Simulation in Korea to support CAX 2011. 10 Agenda JTLS in Korea ROK JCS’s Plan to support CAX Republic of Korea Simulation Development Plan JTLS in Korea JTLS is used by ROK AU(Air University) To give an experience for joint warfare to students of AU Joint operations : important factor in modern warfare Especially, air fighter & commander required joint concept JTLS is a unique joint theater level simulation ROK AU The supreme professional military education org. for air force offices 3 courses SOC - Squadron Officer Course CSC - Command Staff Course 10~15 foreign officers join annually Pre-commander course -3- JTLS in Korea War-gamming practice in AU Why performed? To give a realistic experience for warfare How to perform? 1-week war-gamming practice using JTLS Concept(2 days) – Practice by JTLS(3~5 days) – AAR(1 day) Why JTLS? JTLS is a unique joint theater level simulation How many times? Every curriculum of AU performs war-gamming practice 7 times practices are performed annually 4 SOC, 1 CSC and 2 pre-command courses -4- ROK JCS’s Plan to support CAX ROK-US Combined/Joint exercises Exercises Audience, Objective and Method • ROK-US combined military and ROK government - Military: warfighting commands of corps and the higher echelon UFG • Exercise for full spectrum of conflict in Korea - Crisis Management, Transition to War, Defense, Dominate, and Stability Operations * Ulchi : a famous general of Ulchi Focus Guardians ancient Korea • CPX using constructive simulation + Virtual(Specific area) • ROK-US combined/joint staffs including above corps equivalent ROK-US Combined Forces Command KR/FE • Exercise for CFC readiness Key Resolve/Foal Eagle - RSOI of US wartime reinforcement (Reception, Staging, Onward Movement & Integration) • CPX using constructive simulation + FTX(Specific area) -5- ROK JCS’s Plan to support CAX Environment of Korean theater Physical Characteristics Peninsula : water on three sides Tides : west extreme, east moderate Mountainous : limited mobility corridors Weather : four seasons Extensive urban sprawl in the south Transportation networks : good in the south, poor in the north Military Factors Predominantly land theater Air support can be decisive Naval operations exert heavy influence Amphibious turning movements Extensive SOF infiltration by land, air, & sea From Google Earth -6- ROK JCS’s Plan to support CAX Modeling Challenges Multiple echelons in the training audience ROK & US warfighting commands above corps equivalent Greatest modeling challenge: Land forces : large number, multiple echelons App. 55 friendly and 160 opposing div. & separate brigades Theater counter fire operations : requires high resolution Naval : five carrier strike groups plus numerous other air, surface, and sub-surface operations, NSW, MCM Mine Counter Measure Naval Special Warfare Multi-divisions for amphibious operations Air : 2,000 ~3,000 friendly sorties per day Numerous opposing SOF missions and TBM launches High resolution collateral and compartmented intelligence portrayal -7- ROK JCS’s Plan to support CAX Simulation federation to support exercises(Current) Single Integrated Federation ROK Models US Models Ground Chang-Jo 21 CBS Ground Chon-Ja-Bong Air Naval AWSIM RESA TACSIM BICM Intel Chang-Gong VSTARS JTTI + K/JIS Cheong-Hae Air Naval JTTI : Joint Training Transformation Initiative K/JIS : Korea Joint training confederation Infrastructure SW MUSE EW ACE IOS Logistics LOGFED JNEM CA High Complex, High Cost Structure MDST TMO $10 Million/each ex. -8- ROK JCS’s Plan to support CAX Simulation federation to support exercises(Plan) Separated Parallel Federation US Models CBS Chang-Jo 21 CI Ground ROK Models Confederation Interface Air Ground Chon-Ja-Bong AWSIM Counter-Fire RESA BICM Intel JTTI Intel TACSIM JIS VSTARS MUSE EW ACE IOS JNEM CA TMO Logistics LOGFED Air Cheong-Hae Naval JCFS KSIMS Naval Chang-Gong JCSSM Logistics JIOSST Info. warfare JCMOS Civ. Op ETSS-TMO TMO MDST -9- ROK JCS’s Plan to support CAX Simulation federation to support exercises(Conceptual) Separated Parallel Federation - alternative US Models ROK Models CI Confederation Interface Joint JTLS Taegeuk-JOS Joint Counter-Fire KSIMS JCFS TACSIM BICM Intel JTTI Intel JIS VSTARS MUSE EW ACE IOS JNEM CA TMO Logistics LOGFED JCSSM Logistics JIOSST Info. warfare JCMOS Civ. Op ETSS-TMO TMO MDST - 10 - Simulation Development Plan Developed Simulation Model Combat Simulation Models Resolution Korean, means the spirits of Korean marine Chon-Ja-Bong Chang-Jo 21 Korean, means blue sky Korean, means blue sea Cheong-Hae AWSIM Chang-Gong RESA Korean, means creation CBS Ground Air Naval - 11 - Simulation Development Plan Developing Simulation Model Korean, means the Great Ultimate Joint Combat Simulation Model : Taegeuk-JOS Development period : 1st stage(2002 ~ Joint Operations Simulation 2004), 2nd (2010 ~ 2012) Joint (land, air, naval etc.) constructive simulation Similar resolution with JTLS Support CPX for ROK-JCS staffs Modeling feature Modeling Unit Ground combat : Regiment or Battalion Air : Air mission ( 1 ~ 4 aircrafts) Naval : Ship including submarine Special : Mission team Attrition : Lanchester attrition + Pk - 12 - Simulation Development Plan Developing Simulation Model Joint Combat Simulation Model : Taegeuk-JOS Modeling feature Terrain : Vector layers on Grid base - 13 - Simulation Development Plan Developing Simulation Model Joint Combat Simulation Model : Taegeuk-JOS Modeling feature Ground Maneuver : Open or Road - 14 - Simulation Development Plan Developing Simulation Model Joint Combat Simulation Model : Taegeuk-JOS Modeling feature Sea/Air Movement : Free-straight move on line segments - 15 - Simulation Development Plan Planned Simulation Models Objective : To support Combined/Joint CPX Subject : Important functional operations area in modern war Required higher resolution than combat area Developed Joint Counter Fire Simulation Joint Intelligence Simulation Joint Combat Service Support training simulation Model Planned Joint Information Operations Simulation System for Training Joint Civil Military Operations Simulation Exercise & Training Supporting System for TMO - 16 - Simulation Development Plan Other Developing or Planned Objective : To support Combined/Joint CPX Subject : Important functional operations area in modern war LVC integrated simulation required for specific area LVC integrated VC integrated Constructive Planned Constructive Constructive LVC integrated - 17 - Thank You! Sang-Yun Jeong Ph.D Chief of KIDA DM&S Research Division syjung@kida.re.kr