Shipboard instrumentation and systems calibration

advertisement
SHIPBOARD INSTRUMENTATION AND SYSTEMS
CALIBRATION
(SISCAL)
DAVE YOUNG
SISCAL INTRODUCTION Mar 09
REV2
1
PROGRAM
•
SISCAL: Shipboard Instrumentation and Systems Calibration
– NOT “SYSCAL”
•
Policies and Responsibilities
–
–
–
–
–
•
OPNAVINST 3960.16
NAVSEAINST 4734.1B
GYD-10
JFMM
NAVAIR 17-35QAL-15 (AIMD’s)
Engineered Calibration Workload Document
– RCM-Based
– Maintained by SSES
•
Philosophy and Methodology Applicable to Surface Ships, Carriers,
Submarines
SISCAL INTRODUCTION Mar 09
REV2
2
POLICY
• Policies and Responsibilities
– OPNAVINST 3960.16
– NAVSEAINST 4734.1B
• Assigns policy and responsibility for Shipboard Instrumentation and Systems
Calibration (SISCAL) Program. NAVSEA 04RM is the Calibration Technical
Authority for Installed Instrumentation
• SISCAL Engineering Agent: NSWCCD-SSES 953
• Responsibilities
– NAVSEA 04, SISCAL EA, PEOs, FFC
• CRL is the AuthoratativeTechnical Document for installed instruments
– JFMM Vol VI, Chapter 9
• Responsibilities
– TYCOM, refers to QAL-15 (AIMD)
– NAVAIR 17-35QAL-15 Chapter 4
• Responsibilities
– CO, EO, RO and AIMD
SISCAL INTRODUCTION Mar 09
REV2
3
Why 2 Calibration programs?
METCAL
•
•
•
•
•
•
•
SISCAL
TMDE
Portable
Component-Based
Single Interval
Emphasis - Work Ashore
Cal in Lab
ICPs
– Mfr/Model Specific
– Lab Oriented
• EA = NSWC Corona
•
•
•
•
•
•
•
Instrumentation
Installed
Application-Based
Multiple Intervals
Emphasis - Work Afloat
Cal in Place Aboard Ship
MRCs & SCPs
– Application Specific
– In Situ Oriented
• EA = NSWCCD-SSES
SISCAL INTRODUCTION Mar 09
REV2
4
WHAT IS SISCAL?
• For Installed Instrumentation, a means to determine:
–
–
–
–
–
–
who should calibrate (maintenance level),
what should be used to calibrate (Cal Standards/equipment),
how often calibration should be accomplished (interval),
where it should be calibrated (on site),
why it should be calibrated (criticality analysis)
how it should be calibrated (procedure)
• Issue Calibration Requirements Lists (CRLs) for Every
Hull
– Documents Technical Requirements for all installed NAVSEA COG
instruments. Excluded are those instruments covered by Reactor plant
Manual or SSP instructions.
SISCAL INTRODUCTION Mar 09
REV2
5
SISCAL PROCESS
SISCAL INTRODUCTION Mar 09
REV2
6
WHY IS IT CALIBRATED?
• Decision Logic Module (DLM) Process
– Safety/Regulatory/Operational Factors
– Criticality and RCM Analysis
• Calibrate only those instruments that require calibration
• Documents for this analysis are limited to NSTMs, safety bulletins,
NAVOSH manual, regulatory requirements
• Maintenance, assessment, testing and/or troubleshooting
documents are not to be included
• Engineering Agent (EA)
– NSWCCD-SSES 953
• Participants
– Equipment ISEAs
– Fleet
SISCAL INTRODUCTION Mar 09
REV2
7
WHEN IS IT CALIBRATED?
• Scheduled Per SISCAL Periodicity
– RCM Methodology Based
– Functional Impact Assessed
• SISCALMER/Fleet Feedback/ISEA Feedback/Etc.
• Adjusted Intervals (EXCALIBUR SECNAV)
– Gages (24-36 months)
– Bimetallic Thermometers (36-48 months)
– Remote Thermometers (12-36 months)
– Age Explored
SISCAL INTRODUCTION Mar 09
REV2
8
WHERE IS IT CALIBRATED?
• ON-SITE / IN-PLACE
• Eliminates “Damage Potential”
• Removal, Transportation and Installation
•
•
•
•
Minimizes System Downtime
Reduces Tag-Outs
Reduces Sailor Workload
Uses Shipboard Calibration Procedures
SISCAL INTRODUCTION Mar 09
REV2
9
HOW / WHAT / WHO
CALIBRATES?
•
Stand alone Instrumentation
(Gages/Thermometers/Switches)
– Ship’s SGCP FCA or Ship’s AIMD (Cal Activity 1)
• On-Site
– Maintenance Requirement Cards (MRCs)
•
Machinery Control Systems
(Transducers/RTDs/Panel Meters/Etc.)
– SISCAL Team (Cal Activity 2)
• On-Site
– System Calibration Procedures (SCPs)
•
Unique Cal Support Requirements
(Flowmeters/Accelerometers/Vibration Transducers/Magnahelic Gages, etc....)
