Tower Locations

advertisement
THOMAS GOSNELL HALL
Sophia Maggelakis
Dean of the College of Science
Professor of Mathematics
Office: 1108 Gosnell Hall
(585) 475-5127
http://www.rit.edu/cos/deansleadership-team-staff
Location 1
THOMAS GOSNELL HALL – FLOOR PLAN
Available Height:
1- 46’
2 - 43’
3 – 39’
Location 2
THOMAS GOSNELL HALL
PRO:
• Visibility
• Access from top
• Maximum height
• Low traffic area
• Good place to install
• Some What easy to install
Location 3
THOMAS GOSNELL HALL
CONS:
• Distance from engineering
building
• Approval from an nonengineering Dean
• Location in a non stake
holder building
• Access to run the tower,
depending building
regulations.
Location 3
Location 1
GOLISANO HALL
Andrew Sears
Dean and Professor
Andrew.Sears@rit.edu
585-475-7203
GOL-1000
http://www.rit.edu/gccis/
people
GOLISANO HALL – FLOOR PLAN
Available Height:
1,2,3 – 33’-7”
GOLISANO HALL
PRO:
• Visibility
• Access from top
• Maximum height
• Low traffic area
CONS:
• High traffic area
• Distance from engineering
building
• Approval from an nonengineering Dean
• Location in a non stake
holder building
• Access to run the tower,
depending building
regulations.
JAMES E. GLEASON HALL
Harvey Palmer
Dean, Professor, PE
hjpeen@rit.edu
585-475-6361
GLE/3205
http://www.rit.edu/kgcoe/facultystaf
f#office-of-the-dean
Location 2
JAMES E. GLEASON HALL – FLOOR PLAN
Available Height:
1- 32’
2 – 34’ (To roof)
3 – 38’-8”
4 – 26’-10”
5 – 11’ 7”
JAMES E. GLEASON HALL
PROS:
• Local turf
• Visibility
• Good place to install
Location 2
JAMES E. GLEASON HALL
CONS:
• No access from top
• Obstructs visibility
• Can not achieve desired
height
• Significant amount of traffic
Location 2
JAMES E. GLEASON HALL – 4TH FLOOR PLAN
(TEMPORARY LOCATION)
Available Height:
1 - 17’
2 - 11’ 4”
INSTITUTE HALL
INSTITUTE HALL – FLOOR PLAN
North
Available Height:
1- 77’-6”
Door
Stairs
INSTITUTE HALL
PROS:
• Local turf
• Visibility
• Good place to install
INSTITUTE HALL
CONS:
• Distance from Engineering
GOLISANO INSTITUTE
OF SUSTAINABILITY
Dr. Nabil Nasr
Associate Provost and Director,
Golisano Institute of Sustainability
nasr@rit.edu
585-475-5101
http://www.rit.edu/gis/academics/fac
ulty/#
GOLISANO INSTITUTE OF SUSTAINABILITY –
FLOOR PLAN
Available Height:
12–
GOLISANO
INSTITUTE OF
SUSTAINABILITY
PRO:
• Visibility
• Access from top
• Maximum height
• Low traffic area
• Good place to install
Location 1
GOLISANO
INSTITUTE OF
SUSTAINABILITY
CONS:
• Distance from engineering
building
• Approval from a non-engineering
Dean
• Location in a non stake holder
building
• Access to run the tower,
depending building regulations.
• Altercation to brand new building
Location 1
GOLISANO
INSTITUTE OF
SUSTAINABILITY
GOLISANO INSTITUTE OF SUSTAINABILITY
Location 2
OUT-DOORS
PRO:
• Visibility
• Access from top
• Maximum height
OUT-DOORS
CONS:
• High traffic area
• Access to roof top
• Approval from University
• Access to run the tower,
depending building
regulations.
• Unpredictable weather
conditions
Download