Power Quality Solutions , Thomas Liu 劉佳炘 0955-614-833 Power Protection Products PCS100 AVC ( Active Voltage Conditioner ) © ABB Group April 13, 2015 | Slide 1 No Protection From PQ Events 未經保護的電力品質事故 Utility 電源 © ABB Group April 13, 2015 | Slide 2 Home Who Needs An AVC? 誰需要AVC ? Factories, facilities and commercial operations that are dependant on a good quality power supply so they can produce quality products without interruption need the ABB AVC. 高度要求電力品質的工廠、設備與公司行號。當這 些客戶的連續生產受到中斷時,產品品質會受到很 大影響。這些場合非常需要AVC解決方案。 Home © ABB Group April 13, 2015 | Slide 3 PCS100 AVC Sag (Dip) Protection 電壓驟降保護 Utility Sag 電壓驟降 Injection Transformer 注入式變壓器 Bypass 旁 路 Rectifier and Inverter 整流和逆變 AVC Structure © ABB Group April 13, 2015 | Slide 4 Home PCS100 AVC Swell Protection 電壓驟升保護 Utility Swell 電壓驟升 Injection Transformer 注入式變壓器 Bypass 旁 路 Rectifier and Inverter 整流和逆變 AVC Structure © ABB Group April 13, 2015 | Slide 5 Home Industries and Examples 產業範例 Semiconductor 半導體 Chip Manufacturing (Vacuum pumps, Lithography, RFI machine) 晶片製造(真空泵浦,光刻,RFI設備) Oil 石油 Test and Assembly (Regulated voltage for reliable testing) 測試和封裝步驟(需要穏定的電壓以保證測試的可靠度) Gas 氣體 Flat Panel Displays (LCD or Plasma) 平板顯示器(液晶或電漿) Photovoltaic (PV) 太陽能電池 Polysilicon (wafer saw damage and polishing) 多晶矽(矽晶切割線損壞和拋光) Textile (loom protection) 紡織(織布機保護) Hospital 醫院 MRI scanners etc (prolongs life) 核磁共振掃描儀等(延長其使用壽命) High speed packaging 高速包裝 Plastics 塑料 Extruders, multilayer film 擠出機,多層薄膜 Pharmaceutical 製藥 Automotive 汽車 Painting, robots, sags caused by welders 塗漆,機器人,焊接造成壓降 Printing 印刷 © ABB Group April 13, 2015 | Slide 6 Chemical 化工 setup time missed deadlines 重新啓動機器浪費時間,延遲交期 Home Cause of Power Quality Problems 電力品質問題的起因 The Utility attempts to supply sag and swell free power to the end user. However even with extensive maintenance programs the Utility cannot prevent power quality problems from affecting the end user. 盡管台電耗費許多人力和大筆金錢維護電力網路,嘗試提供穏定電壓給用戶。仍無法避免電力品 質問題造成用戶的困擾。 Some Causes of PQ problems 電力品質問題的產生原因 © ABB Group April 13, 2015 | Slide 7 Weather related events 天氣事件 Lightning 閃電 Heavy rain 暴雨,Snow 下雪 High wind 大風,Typhoon 颱風 Earthquake 地震 Single Phase Sags the most common PQ event 單相壓降是最常見的電力品質事件 Accidents 偶發事件 Vehicle 車禍 Construction, cranes, excavation 建築施工,起重機,開鑿機 Human error 人為失誤 Animals in contact with lines 動物誤觸 Other 其它 Large motors starting 大電動機啓動 Short-circuit faults 短路故障 Switching operations 線路切換 Distribution equipment failure 配電裝置故障 Home PCS100 AVC Active Voltage Conditioner Overview © ABB Group April 13, 2015 | Slide 8 Overview PCS100 AVC specifications 40% type © ABB Group April 13, 2015 | Slide 9 Full correction, three-phase sags down to 60% retained voltage Full correction, single-phase sags down to 40% retained voltage Partial correction, three-phase sags down to 30% retained voltage Partial correction single-phase sags down to 0% retained voltage Continuous “ONLINE” regulation Over and under voltage regulation Correction for voltage vector phase angle errors created by faults in the supply Voltage unbalance correction Overview PCS100 AVC features © ABB Group April 13, 2015 | Slide 10 Fast (sub-cyclic) response Simple user controls Rugged overload capability Short circuit protected Extensive diagnostics Fault log Voltage event data logging Ethernet connectivity Modular construction Overview Modular construction © ABB Group April 13, 2015 | Slide 11 Minimum spares required High commonality of parts Fast replacement Overview Single line diagram Input Sag/swell animation 3ph utility supply 3ph output secondary Distribution transformer primary Input circuit br eaker Boost transformer Bypass Auto transformer (non 400/480V supply ) Rectifier and inverter Environmental System wiring diagram © ABB Group April 13, 2015 | Slide 12 Rectifier fuse Load Overview Typical factory configuration PCS100 AVC The PCS100 AVC protects UPS operation and gives extended battery life © ABB Group April 13, 2015 | Slide 13 UPS Overview Full web and plant system USB interface USB port Technician commissioning support tool Resident webpage in graphic display module Plant SCADA accessing data registers Modbus/TCPIP over Ethernet Plant wide access from web browser Firewall © ABB Group April 13, 