAND DISTRICT
4
BUILDING STRONG®
Major Oil Sources:
Kaplan Runner
Up to 7,000 gal.
PORTLAND DISTRICT
5
BUILDING STRONG®
Governors (Up to 4000 gallons)
PORTLAND DISTRICT
6
BUILDING STRONG®
Transformers
(Up to 16,000 gallons each)
PORTLAND DISTRICT
7
BUILDING STRONG®
Oil Storage Rooms
(Up to 200,000 gallons per dam)
PORTLAND DISTRICT
8
BUILDING STRONG®
Navigation Locks
PORTLAND DISTRICT
9
BUILDING STRONG®
Navigation Locks
(Up to a 1000 gallons)
PORTLAND DISTRICT
10
BUILDING STRONG®
Surface Flows – Dam Myths
PORTLAND DISTRICT
11
BUILDING STRONG®
Fishways
PORTLAND DISTRICT
12
BUILDING STRONG®
Oil Spill Prevention
Containment Systems
Sumps / Oil Water Separators
SPCC Plans
PORTLAND DISTRICT
13
BUILDING STRONG®
Spill Preparedness
Training
Drills
Partnering w/ EPA, WDOE, DEQ
District IMT support
► Operations,
Planning, Safety, PAO
Contractor Response Using USCG BOAs
PORTLAND DISTRICT
14
BUILDING STRONG®
Spill Response - Reporting
Commanders Intent: “Projects shall report the
potential or known quantity of materials spilled,
as quickly as possible, and update immediately if
information changes.”
Corps policy is to report every spill.
POC at each Project is the Control Room
► Listed
in GRPs
PORTLAND DISTRICT
15
BUILDING STRONG®
Mid-Columbia Challenges
Corps needs to know about spills to protect the
fish ladders
Navigation Locks
Mid-Columbia GRP
PORTLAND DISTRICT
16
BUILDING STRONG®
Questions?
Contact Info:
Ken Duncan
503-808-4323
Kenneth.d.duncan@usace.army.mil
PORTLAND DISTRICT
17
BUILDING STRONG®