Headquarters U.S. Air Force Integrity - Service - Excellence Air Force 2013 “Big Ticket Items” for Live, Virtual and Constructive Operational Training (LVC-OT) Col Marcus “Shaka” Boyd AFAMS/CC 13 Dec 12 Version 1.0 Let’s Quickly Get on the Same Page “Big Ticket Items” - Cross-cutting, AF-wide efforts to reduce or eliminate unnecessary duplication/redundancies, and increase readiness efficiencies and fiscal savings LVC-OT – The framework and art of tailoring and integrating the optimum mix of live, virtual and constructive capabilities to meet warfighter readiness training requirements Centralized Foundational Management (CFM) - “User-friendly” oversight of LVC-OT integrating infrastructure, enterprise communication solutions and workforce development Centralized Event Management (CEM) - Orchestration of crosscutting/common LVC-OT resources for major events Air Force Continuous Training Environment (AFCOTE) - The AF’s LVC-OT Integrating (“Transport”) Infrastructure Integrity - Service - Excellence 2 What are the “Big Ticket Items” CEM CFM (AFCOTE) Integrating Architecture for Air and Space LVC Environments (IA-ASLVCE) Integrity - Service - Excellence 3 Integrating Architecture for Air and Space LVC Environments (IA-ASLVCE) • What’s been done • Capability Based Analysis (CBA) – ID’ed gaps in: • LVC environments, architecture, workforce and oversight • Joint Requirement Oversight Council (JROC) approved Initial Capability Document (ICD) • Authoritative requirement document • JROC interest, potential ACAT-1AM program Transport Space • What’s next for this year • Material Development Decision (MDD) • Analysis of Alternatives (AoA) A Joint effort to identify and address foundational LVC integration issues for the air and space domains Integrity - Service - Excellence 4 LVC-OT Centralized Foundational/Event Management (CFM/CEM) • Why ? • Status-quo will most likely not be affordable • AF Modeling and Simulation General Officer Steering Group orders: • Implement centralized foundational management • Investigate centralized event management • Solution – Air Force Continuous Operational Training Environment (AFCOTE) LVC-OT Centralized Foundational/Event Management (CFM/CEM) IS IS NOT …a readily available capability to conduct integrated/distributed LVC events. …a new network that has all LVC components persistently connected. …a time/resource saver. …a usurp of AF Organizations’ responsibilities to organize, train and equip. …information assurance (certification/accreditation) efficient. …a new concept. Integrity - Service - Excellence 5 AF Continuous Operational Training Environment (AFCOTE) - Conceptual Framework Legend Constructive Village (Hub) Virtual Village (Hub) Live Village (Hub) Permanent Hwy (Network(s)) Shipping lane (Network(s)) Guarded Port (Multi-Level Security) Draw Bridge (Switch) Island (Training Enclave) Region (AFCOTE) Integrity - Service - Excellence 6 Questions? Integrity - Service - Excellence 7 Backup Slides Integrity - Service - Excellence 8 Here’s What the Warfighter Requires Essential to support the Joint Force Commander in achieving military objectives by LVC Environments A persistent, agile, trustworthy, robust, manageable, organized and integrated LVC environments. Informed Organizing “Enabling the ability to determine the appropriate application of force to dominate the operational environment.” LVC Architecture An integrated, interoperable and quality architecture that enables persistency. Realistic Training “Providing the warfighter the ability to experience the operation in a sufficiently realistic environment prior to the actual operation.” LVC Workforce An agile and trustworthy M&S LVC workforce. Validated Equipping “Instilling confidence in how systems will perform in current and future mission environments.” LVC Oversight Ensuring compliance, improving understanding, and strengthening trustworthy, reliable and effective relationships for Joint integrating architecture policies and standards. Effective Employment “Knowing the capabilities and limitations of the force to execute operational requirements, and adjusting TTPs to execute evolving operational missions.” Joint Requirement and Oversight Council Approved and Validated Requirements: Integrating Architecture for Air & Space Live-Virtual-Constructive Environments Initial Capability Document Integrity - Service - Excellence 9