2015 | Slide 14 Worldwide web 10 Years of SAG Data © ABB Group 10 Year Data from A Major Semiconductor FAB Percent of nominal voltage 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 1 10 100 Duration Cycles © ABB Group April 13, 2015 | Slide 16 1000 40 % PCS100 AVC Response To The Events Percent of nominal voltage 100% 90% ≥ 45% full correction 80% 70% 60% 50% 40% 30% 20% 10% 0% 1 10 100 Duration Cycles © ABB Group April 13, 2015 | Slide 17 1000 40 % PCS100 AVC Response To The Events Percent of nominal voltage 100% 90% 80% 70% 60% 50% 40% 30% 0 to 45% partial correction 20% 10% 0% 1 10 100 Duration Cycles © ABB Group April 13, 2015 | Slide 18 1000 PCS100 AVC Case studies © ABB Group April 13, 2015 | Slide 19 PCS100 AVC Case studies © ABB Group April 13, 2015 | Slide 20 1. Bottling plant Florida USA 2. Plastic extruder Auckland New Zealand 3. Solar panel manufacturer Maryland USA 4. Semiconductor FAB China/Korea 5. DWA welding machine Malaysia 6. Printing press USA 7. Container crane Hong Kong Case study : four Semiconductor FAB plants © ABB Group April 13, 2015 | Slide 21 Case study : four Overview – reference clients (Electronics) Over 350MW of voltage conditioners supplied to semiconductor FABs in Asia and North America over the last three years © ABB Group April 13, 2015 | Slide 22 Case study : four Major projects PCS100 AVC Hynix Wuxi China 80 x 1000kVA, 1250kVA, 1500kVA 108MVA total Supplied as three separate projects Project 1 2006 Project 2 2007 Project 3 Commissioned May 2008 Hynix M11 Cheongju Korea © ABB Group April 13, 2015 | Slide 23 52 x 1250kVA, 1500kVA Commissioned Feb 2008 Space allocated for M12 © ABB Group April 13, 2015 | Slide 24 PCS100 AVC System © ABB Group April 13, 2015 | Slide 25 PCS100 AVC Rectifier Sine Filter IGBT + Bus Fuses L1 L2 L3 RFI Filter - Bus Soft Start Contactors Back © ABB Group April 13, 2015 | Slide 26 Inverter IGBT active rectifier Bi-directional power flow Sinusoidal input current DC output PCS100 AVC Inverter Fuses + Bus IGBT Sine Filter Fuses U V W RFI Filter - Bus SCR/Contactor BYPASS Back © ABB Group April 13, 2015 | Slide 27 IGBT inverter Bi-directional power flow Sinusoidal output current DC input PCS100 AVC Injection transformer Back © ABB Group April 13, 2015 | Slide 28 400kVA 480 volt model Boost Transformer Internally Bypassed When the AVC is not online the boost transformer primary must be short circuited Online means the AVC is running providing voltage regulation and sag correction When internally bypassed the boost transformer “from an electrical perspective” appears as a reactor (inductor) in series with the load Typical Internal bypass Impedance <2.5% Some internal bypass event causes Secondary Supply Load Primary Operator stopping AVC Overload >150% for 30 seconds Internal Fault Equivalent electrical circuit for an internally bypassed AVC Primary Short Circuited Supply INDEX © ABB Group April 13, 2015 | Slide 29 Load PCS100 AVC 40% 3 phase balanced event performance graph AVC Output Voltage (Line to Line)* 120% 110% 100% AVC Output Voltage Utility Voltage 90% AVC Correction time (s) 90s 80% 80s 70% 70s 60% AVC in Bypass 60s AVC Online 50% 50s 40% 40s 30s 30% Correction Time 20% 20s 10% 10s 600ms 0% 10% 70% balanced sag 20% 30% 40% 0s 50% 60% 70% 80% 90% 100% 110% 120% Utility Voltage (Line to Line) 0340-712a *AVC output at 0.8 PF for 208 volt systems © ABB Group April 13, 2015 | Slide 30 OPEX AVC and Dual Conversion UPS 800kVA 100% Load kWhr at $2 NT Chiller System COP 3 800kVA 480V System 800kVA Load 100% Load AVC Efficiency UPS AVC Difference 98.70% 93.40% 5.30% 91,104 kW 462,528 kW 371,424 kW NT$182,208 NT$925,056 NT$742,848 kW Input 30,368 kW 154,176 kW 123,808 kW OPEX NT$60,736 NT$308,352 NT$247,616 kW Losses OPEX Air Conditioning OPEX Saving One Year NT$990,464 © ABB Group April 13, 2015 | Slide 31 YEARS 5 NT$4,952,320 10 NT$9,904,640 15 NT$14,856,960 UPS © ABB Group April 13, 2015 | Slide 32 Thomas Liu 劉佳炘, PE Power Quality, 18/10/2012 PCS100 UPS-I, Industrial UPS Short term outage protection © ABB Group April 13, 2015 | Slide 33 PCS100 UPS-I, Industrial UPS There is a solution © ABB Group April 13, 2015 | Slide 34 The PCS100 UPS-I is the ideal solution where