– FMA/RCCs (Cal Activity 3)
• Off Site/Ashore
– METCAL ICPs
SISCAL INTRODUCTION Mar 09
REV2
10
CALIBRATION REQUIREMENTS LIST
•
•
Calibration Technical Authority Document for Installed
Instrumentation per NAVSEAINST 4734.1B
Identifies:
–
Instrument Configuration (Unique Reference Number)
•
•
•
•
•
–
–
System, Function
Location (deck-frame-space-compartment), Level, Compartment Name (alphabetical)
Nomenclature
Model, Range
Inst No
Calibration Requirements (Y or N)
Calibration Support Documentation (CSD)
•
•
•
•
Procedures
Intervals
Activity
On Site
SISCAL INTRODUCTION Mar 09
REV2
11
CRL SNAPSHOT (TM CD)
SISCAL INTRODUCTION Mar 09
REV2
12
CRL SNAPSHOT (TM CD)
SISCAL INTRODUCTION Mar 09
REV2
13
CALIBRATION
REQUIREMENTS LIST
• Inventory
– Initial Measure Inventories on New Construction Ships
– Installed Instrumentation Configuration Review (IICR)
• Accomplish during construction
• CRL published w/in 90 days of delivery
• Data Available Electronically, Download to Excel, Word, etc.
– User’s Guide
– “What’s New” File
– Update Buttons, Comparisons of Current versus Last CRL CD
• Additions, Deletions
• Changes to Data
– PMS Links in CRL Records
– Form View versus Datasheet View
SISCAL INTRODUCTION Mar 09
REV2
14
CRL TMDER
• TMDER
–QAL-15 Par 4.3.3, .3.4, 4.3.5
• Responsibility for submitting and receiving
• AIR Process:
– Each department submit TMDER to LSC or MSC
– CNAF N432 reviews and submits to NSDSA
• SURF Process:
– Brokered by Port Heuneme
–Submit copy via E-mail to SISCAL if possible
SISCAL.NSWCCD.FCT@NAVY.MIL
SISCAL INTRODUCTION Mar 09
REV2
15
WHAT ARE WE DOING TO REDUCE
WORKLOAD?
• Decision Logic Module (DLM)
– new Rev 12
– Applying Criticality Analysis and RCM to Calibrate Only Those
Instruments That Require Calibration
• Evaluating Calibration Interval Extensions
– Age Exploration based upon function
• Improved Cal Standards
– Portable Pressure Calibrator
– Multi-Function Calibrator
• Instrument-Specific Procedures in PMS
– Better Information to Accomplish the Job
• Streamlining Cal Procedures
– Restrict Calibration to System Operating Range
SISCAL INTRODUCTION Mar 09
REV2
16
Calibration Procedures
•
Cal Activity 1 PMS
–
–
–
Organizational Level (SGCP FCAs/AIMDs)
Gages/Thermometers/Switches/Switchboard meters
9802 MIP Series
•
–
System MIPs and MRCs
•
•
–
Currently 4992 MRCs
System, function, range specific
‘H’ Code MRCs on MIP
•
•
Currently 9 MIPs with 63 MRCs
PMSMIS ISEA 100 Designates as SSES 953 SISCAL responsibility
Cal Activity 3 ICPs
–
–
FMA (Unique Cal Support Requirements)
Flowmeters, Magnehelic Gages
•
•
Laboratory Facilities
NAVAIRs
SISCAL INTRODUCTION Mar 09
REV2
17
Calibration Procedures
•
•
Cal Activity 2 System Calibration Procedures
Machinery Control Systems
–
SISCAL Team only
•
•
•
–
Coordinate with RMC
•
–
No AIMD per QAL-15
No Contractor Companies
Only SSES certifies teams
Submit 2-kilo requesting visit
Instruments that are not standalone
•
•
Pressure transducers, RTD, thermistors, thermocouples,
tachometers, magnetic pickups, TLI radar sensor, signal
conditioners, PLC Modules, panel meters, digital display
System loop calibration
SISCAL INTRODUCTION Mar 09
REV2
18
Calibration Procedures
•
CVN68 Class TM ST700-EG-PRO-010
–
Under development
•
Currently developed/validated
–
–
–
–
•
AC Plants HFC-236
ICAS/Smart Carrier CVN70, 72, 73, 74 and 75
MACHALT 501 Installation, SSAC Cap 12 and O2N2
Compressors Cap 16
TLI Receivers, certain systems
Current designation as TBD in CRL
–
–
–
–
TLI Radar Sensors, ongoing development fleet wide
EDG Temperature Panel, 1TM panel etc…
PMS312 funded
» CD N6554000292 TBDs
Development/Validation ongoing
SISCAL INTRODUCTION Mar 09
REV2
19
MEASURE
• CRL versus Measure Comparison Program
–PMS 312 funded development of CRL to
Measure Comparison program
• Program tailored for ships force use with
MEASURE MIQ and CRL
• Uses Access database
SISCAL INTRODUCTION Mar 09
REV2
20
PMS vs. MIQ
• PMS VERSUS MIQ:
– PMS for Engineering, Weapons, Operations, etc..
• System MRC Contains Test Points/ Tolerances Or Set/Reset
Point/Tolerances For Instrument
• CRL Fields: System MIP And System MRC (MRCs To Be Changed
To R Periodicity From A-16r)
• Not All Instruments Have System MIPs/MRCs. Still In Process Of
Development.
–
May use TFBR Process for changes. CRL will change at the same
time.
• Uses SKED To ‘Take Credit’
– MIQ For AIMD Cal Lab
• Uses 9802 MIP Series Per COMNAVAIRSYSCOM Msg 081825z
Jun 05
• CRL Fields Cal Document, Cal Procedure, Cal Activity, Periodicity,
On Site
• Uses MIQ To ‘Take Credit’
SISCAL INTRODUCTION Mar 09
REV2
21
SISCAL POINTS OF CONTACT
•
NSWCCD-SSES 953
–
–
•
Ed Gormley
(215) 897-1234
SISCAL.NSWCCD.FCT@navy.mil
NAVSEA
–
Mr. K. Pandit SEA 04RM3
•
–
TWH
Mr. D. Young SEA 04RM32
•
(202) 781-1783
(202) 781-1814
SISCAL program manager
SISCAL INTRODUCTION Mar 09
REV2
22