multiconsult.no Om forskningsaktiviteter og funn så langt Workshop next 2014, Multiconsult Oslo Svein Bjørberg multiconsult.no Agenda • Literature review • Definitions • Oscar Model • Determination of cases (selection criteria) • Case study template • Research assistance NTNU • Student works • Internal workshops • Coming activities 2 multiconsult.no PROJECT PHASES I. Phase – Different characteristics, means and cases, March 2015 II. Phase – In depth analysis, classification, modelling, October /December 2015 III. Phase – Testing on cases/ March 2016 IV. Phase – End Report, March / June 2016 3 multiconsult.no DIFFERENT PERSPECTIVES WP2 ECONOMIC ECONOMIC INCENTIVES SOCIAL People and Organization KNOWLEDGE ENVIRONMENTAL CONTRACT PHYSICAL Space and Infrastructure PROCESSES AND ASSURANCE QUALITY ORGANIZATION OPERATION SERVICES CHARACTERISTICS WP1 VALUE CREATION 4 multiconsult.no DIFFERENT PERSPECTIVES – WP1 CHARACTERISTICS VALUE CREATION ECONOMIC Life cycle costs (MOME), financial situation (interest), market, rent costs, space efficiency, interaction of costs, green accounting … SOCIAL People and Organization Usability, Esthetic and Architectural values, Location characteristics, Indoor climate / Comfort, Culture values, Logistics service support … ENVIRONMENTAL Renewable energy, Energy efficiency, Environment-friendly materials, Waste management, Energy class … PHYSICAL Space and Infrastructure Technical condition (need for maintenance / technical upgrading), Material quality, Adaptability (flexibility, generality and elasticity), Architectural solutions, Sufficient infrastructure, Accessibility, Space efficiency, Long term solutions … 5 multiconsult.no DIFFERENT PERSPECTIVES – WP2 VALUE CREATION ECONOMIC INCENTIVES Good planner and good management, Changing regulation, New demands from society, Social awareness, User satisfaction, Communication ability, Creating value with society /user… KNOWLEDGE Contract process with dialogue, Contract division, Selection and award criteria, Contracting plan, Clear tasks and definitions, Allocation of responsibility and risks… CONTRACT Process management ability, Political support, User participation, Using value metrics, Performance requirements for each phase, Mechanisms and procedures for ex-ante and ex-post evaluations… PROCESSES AND ASSURANCE QUALITY ORGANIZATION OPERATION SERVICES Environmental funds, Financial supports for testing new trends, Branding, Rewarding, Cost productivity orientation, Changing the energy consumption, Tax reduction… 6 multiconsult.no HUMAN RESOURCES PROJECT PARTICIPANTS • ACTIVITIES • DEFINITIONS • WORKSHOPS • DEVELOPING THE TEMPLATES NTNU, HiOA U KARLSRUHE EFL, ESLG STUDENTS B • LITERATURE REVIEW • SURVEY • MASTER THESIS C • CASE STUDY 1 • CASE STUDY 2 •… • TESTING THE FINAL MODELS A EXPERTS 7 multiconsult.no ACTIVITIES Theoretical & Practical background Survey Case studies Literature Review Interviews (scientific papers, evidence based documents…) 8 multiconsult.no DIFFERENT STAKEHOLDERS (Ulike interessenter) OWNER (Eier) PUBLIC (Offentlige) PRIVATE (Private) PLANNERS / DESIGNERS (Planleggere/ Designere) CONTRACTORS (Entreprenører og leverandører) FM PROVIDERS (FM- Lev.) USER (Brukere) SOCIETY (Samfunnet) CONSTRUCTION COMPANIES (Entreprenører) SERVICE COMPANIES (FM-leverandører) EMPLOYEE (Ansatte) BUILDING AUTHORITIES (Planmyndighetene) LANDSCAPE ARCHITECTS (Landskapsarkitekter) SUB CONTRACTOR (Underentreprenører) SINGLE PURPOSE COMPANIES (Leverandører av enkelttjenester) CLIENT (Kunder) PUBLIC AUTHORITIES (Politiske myndigheter) CONSULTANTS (Rådgivere) SUPPLIERS (Leverandører) VISITORS (Besøkende) THE NORWEGIAN LABOUR INSPECTION AUTHORITY (Arbeidstilsynet) ARCHITECTS (Arkitekt) URBAN DESIGNER (Byutviklere) PATIENT (Pasient) INTERIOR ARCHITECTS/ WORK PLACE DESIGNERS (Interiørarkitekt/ arbeidsplassutforming) STUDENT (Student/ Elever) TENANT (Leietaker) … … … … … … 