very deep sags or short term power outages are a problem The PCS100 UPS-I uses energy storage coupled through an inverter to allow the downstream load to ride through very deep sags and short term outages The PCS100 UPS-I is an offline system. It is inactive unless the voltage falls by 10% - 13%. This enables it to be very efficient, up to 99% PCS100 UPS-I, Industrial UPS Single line diagram Input Output UPS-I Applied Voltage Failsafe Bypass secondary Utilit y Distribution Transformer Utility Disconnect Coupling Transformer primary Inverter Charger Battery Option Ultra Capacitors UPS-I © ABB Group April 13, 2015 | Slide 35 Protected Load PCS100 UPS-I, Industrial UPS Outage protection Utility Sag Distribution Transformer Utility Disconnect Coupling Transformer Inverter Ultra Capacitor UPS-I © ABB Group April 13, 2015 | Slide 36 PCS100 UPS-I, Industrial UPS Operation cycle 1. Utility voltage within limits Power to the load is supplied from the Utility Energy flow SCR’s On Utility voltage Output voltage Inverter Off UPS-I voltage 3. Utility returns 2. Utility Outage Occurs Power to the load is switched to the UPI-I energy storage within ¼ cycle. SCR’s Off Utility voltage Energy flow Inverter on © ABB Group April 13, 2015 | Slide 37 Output voltage UPS-I voltage PCS100 UPS-I, Industrial UPS Response to supply loss PCS100 UPS-I Input PCS100 UPS-I Output © ABB Group April 13, 2015 | Slide 38 On detecting a disturbance the inverter takes over the load by actively commutating (turning off) the Utility Disconnect SCR switch Transfer takes place in less than 1/4 cycle PCS100 UPS-I, Industrial UPS Energy storage – ultra capacitors Ultra capacitors Protection for 3 seconds (Typical) Single string rating 300kW for 1 sec or 240kW (300kVA at 0.8 pf) for 3 sec Ultra capacitors by LS Mtron, Korea Design Life: 10 years Cycle life: >500,000 24 pieces of 32V blocks per string (single or double string enclosures) +/- 375Vdc High discharge efficiency Safe and compact matching cabinet User benefits Double String Enclosure © ABB Group April 13, 2015 | Slide 39 Reduced maintenance Smaller footprint PCS100 UPS-I, Industrial UPS Graphic display module Status Page online On/Off button status bar Menu selection buttons Supply voltage Load voltage Load current Storage voltage Status Page In bypass © ABB Group April 13, 2015 | Slide 40 Visual representation of the PCS100 UPS-I components PCS100 UPS-I, Industrial UPS Graphic display module Event & fault log Event and Fault Log, date and time stamped Records over 5000 events Log can be download to a PC and viewed in Excel Summary of power quality events Event summary © ABB Group April 13, 2015 | Slide 41 OPEX UPS-I and Dual Conversion UPS 800kVA 100% Load UPS-I kWhr at $2 NT Chiller System COP 3 800kVA 480V System 800kVA Load 100% Load Efficiency UPS-I UPS Difference 99.30% 93.40% 5.90% kW Losses 49,056 kW 462,528 kW 413,472 kW Cost NT$98,112 NT$925,056 NT$826,944 kW Input 16,352 kW 154,176 kW 137,824 kW Cost NT$32,704 NT$308,352 NT$275,648 Air Conditioning OPEX Saving One Year NT$1,102,592 © ABB Group April 13, 2015 | Slide 42 YEARS 5 10 15 NT$5,512,960 NT$11,025,920 NT$16,538,880 UPS © ABB Group April 13, 2015 | Slide 43 ABB PowerWave UPS 1kVA to 5.0MVA 10 November 2011 Newave SA 44 ABB PowerWave UPS 1kVA to 5.0MVA General Data DPA UPScale Powerwave 33 Power range 10/20/40/80/120kW 60/80/100/120/160/200/2 50/300/400/500 kW Output power factor 1.0 1.0 Parallel configuration © ABB Group April 13, 2015 | Slide 45 Up to 10 units Efficiency Up to 95.5% Up to 96% Input frequency 35-70Hz 35-70Hz Input distortion THDi <3% at 100% <3.5% at 100% Modular (Three phase) Standalone (Three phase) ABB PowerWave UPS Reference 10 November 2011 ABB PowerWave UPS Feature Efficiency full load (up to 96% in double conversion online mode). Low input current total harmonic distortion(THDi) (3.5% at 100% load) Near-to-unity input power factor Fully rated output power (PF=1) DPA UPScales : Capacity in 10KW or 20KW power steps N+1 redundancy Up to 95.5 efficiency Low input harmonics distortion (THID <3%) DPA – high level of flexibility DPA – lowest total cost of ownership DPA – maximum availability © ABB Group April 13, 2015 | Slide 48