FIELD WORK 03: ROAD LEVELLING WITH A LEVEL
CIVIL ENGINEERING DEPARTMENT
PROGRAM: HIGHWAY TECHNOLOGY
ACADEMIC YEAR: 2026-2027
CLASS: YEAR II HWT
MODULE TITLE: ROAD TOPOGRAPHIC WORK
MODULE CODE: HWTRTW601
CREDIT UNITS: 12
COURSE LEADER: Eng. Emmanuel NIZERIMANA
REG NO: 25RP06693
NAME: NIZEYIMANA Gad
DATE PREPARED: 05/11/2026
LOCATION: MUSANZE-NKOTSI
0page
Table of Contents
1.INTRODUCTION ............................................................................................................................... 2
2. OBJECTIVE OF ROAD LEVELLING WITH A LEVEL ON FIELD .............................................. 2
3. INSTRUMENTS AND EQUIPMENT USED ON FIELD LEVELLING ......................................... 2
4. Procedure Followed in levelling ground............................................................................................. 3
5. Data analysis and Calculation (computation) ..................................................................................... 7
6. Problems Encountered and Solutions ................................................................................................ 8
7. RESULTS .......................................................................................................................................... 9
8. CONCLUSION .............................................................................................................................. 9
9. REFERENCES .............................................................................................................................. 9
10. In-text Paragraph Citation Examples ........................................................................................... 9
Appendixes: .......................................................................................................................................... 10
1page
1.INTRODUCTION
Road leveling is a surveying operation carried out to determine the differences in elevation
between points along a road alignment. The process helps establish accurate ground levels
that are essential for the planning, design, construction, and maintenance of roads. Precise
leveling ensures proper drainage, suitable road gradients, and safe transportation
infrastructure.
The purpose of this practical exercise was to learn and apply leveling techniques using a
leveling instrument and staff along a road section. Measurements were taken and recorded to
determine reduced levels (RLs) of selected points, enabling the preparation of an elevation
profile of the surveyed road.
2. OBJECTIVE OF ROAD LEVELLING WITH A LEVEL
ON FIELD
The objectives of that field work are the following:
1. To understand the principles of differential leveling.
2. To determine the elevations of points along a road.
3. To learn the proper use of a leveling instrument and leveling staff.
4. To calculate reduced levels using field observations.
5. To assess the accuracy of measurements through arithmetic checks.
6. To gain practical experience in field surveying procedures.
3. INSTRUMENTS AND EQUIPMENT USED ON
FIELD LEVELLING
The following instruments and equipment were used:
•
Automatic Level (Dumpy Level)
•
Leveling Staff
•
Tripod Stand
•
Measuring Tape
•
Markers
•
Plumb bomb
2page
•
Field Book
•
Pen
•
Personal Protective Equipment (PPE)
4. Procedure Followed in levelling ground
1. The leveling instrument was set up on a tripod at a suitable position with a clear view
of the survey points.
2. The instrument was carefully leveled using the foot screws and bubble level.
3. A benchmark (BM) with known elevation was selected as the starting point.
4. A backsight (BS) reading was taken on the benchmark to establish the height of
instrument (HI).
5. Intermediate sight (IS) readings were taken on selected points along the road.
6. Where necessary, foresight (FS) readings were taken before relocating the instrument.
7. The instrument was moved to a new position and another BS reading was taken on the
turning point (TP).
8. The process continued until all required points along the road were observed.
9. All readings were recorded in the field book for later computation.
3page
Back
Sight
Chainage
Point(m)
INSTRUMENT(dm)
(BS)(dm)
0+00
Intermediate
Sight
(IS)(dm)
1.58
0+15
0+30
0+45
0+60
0+75
0+90
0+120
0+135
4page
HEIGHT OF
REDUCED BENCH
LEVEL(dm) MARK
(FS)(dm)
16384.58
16383 BM=16383
1.08
16383.50 IS1
2.12
16382.46 IS2
3.40
16381.18 IS3
3.51
16381.07 IS4
3.10
16381.48 IS5
6.39
16378.19 IS6
7.08
16377.50 IS7
8.99
16375.59 IS8
8.70
16375.88 IS9
10.03
16374.55 IS10
9.21
16375.37 IS11
12.41
16372.17 IS12
13.11
16371.47 IS13
12.09
16372.49 IS14
15.00
16369.58 IS15
