Sabah Oil and Gas Conference 2014 Talisman Malaysia Increasing Growth Opportunities for Sabah May 26th, 2014 Content Overview of Talisman Energy Sabah Growth Strategy Securing a Foundation Maximising Asset Recovery Expanding through Exploration Working with other Operators Talisman Energy Global Operations Two Core Regions : The Americas and Asia-Pacific Core: Asia-Pacific • Generating free cash flow, near-term exploration potential • Long life assets with high netbacks Core: Americas • Resource plays provide long-term growth • Colombia – exploration and development underway • Other areas – considering all options • UK – Sinopec deal lowers exposure • Norway – sales process underway • Kurdistan – Kurdamir and Topkhana appraisal ongoing 2014 production guidance 350-365 mboe/d • 2013 2P reserves ~1640 mmboe – Core areas 324-334 mboe/d − Core areas ~1480 mmboe – Other 26-31 mboe/d − Other ~160 mmboe NYSE : TLM | TSX : TLM 3 www.talisman-energy.com Talisman Energy - Asia Pacific A Core Talisman Region Vietnam HST/HSD Malay Basin Vietnam Nam Con Son Sabah Basin Tangguh Papua New Guinea South Sumatra Kitan/LamCor Core areas Additional Assets Exploration NYSE : TLM | TSX : TLM 0 500 1,000 Km 1,500 4 www.talisman-energy.com Talisman Energy in Malaysia Assets Overview TLM block Oil field Gas field Vietnam Malaysia SB309 & SB310 (70% WI) Gross exploration acreage 13,000 km 2 3-4 well exploration program planned in 2014 PM-3 CAA (41% WI) Unique cross-border development Supplying gas to two nations Talisman’s largest operated asset Finalizing PSC extension Kinabalu (60% WI) Operated effective 26 Dec 2012 Successful completion of 3 infill wells Commencing redevelopment Sabah PM305 & PM314 (60% WI) Peninsular Malaysia NYSE : TLM | TSX : TLM SAA – about 85% recovery to date Studying options to extend field life Sarawak 5 www.talisman-energy.com Sabah New Core Area anchored by Kinabalu Kinabalu is a secure base with upside recovery opportunities Significant acreage in a prolific and proven hydrocarbon province Extensive infrastructure enhances exploration monetization opportunities for oil and gas Potential Synergies with other operators to optimise operation and Development Plans Near Term Kinabalu Transfer of Operatorship NYSE : TLM | TSX : TLM 6 Future Growth Exploration Success www.talisman-energy.com 2012 Kinabalu Oil PSC Overview Kinabalu – Location Map Kinabalu – Block Details Block: SB1 Kinabalu Samarang Complex (PCSB*) 2012 Kinabalu Oil PSC: Start Date: Dec 2012 (20 years license) Operator: TLM (60%) Partner: PETRONAS Carigali (40%) Location 55 km NW of Labuan KNAG (PCSB) 28 km SW of Samarang Kinabalu KNDP-A 2 km SE of KNAG Field Water Depth: 56 m Labuan LCOT (SHELL) Discovery: 1989 and First Oil: Dec 1997 Cum. Oil Production @1/1/14 = 97 MMstb 20 Development Wells (20 active strings) First PSC handover to International Operator First progressive volume PSC to encourage brownfield redevelopment First infill well : 9 months following transfer of operatorship Redevelopment project, Concept Selection : 10 months following transfer of operatorship NYSE : TLM | TSX : TLM 7 www.talisman-energy.com 2012 Kinabalu Oil PSC Growth Strategy Kinabalu Production Operations Improve the HSE Performance Improve Field Reliability Existing Platform Debottlenecking Project to be completed in Q4 2014. LP Separator Early Rejuvenation Redevelopment New Platform New Facilities Additional Infill Drilling Secondary Oil Recovery Well interventions Six Infill wells approved Double Field Production within one year South Sabah Growth & Synergies Exploration Success Potential Synergies with PETRONAS Carigali in Sabah