Systems Integration Design with Enterprise Architect

advertisement
Prepared by:
Gerald R. Gray, Guiding Principle Consulting
Agenda
EA Strengths/Weaknesses
 Pre-requisites
 Gridwise Architecture Interoperability
Framework
 Creating common systems integration
diagrams

Guiding Principle Consulting - CIM Users Group - San Francisco
2
EA Uses and Benefits

Supports IT system, software, and business processes

Models, designs, builds, and tests software

Uses standard Unified Modeling Language (UML)

Can be used to create:
 Business Process Models, Class diagrams, and software
artifacts

Central repository for process and IT system
information

Built-in support for version control e.g. Subversion

Fast, built-in or custom document generation & HTML
Guiding Principle Consulting - CIM Users Group - San Francisco
3
EA Weaknesses

May be a poor choice for complex system
diagrams
 Visio is “prettier”
 PowerPoint also an option

Complex User Interface
 Extensive feature set may lead to confusion
 Time saving “tricks” difficult to learn

Diagrams not useful if team doesn’t see value
 UML/BPM may be used currently at their site
 Some users intimidated by tool
Guiding Principle Consulting - CIM Users Group - San Francisco
4
Pre-requisites

Sparx Enterprise Architect
 http://www.sparxsystems.com.au/
 Version 8 recently released
 $135 - $699 depending on version
Guiding Principle Consulting - CIM Users Group - San Francisco
5
Following the GWAC Stack
Use Case
 Business Process
 Integration
Requirements
 Message Payloads

Adapted from Gridwise Architecture Council
Interoperability Framework
Guiding Principle Consulting - CIM Users Group - San Francisco
6
Common Systems Integration
Diagrams
Use Case diagrams
 Business Activity Diagrams

 Integration Requirements

Sequence Diagrams
Guiding Principle Consulting - CIM Users Group - San Francisco
7
Adding a Use Case

Project Browser
 New Package
 New Diagram – Use Case
 In the workspace add
○ Actors, cases, associations
Guiding Principle Consulting - CIM Users Group - San Francisco
8
Adding a Business Process

Project Browser
 Add New Package
 New Diagram – Activity
 Open workspace, right-click for Swimlanes
and Matrix…
 Add swimlanes
 Add Activity and flows
Guiding Principle Consulting - CIM Users Group - San Francisco
9
Integrations Requirements

Addition to the Activity diagram
 Alignment of business user and the
architect/software team
 Object flow between two activities, typically
spanning actors (swimlanes)
 Add requirement (from common tools)
○ Add Integration to Type
○ Use object node to identify service
Guiding Principle Consulting - CIM Users Group - San Francisco
10
Adding Sequence Diagram

Project Browser
 Add New Package
 New Diagram - Sequence diagram

Open workspace
 Add Actors
 Add flows (asynchronous)
 Add returns (“Is Return” checkbox)
 Service naming based on IEC 61968-1-2
Guiding Principle Consulting - CIM Users Group - San Francisco
11
Reference
 EA Free
Trial
 http://www.sparxsystems.com/products/ea/trial.h
tml

Subversion Documentation
 http://svnbook.red-bean.com/en/1.5/index.html

EA Tutorials and Online Help
 http://www.sparxsystems.com/resources/index.h
tml
Guiding Principle Consulting - CIM Users Group - San Francisco
12
Questions?

Contact:
 gerald.gray@guiding-principle.com