9910 Research Drive Irvine, CA 92618 (714) 685-1730 (Phone) (714) 685-1734 (Fax) Email: humphreys@humphreys-assoc.com http://www.humphreys-assoc.com No portion of this material covered by the copyrights hereon may be duplicated, reproduced, distributed, or copied in any form, or by any means - graphic, electronic, or mechanical, including photocopying, recording, taping, printing, or information and retrieval systems without written permission of Humphreys & Associates, Inc. This material is copyrighted by Humphreys & Associates, Inc. 1979 – 2014. Portions of this material are also copyrighted by Arthur Andersen & Co. 1980 - 1981. All rights reserved. ©Humphreys & Associates, Inc. 1979-2014 Gary Humphreys Presentation to The AACE Rattlesnake Mountain (RSM) Section December 02, 2014 ©Humphreys & Associates, Inc. 1979-2014 Planned Versus Actual Accomplishment • NRC Finding (Phase II report): – “DOE does not effectively use available tools, such as earned value management, to track the progress of projects with respect to budget and schedule” • NRC Recommendation: – “DOE should mandate a reporting system that provides the necessary data for each level of management to track and communicate the cost, schedule, and scope of a project” ©Humphreys & Associates, Inc. 1979-2014 8269 Cost DOE Order 413.3B Prime Contractor Requirements • EVM is required on Capital Asset projects with a Total Project Cost > $20 Million • EVM Certification required for projects with TPC => $50M (by DOE subject to thresholds) • EVMS is not discouraged on FFP contracts. A Performance Management System is required • Appropriate requirements will be included in all DOE project acquisition solicitations and contracts ©Humphreys & Associates, Inc. 1979-2014 8272 DOE Office of Acquisition and Project Management ©Humphreys & Associates, Inc. 1979-2014 8272 OAPM Responsibilities • Development and implementation of policies and uniform procedures defining the EVMS compliance process and its components (Root Cause / Corrective Action process) • Where OAPM is the designated Certifying Authority either per DOE O 413.3B $ thresholds or by request of the PMSO, OAPM is responsible for certification and surveillance • Issuance of CARs and CIOs for OAPM-led Reviews • Conduct an assist visit to ensure understanding of final CAR(s), apparent causes, and recommendations • Review and approve the contractor’s CAP, monitoring of the corrective actions in the plan, and final closure verification • Maintaining a Central Repository of EVMS-review related documentation ©Humphreys & Associates, Inc. 1979-2014 8272 DOE Office of Acquisition and Project Management ©Humphreys & Associates, Inc. 1979-2014 OAPM Project Management and Earned Value ©Humphreys & Associates, Inc. 1979-2014 DOE OAPM Focus for FY15: Process Improvement • Sufficiency and skills of EVMS-savvy resources within the DOE: AACE EVP and PSP Certification for staff. • Increase consistency in application, execution, and results think improve contractual language, conduct IBRs, • Enhance PARS data and add/improve data analysis tools, i.e. UN/CEFACT XML schema, • Update/supplement policies and procedures with new SOPs and Handbooks for processes identified in the Strategic Plan as lacking in depth of instruction, e.g. the EVMS Snippets cover many areas where there are no current guidance, • Improve communications at all levels via intranet, training, and the FY15 Road Show (topics yet to be determined). ©Humphreys & Associates, Inc. 1979-2014 8272 AACE Professional