KN 114st Within Talisman Corporate Responsibility Standards NYSE : TLM | TSX : TLM 8 www.talisman-energy.com Managing Aging Infrastructure It starts at the beginning IDENTIFY HAZARDS DESIGN CONSTRUCT OPERAT E Decommission Management of Change INSPECT Training & Competency Cessation of Production Operations MAINTAI N VERIFY Helideck Lighting Installation NYSE : TLM | TSX : TLM Crane serviced and recertified for man-riding 9 EMERGENCY RESPONSE Additional Escape Route www.talisman-energy.com Facilities Debottlenecking Ready for Future Growth Facilities Debottlenecking Initial Infill Drilling programme and well interventions increasing fluids throughput Restrictions in liquid export rates Preparation for additional offtake rates once the full field redevelopment project is implemented Fluid Production Rate (kbpd) 2019 2017 2015 2013 2011 2009 2007 2005 2003 2001 1999 Gas Production Rate (MMscfd) Liquid Production Increase Remove produced water prior to export Convert LP Separator to 3 Phases Equipment Integrity Improvement Install Online Sand Removal System Gas Production Increase Modify LP Compressor to increase its capacity to minimize flaring. NYSE : TLM | TSX : TLM 10 www.talisman-energy.com Field Rejuvenation Maximising use of Existing Slots Well 4 Well 3 Well 5 Main Fault Block East Fault Block Well 2 #3 #4 #5 #1 #2 Well 6 Well 1 #6 Note: All Wells Are Projected NYSE : TLM | TSX : TLM 11 www.talisman-energy.com Field Rejuvenation 20 60 Cost (US$MM) 80 NPT (%) Days Drilling Performance to date 50 40 15 30 40 10 20 20 5 10 0 0 Well 1 Well 2 Days Planned Well 3 Days Actual Well 4 0 Well 1 NPT Actual P No Recordable Incidents (LTI, RWI, MTI) Excellent operational performance - benefit of established Rig Contractor (20+ years in Malaysia) Continuity of activity in Sabah – Key to Performance NYSE : TLM | TSX : TLM 12 Well 2 www.talisman-energy.com Kinabalu Redevelopment Maximising Recovery Factor Consider Novel ‘Cost/Schedule Saving’ Schemes ‘No Stone Unturned’ A Team Approach : Project Success is driven by the Integration of all Disciplines NYSE : TLM | TSX : TLM 13 www.talisman-energy.com Kinabalu Redevelopment Selected Concept Overview Two Stage Development Secondary Recovery Implementation Increase field recovery factor to ~ 40% Stage 1 (Early Production) • Installation of a 20 slot wellhead platform (WHP) bridge linked to KNDP-A. • Maximum Use of Existing KNDP-A Scope Estimated 1st Oil 4Q 2016 Stage 2 (Full Production) • Installation of a new CPP bridge linked to the new WHP • Gas Compression & Water Injection 4Q 2017 (Estimated 1st Injection) New Well Head Platform NYSE : TLM | TSX : TLM 14 www.talisman-energy.com Exploration Portfolio SB310 & SB309 Prospects and Leads NYSE : TLM | TSX : TLM 15 Partners: TML (70%), PCSB (30%) PSC Signed; Effective Date - 26th October 2009 Exploration period: 6 years 5 Commitment wells in SB310; 3 wells in SB309 www.talisman-energy.com South Sabah Synergies A way of working between Operators KNNAG / Kinabalu Operational Integration KNNAG accommodation Helicopter Sharing Marine Vessels Spare Sharing Subsurface Data Sharing 5 Year Integrated Plans Warehousing NYSE : TLM | TSX : TLM Samarang / Kinabalu Network Optimization Facilities optimization with KN and Samarang Gas utilization Liquid handling Debottlenecking 16 Joint Development Plans Area Development Plans Maximise Utilisation of Existing Infrastructure www.talisman-energy.com Corporate Responsibility within Talisman Supporting our Growth Plans Our Themes Education Health Environment NYSE : TLM | TSX : TLM 17 www.talisman-energy.com Thank You NYSE : TLM | TSX : TLM 18 www.talisman-energy.com