Contractor Task List Notification

advertisement
Contractor Task List (CTL) Update
OQNOT012
8/29/14
—1—
Objectives
By the end of this module, you will be able to describe:
• What’s changed between the current CTL and the updated CTL.
• The timetable for phase-in of the updated CTL.
• Where to get additional information about the CTL update.
8/29/14
—2—
Background
• In 1999 PHMSA implemented regulations requiring OQ evaluations
for all personnel (company & contractors) when performing a
covered task.
• In 2000 BP/USPL developed a contractor task list to satisfy
regulatory requirements.
• The current Contractor Task List (CTL) contains 140 tasks and uses
3 primary third party OQ providers (OQSG, NCCER and NACE)
• Over the past 14 years regulatory expectations relating to OQ have
evolved and industry has reacted (for example API RP 1161)
8/29/14
—3—
Why Change?
Primary reasons for changing the CTL include:
• To better align with current regulatory and industry expectations and
best practice.
• Improve linkage of tasks to third party provider’s curriculum.
• Improve task definition.
• Align numbering convention with API RP 1161 when practicable.
8/29/14
—4—
When Is The Change Effective?
• The new CTL shall be used with all new USPL projects starting
1/1/2015 and thereafter.
• Ongoing USPL projects which have a projected completion date
before 1/1/2015 (meaning all project contractor OQ task activities
have been completed) may continue without imposing the new CTL
requirements.
• As of 1/1/2015 any USPL projects in progress (that require
ongoing/new OQ task work) will be required to utilize the new CTL
task requirements on affected tasks. The project initiator will be
responsible for editing the ISN jobsite to account for the new CLT as
soon as possible but before tasks are to be performed in the field.
8/29/14
—5—
Who Is Affected?
• USPL employees that assign contractor task(s) to projects/work
including: Asset owners; Project managers; EPIC; Construction
supervisors; Planners/Schedulers; Team Leaders; ROW
Maintenance Coordinators; Program Managers; Corrosion group,
and Tank group.
• Any contractor currently assigned to a job for USPL.
• Any contractor that uses the task list to identify his/her
qualification(s) gap.
8/29/14
—6—
What’s Changed?
The update to the current 140 task CTL consists of:
• 13 changes to the task list
• 23 tasks added
• CTL EXCEL Workbook reorganized
The following slides show the changes, additions and organization of
the CTL Excel Workbook.
8/29/14
—7—
Changes to the CTL
1. New tasks 7.2-7.6 is a combination of old tasks 7.2-7.6 and 13.1-13.5.
2. New task 42.7 is a combination of old tasks 42.1-42.6.
3. New task 1.1-1.5 does not include corrosion activities for Bare Pipe. Bare Pipe activities
for old task 1.1-1.5 are now in New Task 300.
4. Old task 20.4 is now task 304.
5. Old task 18.1 & 18.2 is now task 305.
6. Old task 28 is now task 306.
7. Old task 26 is now task 307.
8. Old task 33.1-33.3 is now task 308.
9. Old task 34 is now task 309.
10. Old task 35 is now task 310.
11. Old task 36.1-36.3 is now task 311.
12. Old task 37 is now task 312.
13. Old task 29.1 & 29.2 is now task 313.
8/29/14
—8—
Added Tasks
The following task numbers were added to the task list:
8/29/14
44.3
301
330
44.4
303
331
44.5
314
332
44.6
315
44.7
316
44.8
317
63.1
318
63.2
321
63.3
322
63.4
329
—9—
The Updated CTL Workbook
The updated CTL Workbook contains six worksheets:
• Task List
• Guide
• Matrix
• OQSG
• NCCER
• NACE
8/29/14
—10—
Guide
The Guide worksheet
explains the contents of
the Workbook.
8/29/14
—11—
Task List
The Task List worksheet
lists each task by BP Task
Category.
8/29/14
—12—
Most of the tasks have comments
that provide additional information
about the task.
8/29/14
—13—
Matrix
The Matrix worksheet
shows for each task, the
specific vendor program
that BP accepts as OQ for
that task.
8/29/14
—14—
Some tasks have comments that provide information about
• Additional qualification requirements
• Acceptable substitute qualifications
• Task reorganization from the previous CTL
8/29/14
—15—
OQSG
The OQSG worksheet maps OQSG Tasks to the BP
Contractor Task List.
8/29/14
—16—
NCCER
The NCCER worksheet maps NCCER Tasks to the BP
Contractor Task List.
8/29/14
—17—
NACE
The NACE worksheet maps NACE Tasks to the BP Contractor Task List.
8/29/14
—18—
For More Information
• For additional information/assistance, contact
Frank Torres
Operator Qualifications Coordinator
(219) 472-2403
Frank.Torres@bp.com
8/29/14
—19—
Summary
You should now be able to describe:
• What’s changed between the current CTL and the updated CTL.
• The timetable for phase-in of the updated CTL.
• Where to get additional information about the CTL update.
8/29/14
—20—