Online Inventory System TAX-AIDE TAX-AIDE 2014 SMT/TCS Training - Dallas 1 Online Inventory System ● GraceWorkz, LLC online inventory system vendor ● Asset Management System for AARP owned and donated equipment Computers Printers Projectors TAX-AIDE 2014 SMT/TCS Training - Dallas 2 Online Inventory System Requirements ● Ease of Use ● Upload of current inventory data ● Validate the assets for which Volunteers are responsible ● Make any necessary changes to asset location and status ● Add new assets that have been acquired locally TAX-AIDE 2014 SMT/TCS Training - Dallas 3 Online Inventory System Requirements (cont’d) ● Modified data to be displayed restricted to Split state or district as a function of user sign in ● Controlled data entry forms ● Approval process for changes, deletion or additions ● Reporting Capabilities TAX-AIDE 2014 SMT/TCS Training - Dallas 4 Online Inventory System Status ● Completed Requirements Development and Documentation System design and creation Prototype Design Testing (NTC) Prototype Design Review (NLT) TAX-AIDE 2014 SMT/TCS Training - Dallas 5 Online Inventory System Functionality Overview ● Search ● Edit and Change records ● Create New Record ● Review and Approve Changes TAX-AIDE 2014 SMT/TCS Training - Dallas 6 Online Inventory System Functionality Overview (cont’d) ● Help function ● Five additional special information fields for split-state/local use ● Reporting ● Direct access from Volunteer Portal ● Printer, Projector, other asset management and reporting TAX-AIDE 2014 SMT/TCS Training - Dallas 7 Access to Online Inventory System ● Three levels of access Level 1 Admin (National Office, NTC members) Super User Level 2 (TCS and one backup) For split state only will be able to view, edit, modify existing data records, create new asset records, delete existing records , and approve all changes, creation or deletion of asset records. TAX-AIDE 2014 SMT/TCS Training - Dallas 8 Access to Online Inventory System (cont’d) Level 3 (DC) For split State only will be able to view, edit, modify existing data records, create new asset records, delete existing records . All changes, creation or deletion of asset records will need to be approved by Level 2. Level 4 (RC) Read Only *System Demonstration* TAX-AIDE 2014 SMT/TCS Training - Dallas 9 Online Inventory System – Next Steps ● Beta Test to begin in September TCS invitation only from NTC Beta testers will do complete inventory cycle using the online system Beta test ends May 30, 2015 ● Planned Production September 2015 TAX-AIDE 2014 SMT/TCS Training - Dallas 10 Online Inventory System Questions???????? TAX-AIDE 2014 SMT/TCS Training - Dallas 11