Embargo plan presentation

advertisement

Report on international standards work

NEFTEGAZSTANDARD 2013

Nizhny Novgorod

October 2013

Alf Reidar Johansen

OGP Standards Manager

Content

OGP Interim Solution

• Backup slides

New ISO/OGP industry proposal

Status OGP/API TF on long term solution

Other OGP work

2

OGP Interim Solution compared to ISO route (simplified)

Project

Initiation

Drafting in

WG

1st Ballot

("DIS")

Comment

Resolution

2nd Ballot

("FDIS")

Publiced

Standard

Drafting in

WG

Publication of Draft

OGP

Process replaced

ISO process

ISO

Process

Review and approval by OGP PM & Sponsor

Comment

Resolution

Publication of Draft

Trade regulation «barrier».

Draft standards text and comments will be available in the public domain .

4

Next phase

OGP Continues to offer a safe platform for drafting international standards to be balloted and published by ISO.

OGP and ISO management had a very good meeting in August.

The Industry Solution described herein was proposed by ISO Central Secretariat, building on ISO Directives and OGP’s role as a liaison member to ISO/TC67.

9

New OGP solution vs ISO route

(draft & simplified)

Project

Initiation

Project initiation 1)

Drafting in

WG

1st Ballot

("DIS")

Comment

Resolution

2nd Ballot

("FDIS")

Publiced

Standard

Drafting in

WG 2)

Publication of Draft 4)

OGP

Process replaced

ISO process

ISO

Process

Review for controlled technology (TBA)

Comment

Resolution

Publication of Draft 3)

Trade regulation «barrier».

Draft standards and comments will be made available in the public domain.

Note 1: Project initiation may take place by OGP only.

Note 2: Non-OGP members will be invited

Note 3: May go to FDIS or publication.

Note 4: API material (TBD) may not be used

10

OGP proposed ISO/TC67 resolution

1. ISO/TC67 welcomes the offer from OGP as a liaison (A) member to continue its assistance in developing draft ISO standards in a protected environment and recommends its members to use this solution, where the

SCs/WGs find it relevant.

2. ISO/TC67 requests its secretariat to cooperate with OGP in such an arrangement.

ISO/TC67 agreed to these resolution in their plenary meeting in Oslo, September 2013.

11

Joint OGP/API TF long term solution

Establishement

Joint Task Force (TF) established by OGP and

API management August 2012

Purpose: Determine a process for the continued development of globally accepted international standards for the oil and gas industry, given the current US and EU trade sanctions.

TF membership (15 members):

• Six members from API, six from OGP members

• Added two lawyers, one facilitator

• Staff one each from OGP and API

Steering Committee (6 members)

13

Joint OGP/API TF long term solution

Terms of References

Need for a single set of industry standards to avoid duplication, with the potential for more than one brand,

Need for the standards to be globally acceptable and widely used,

Need for the standards to be accepted by the regulatory community,

A standards setting process as the foundation for the single set of industry standards that builds on the existing API/OGP infrastructure and allows for increased international participation, and

Need to ensure a legally compliant process.

14

Current status

From 8 options to one pragmatic (draft) solution that provides a process to legally publish standards using either an API or

OGP/ISO process path

TF will develop governance (front-end process) to ensure coordination between stakeholders to avoid duplication and have the largest possible audience among the global expert community

TF awaits the OFAC response to provide the final framework of the proposed solution

15

Other OGP work

OGP-IPIECA Good Practice Guidelines for

Development of Shale Oil and Gas for

European operations in final stages of approval for publication.

Wells Expert Committee active on:

• BOP reliability - being investigated

• Well Control Incidents Database - alerts

• Human Factors - Training, Competency &

Behaviour guidelines

• Standards prioritized - OGP Report 485 to be reissued these days

16

OGP Contacts

OGP Reception

Reception@ogp.org.uk

Tel: +44 207 633 0272

Alf Reidar Johansen (Standards manager)

Alf.Reidar.Johansen@ogp.org.uk

Mobile: +47 95 029 079

Jarno Dakhorst (Manager for New Solution)

Jarno.Dakhorst@ogp.org.uk

Mobile: +31 6 33 33 46 71

17

Download