Certification • The OAPM is encouraging staff to become Earned Value Professional (EVP) and Planning & Project Scheduling Professional (PSP) certified. • Humphreys & Associates taught Certification Classes to OAPM staff. – Same class taught at WRPS and CH2M Hill here in Richland. • Both EVP & PSP are 120 Questions over 5 hours, including writing a “Memo”; EVP has Schedule Network Calculations. • Over 1,000 Active PSP and 460 EVP Certifications. ©Humphreys & Associates, Inc. 1979-2014 EV Training Snippets Perspective • 34 Snippets covering a range of EV topics – Collection of training, provided in small parts, to provide information on various EVMS-related topics – Presented in a computer-based training (CBT) environment – Accessible 24/7 ◦ PARS II SharePoint platform: DOE employees and contractors – https://pars2e.doe.gov ◦ PowerPedia: DOE employees only – https://powerpedia.energy.gov/wiki/Earned_Value_Management_System ◦ EFCOG Snippets Library: – http://www.efcog.org/wg/pm_evmssg/EVMS_Snippets.htm 11 ©Humphreys & Associates, Inc. 1979-2014 EV Training Snippet Library • 1.0 DOE Reviews – O 413.3 EVM Requirements – EVMS Review Approach – EVMS Stage 1 Surveillance – EVMS Stage 2 Surveillance – EVMS Stage 3 Surveillance – EVMS Review for Cause – EVMS Certification – Common EVMS Findings ©Humphreys & Associates, Inc. 1979-2014 • 2.0 EV Reporting: – CPR/IPMR Purpose and Use – CPR/IPMR FPD Quick Check – IPMR Data Item Description – CFSR Overview & Reconciliation with IPMR/CPR • 3.0 Schedules – – – – IMS Initial Baseline Review IMS Monthly Review Scheduled Health Metrics Guidance & Resources 12 EV Training Snippet Library (cont.) • 4.0 Advance Topics • 5.0 PARSII Analysis – OTB/OTS Implementation Reports – Budget vs. Funds / MR vs. – Reports Overview Contingency – Data Validity Reports – Undistributed Budget – Schedule Health Assessment – Authorized Unpriced Work Reports – Baseline Control Methods – Variance Analysis Reports – FFP Subcontracting and Prime EVM – Trend Reports – CAM Roles and – EAC Reasonableness and Surveillance Independent EAC – High Level EVM – OAPM Monthly Report expectations • 6.0 Predictive Analysis – Integrated Baseline Reviews – Predictive Analysis Methods – Applied Predictive Analysis ©Humphreys & Associates, Inc. 1979-2014 13 Snippets Example ©Humphreys & Associates, Inc. 1979-2014 14 Project Assessment and Reporting System (PARS II) • Part of the Department’s project reform initiative that was launched in June 1999 • A project management tracking and control system established to meet CFO’s office directive of December 2000 • A web-enabled, standardized & centralized reporting system • Senior Executive tool for communicating project status • Overseen by the Office of Acquisition and Project Management (OAPM) ©Humphreys & Associates, Inc. 1979-2014 8274 PARS II Data Requirements Project Identification Table Funding Profile TEC & TPC Earned Value BCWS Critical Decisions Milestones Baseline Changes Planned Planned Description Actual Actual Date Approvals Status BCWP Appropriations Funding ACWP Management Reserve Narratives Data Update Frequency Initially Monthly Annually As Required ©Humphreys & Associates, Inc. 1979-2014 8275 Major System Project Status Report PROJECT FEDERAL PROJECT MANAGER LOCATION TYPE OF PROJECT TOTAL COST START ($M) (CD0) PLANNED FINISH (CD4) CPI SPI STATUS as of date ENVIRONMENTAL MANAGEMENT (W) Salt Waste Processing Project Depleted Uranium Hexafluoride, VL High-Level Waste Removal from Filled Waste Tanks (W) Spent Nuclear Fuels (K-Basins) Tank Waste Treatment/Imobilization Plant Savannah River Paducah Savannah River Hanford Hanford Terrel J. Spears Dennis Boggs Seaward Middleton n/p W.J. Taylor System Plant Plant Plant Plant 1000.0 1100.0 1551.0 1710.0 4400.0 06/01 12/00 09/90 n/p 09/95 n/p n/a n/p n/a 09/01 1.00 n/p n/p 05/07 n/p n/a new start n/a new start 1.00 n/p 1 n/p 01/02 11/01 01/02 NATIONAL NUCLEAR SECURITY ADMINISTRATION Immobilization and Associated Processing Facility Microsystems and Engineering Sciences Applications Terascale Simulation Facility Strategic Computing Complex Dual Axis Radiographic Hydrodynamic Test Facility Stockpile Management Restructuring Initiative, KC Tritium Extraction Facility (W) National Ignition Facility CMR Replacement Mixed Oxide Fuel Fabrication Facility Pit Disassembly and Conversion Facility Savannah River Sandia Livermore Los Alamos Los Alamos Kansas City Savannah River Livermore Los Alamos Savannah River Savannah River B. Danker Jeannette Norte Samuel Brinker Mike Mulford Robert Hamby Curtis Roth Mike Hickman Scott Samuelson Herman LeDoux B. Danker D. Peko Plant Fac Const Fac Const Fac Const System Fac Const System System Fac Const Plant Plant n/p 47.4 92.1 106.5 269.8 141.4 401.0 2248.1 450.0 n/a n/a 10/97 07/99 n/p n/p 10/87 04/96 07/01 01/93 n/a 10/97 03/97 n/p n/p 03/06 03/02 03/03 04/05 02/06 09/08 n/a 09/06 n/a n/a 1.21 1.00 1.07 1.00 1.09 0.97 1.01 1.08 n/a n/a n/a 0.90 0.89 1.01 0.97 1.03 0.93 0.99 1.00 n/a n/a 09/01 10/01 11/01 11/01 11/01 11/01 11/01 12/01 11/01 09/01 09/01 RADIOACTIVE WASTE Civilian Radioactive Waste Management (RW) Yucca Mtn Russell Dyer System 6961.0 07/83 n/p 1.02 0.96 NUCLEAR ENERGY (W) Isotope Production Facility Accelerator Driven Test Facility (NE) LANL LANL Won Yoon John Herczeg System System 23.14 n/a n/p 10/01 n/p n/a SCIENCE (W) Neutrinos at the Main Injector Spallation Neutron Source Fermi Oak Ridge Ron Lutha Lester Price System System 136.10 1411.7 02/99 08/96 n/p n/a 09/03 1.04 06/06 1.01 on hold new start new start new start 10/01 4 11/01 n/p 2 n/a new start 09/01 09/01 0.79 0.93 3 12/01 01/02 CPI - Cost Performance Index (>1 - Favorable, <1 Unfavorable), SPI - Schedule Performance Index (>1 - Favorable, <1 Unfavorable) Green - Project is within Acquisition Performance Baseline (APB) (TPC, schedule, capability) Status has changed red to yellow or yellow to green As of date - Date of latest report n/p - data not in PARS ©Humphreys & Associates, Inc. 1979-2014 Yellow - Project has one or more significant issues which threaten to cause an APB breach or could cause a significant impact to the Red - Project has breached the APB in cost or schedule or capability project No change in status n/a - data not available Status has changed from green to yellow or yellow to red from the previous report n/r - not required W - indicates a Watch List project 8276 PARS II Performance Presentations Favorable Schedule Performance Unfavorable Cost Performance Favorable Schedule Performance Favorable Cost Performance SPI 1.85 1.6 1.35 1.1 CPI CPI 0.1 0.35 0.6 0.85 1.1 1.35 1.6 1.85 0.85 0.6 0.35 Unfavorable Schedule Performance Unfavorable Cost Performance 0.1 SPI Unfavorable Schedule Performance Favorable Cost Performance CPI/SPI Distribution (All Projects) ©Humphreys & Associates, Inc. 1979-2014 8277 Visit the DOE EVM Website EVM & Project Analysis Procedure DOE EVM Gold Card Guideline Assessment Template IPMR DID EVM Surveillance Procedure EVM Risk Matrix DOE 413.3-10A Guide ©Humphreys & Associates, Inc. 1979-2014 WBS Handbook 19