14.75
16369.83 IS16
15.10
16369.48 IS17
16.20
16368.38 IS18
8.10
0+105
Fore
Sight
15.58 16377.10
CHANGE
16369.00 POINT
9.73
16367.37 IS1
9.50
16367.60 IS2
9.81
16367.29 IS3
10.80
16366.30 IS4
10.29
16366.81 IS5
10.50
16366.60 IS6
11.40
16365.70 IS7
11.15
16365.95 IS8
11.52
16365.58 IS9
0+150
0+165
0+180
0+195
0+210
5page
13.22
16363.88 IS10
16.30
16360.80 IS11
13.08
16364.02 IS12
18.60
16358.50 IS13
18.10
16359.00 IS14
22.22
16354.88 IS15
21.56
16355.54 IS16
21.52
16355.58 IS17
23.05
16354.05 IS18
22.62
16354.48 IS19
23.20
16353.90 IS20
24.01
16353.09 IS21
23.80
16353.30 IS22
24.00
16353.10 IS23
0+225
25.50
16351.60 IS24
25.47
16351.63 IS25
14.5
0+240
0+255
0+270
0+285
0+300
0+315
0+330
25.25 16366.35
13.85
16352.50 IS1
13.78
16352.57 IS2
13.75
16352.60 IS3
14.53
16351.82 IS4
14.25
16352.10 IS5
14.01
16352.34 IS6
22.25
16344.10 IS7
21.98
16344.37 IS8
21.98
16344.37 IS9
31.27
16335.08 IS10
31.60
16334.75 IS11
32.00
16334.35 IS12
31.50
16334.85 IS13
31.39
16334.96 IS14
32.00
16334.35 IS15
33.85
16332.50 IS16
33.15
16333.20 IS17
32.62
16333.73 IS18
38.85
16327.50 IS19
35.00
16331.35 IS20
35.86
16330.49 IS21
42.30
16324.05 IS22
5.62
0+345
0+360
6page
CHANGE
16351.85 POINT
42.23 16329.74
CHANGE
16324.12 POINT
5.61
16324.13 IS1
5.68
16324.06 IS2
9.33
16320.41 IS3
9.10
16320.64 IS4
8.60
16321.14 IS5
9.20
16320.54 IS6
0+375
0+390
0+405
0+425
0+440
0+455
0+460
0+475
8.42
16321.32 IS7
8.75
16320.99 IS8
24.40
16305.34 IS9
24.60
16305.14 IS10
22.72
16307.02 IS11
23.61
16306.13 IS12
23.90
16305.84 IS13
23.12
16306.62 IS14
24.46
16305.28 IS15
25.20
16304.54 IS16
25.38
16304.36 IS17
26.81
16302.93 IS18
27.05
16302.69 IS19
25.89
16303.85 IS20
27.26
16302.48 IS21
28.00
16301.74 IS22
28.20
16301.54 IS23
29.30
16300.44 IS24
29.52
16300.22 IS25
28.80
16300.94 IS26
31.65
16298.09 IS27
31.53
16298.21 IS28
31.70
TOTAL
SUM
29.80
16298.04 IS29
114.76
CHECH arithmetic = ( ∑π΅π−∑πΉπ) = (πΏπ΄ππ π
πΈπ·ππΆπΈπ· πΏπΈππΈπΏ−πΉπΌπ
ππ π
πΈπ·ππΆπΈπ· πΏπΈππΈπΏ)
-84.96= -84.96
5. Data analysis and Calculation (computation)
The Height of Instrument (HI) method was used in the calculations.
Formulae Used
Height of Instrument (HI)
π―π°=πΉπ³+π©πΊ
7page
Reduced Level (RL) πΉπ³=π―π°−π°πΊ
or
πΉπ³=π―π°−ππΊ
6. Problems Encountered and Solutions
Problem Encountered
Solution Applied
Uneven ground affecting tripod
stability
Tripod legs were firmly pressed into the ground
8page
Difficulty in reading staff graduations Staff was held vertically and readings verified
Bright sunlight causing visibility
problems
Readings were taken carefully and rechecked
Possibility of recording errors
Observations were repeated and arithmetic checks
performed
7. RESULTS
The leveling survey successfully determined the elevations of points along the
selected road section. The reduced levels showed a gradual decrease in elevation from
the benchmark to the ending point, indicating a downward slope along the road
alignment.
The final reduced level obtained at the end point was 16298.04 dm, compared to the
benchmark elevation of 16383 dm. Arithmetic checks confirmed that the data was
consistent and free from computational errors. No major adjustments were required
because the closing check balanced correctly.
8. CONCLUSION
The road leveling practical provided valuable experience in the use of leveling
equipment and surveying techniques. The exercise demonstrated the importance of
accurate observations, proper instrument setup, and careful recording of field data.
Through this practical, important skills were gained in determining elevations,
calculating reduced levels, and checking the accuracy of survey measurements. In
future surveys, greater attention can be given to minimizing observational errors and
ensuring precise staff positioning. Overall, the exercise was successful and achieved
its objectives.
9. REFERENCES
1. Bannister, A., Raymond, S., & Baker, R. (2018). Surveying (8th Edition). Pearson
Education.
2. Uren, J., & Price, W. (2015). Surveying for Engineers. Palgrave Macmillan.
3. Schofield, W., & Breach, M. (2017). Engineering Surveying (7th Edition). Routledge.
4. Lecture Notes on Engineering Surveying, Department of Civil Engineering.
10.
In-text Paragraph Citation Examples
ο’ Road leveling is used to determine differences in elevation between points along a
road alignment (Schofield & Breach, 2017).
9page
ο’ Accurate leveling is essential for the design and construction of transportation
infrastructure (Uren & Price, 2015).
ο’ Proper field procedures contribute significantly to the accuracy of surveying
results (Bannister et al., 2018).
11.Appendixes:
Images: Shows Student adjusting Dampy Level and instruments.
10page