9 multiconsult.no Literature study 10 multiconsult.no Example ValPro 11 multiconsult.no Definitions (extraction from literature study) 12 multiconsult.no Literature study 13 multiconsult.no Norwegian definitions 14 multiconsult.no Oscar Model – Basic Mind Map Value for user and owner Value contribution Planners, architects, consultants, contractors, deliveries, facility management, service providers 15 multiconsult.no Oscar Model - Value creation model . CHARACTERISTICS (WP1 - Early phase planning) STRATEGY MEANS (WP2) D C O ECONOMIC INCENTIVES SOCIAL (People and Organization) EPP ENVIRONMENTAL D C O KNOWLEDGE EPP C O PROCESSES AND QUALITY ASSURANCE EPP D C O USER PHYSICAL (Space Infrastructure) D Maximizing value for owner and user over time EPP OWNER CONTRACT ECONOMIC WP3 – TOOLS AND METHODS 16 multiconsult.no Case to typer 1. Case vi høster erfaringer fra (dokumentsstudier, intervjuer, befaringer) 1. Erfaringer: case som er «i front» innen enkelte områder, eller motsatt – der man kan lære av feil/manglende måloppnåelse etc. 2. Case vi aktivt tar en rolle i og følger, evt. påvirker gjennomføringen av (typisk pågående prosjekt der partnerne er involvert) 1. Følge-case: krever gjerne mer ressurser og må følge prosjektet over tid. Dette bør være case partnerne selv er aktive deltakere i, slik at forskningsarbeidet kan inngå som en naturlig del av daglige oppgaver – og være et positivt bidrag for partner og prosjektet. Tenk vinn-vinn! 17 multiconsult.no Determination of cases (selection criteria) 18 multiconsult.no Determination of cases (selection criteria) 19 multiconsult.no Templates • Case study template • Questionnaire - http://goo.gl/forms/nxkgzd4KoD 20 multiconsult.no 21 multiconsult.no Questionnaire 22 multiconsult.no Project partners • • • • Topic 1 Topic 2 Topic 3 … WG3 • Topic 1 • Topic 2 • Topic 3 • Topic 4 • Topic 5 •… WG2 WG1 Student work • • • • Topic 1 Topic 2 Topic 3 … 23 multiconsult.no STUDENT WORK UNIVERSITY FACULTY STUDENT NAME SUPERVISOR NAME Other Research Funds NTNU Norway QIDI JIANG Marit Støre Valen Svein Bjørberg NTNU – Research assistance for the period (one semester) Master thesis – to be defined SURVEY (October – December) 1. Phase – Preparing the Survey out of Case study template 2. Phase – Distributing it and collecting the results 3. Phase – Evaluating the results 24 multiconsult.no STUDENT WORK UNIVERSITY FACULTY STUDENT NAME SUPERVISOR NAME THEME – master and doctoral thesis NTNU Norway AMIN HADDADI Olav Torp Anne Kathrine Larsen Value analysis and value management ESLG Kosovo BESNIK VRELLA Svein Bjørberg Service Level Agreement – a tool to ensure the quality of FM delivery VETIOLA RECICA Antje Junghans How is the Integrated FM role practiced among public an private owners ALBANA GJONBALAJ Marit Støre Valen Condition analyses and other KPIs as strategic basis for decision making EFL Slovenia IRENA VRTARIC Alenka Temeljotov Salaj, Svein Bjørberg Green PPP model for the delivery of education infrastructure in Norway and Slovenia by incorporating international experiences NTNU 2-3 Master thesis To be defined 25 multiconsult.no Workshops • Partner group - WS1 20th of February - WS2 17th of June - WS3 31st of October • Internal (smaller groups) - WSI1 24th of September (KS, ØMF, UiA, MC) - WSI2 29th of October (MC departments) • Meetings - Different meetings with possible new partners 26 multiconsult.no Coming activities • Testing and improving templates - Next week: internal by MC and NTNU • Interviews and Survey, collecting information - Case study Partners (use your employees and partners in the case!!) » MC gives instructions on how to do - Questionnaire Trondheim area “all over” through organizations (RIF, NBEF +++) • Conference - 28th of November: Invited conference from breakfast to lunch 27 multiconsult.no Takk for innspill fra dere, og takk for meg ICEconsult Hospitalitet NN Eiendomsutvikler 28