Capital Project Cost Reporting Project Goals • Documentation of project approval • Approval path based on reporting structure and individual approval limits • POs against an overspent project to be stopped • Detailed comparisons of approved AFE budget and cost breakdown • Reporting on project spending Project Goals (cont) • Reporting of internal maintenance labor by project • Process to capture and approve project scope changes – Allows for easy tracking of scope changes – Allows for incremental approvals of project costs • Document the date project is closed • Single system solution Description Budget Costs Costs @ Comp AFE Budget Engineering Conceptual Engineering Detailed Engineering Engineering Support $ $ 441,500 1,025,643 $ $ $ 424,360 1,138,684 52,879 Total Engineering $ 1,467,143 $ 1,615,923 $ $ PO-Vessel Peterson PO - Exchanger Misc Equipment (filters, specialty valves etc. Structural Steel & Foundation Material PO - Structure PO- Pipe Supports Piping Material $ Instrument Material Electrical /Instrumentation Material Insulation/Paint Catalyst/Chemicals Spare Parts/Critical Spares Stores Materials Rentals Total Equipment & Materials $ 1,100,000 $ 930,108 $ $ 27,988 $ - $ $ $ 209,281 34,155 7,486 $ $ $ - $ $ $ 8,443 1,659 1,219,120 $ $ $ Procurement Major Equipment Construction Civil / Underground Structural Steel Mechanical $ 338,034 1,438,034 2,390,580 $ 1,393,019 $ - 2,300 2,500 4,800 1,843,499 $ $ $ . $ 424,360 1,138,684 58,879 $ 932,408 1,621,923 $ $ $ $ (17,140) 113,041 58,879 154,780 $ (167,592) 27,988 $ 27,988 $ $ $ 209,281 35,863 7,486 $ $ $ (128,753) 35,863 7,486 $ $ 8,865 4,159 1,226,050 $ $ $ $ $ $ $ 3,236,518 8,865 4,159 (211,984) 845,938 Piping Contractor Pump Installation Contractor Insulation /Painting Electrical/Instrumentation $ - Electrical Contractor A Construction Support Total Construction $ 2,390,580 $ $ 24,868 32,482 $ $ 10,000 1,853,499 $ $ 41,842 3,278,360 $ $ 41,842 887,780 PR and WO Mods • An ‘AFE #’ field was added to both the PRs and the WOs in Maximo. – The AFE # has been programmed to carry forward to the PO and the invoice as they are created • PRs with an AFE # are only approved by the project owner – Encourage users to tie PR/PO cost to AFE – Eliminate redundant approvals • When a project work request is rolled to a WO the AFE # is added by the scheduler – Finance reviews all new WOs to assure AFE # are being added correctly Project Reporting • Monthly Management Review – Sub set of all ongoing projects – Project owners are required to go over the Maximo generated spending reports – Report tracks both actual spending and committed cost • Before a project can be closed all POs and WOs must be closed. – Requires owner to assure POs have been invoiced and labor has been charged to the WOs • Maximo will not allow a PO to be approved if the AFE is over spent – Controlled by workflow at time of PO approval • Tax department is using the Maximo generated spending reports for multiple tax fillings Change in Project Scope • Project scope and price increases must be communicated to and approved by management. – The AFE revision is added to the approved spending and the new total amount is used to determine the approval path. i.e. If the revised project total breaks the $1 million level it will go to the next management level for approval. – Multiple revisions can be done • Allows the AFE to be generated when long lead time items are ordered • AFE is then revised to meet project milestones AFE General Info Screen AFE Automation Scripts Script Name Launch Point Code BWO_AFE_GRAND_ TOTALS Update of BWO_AFE or Action assigned to AFE revision workflow Calculates the totals for each cost breakdown category BWO_AFEREV_ CREATE Update of BWO_AFEREV mbo.setValue("AFEREV",mbo.getThisMboSet().max("A FEREV") + 1,2); AFE_REV_TOTAL_ COST Update of BWO_AFEREV Calculates the totals for each cost breakdown category for revisions only Show in system Show in system MOC Escalations Escalation ID BWO_AFE_TOT Description Notifies the AFE originator that PO’s have comsumed at least 95% of the AFE approved spending BWO_AFEREV_WF Submits an AFE revision into workflow BWO_AFE_EX_ ADM Condition :BWO_AFE_2_AFE_SUMMARY.afe_rev_po_commit _percent >= 95 status in ('NEW','WAPPR','REJECT') and submit = 1 and bwo_aferevid not in (SELECT OWNERID FROM WFASSIGNMENT WHERE ASSIGNSTATUS = 'ACTIVE' AND OWNERTABLE = 'BWO_AFEREV') Notifies the CEO executive status = 'WAPPR‘ and bwo_current_approver = assistant that an AFE is awaiting 'CRYSTAL.MAGGELET' approval AFE Reports • AFE Related Records Report • AFE Summary • AFE Project Cost Breakdown