HODREAL FIT-OUT & CONSTRUCTION
Purok 1, San Miguel Sto. Tomas Batangas
HODCON CONSTRUCTION MANAGEMENT
REQUEST FOR INFORMATION (RFI)
RECEIVING COPY
PROJECT NAME :
LOCATION :
FSCI CANTEEN STRUCTURAL
FSCI INDUSTRIAL PARK
FROM:
HODCON
TO:
ENGR. ERICKNEIL REALUYO
DATE :
JULY 22,2026
RFI NO.:
RFI-002
DOCUMENTS
DISCIPLINE
ARCHITECTURAL
ELECTRICAL
FIREPRO /FDAS
MECHANICAL
PLUMBING
OTHERS, PLS. SPECIFY:
STRUCTURAL
PRIORITY
HIGH PRIORITY
LOW PRIORITY
MEDIUM PRIORITY
NOT PRIORITY
REASON FOR REQUEST FOR APPROVAL
CONSULTANT DESIGN DOCS
SITE CHANGE
CONTRACTOR'S PROPOSAL
SHOP DRAWING
TES REPORT
DRAWING FOR CONSTRUCTION
INSTALLATION & INSPECTION
CLIENT CHANGE
TENANT CHANGE
SITE VISIT
DESIGN CHANGE
OTHER-PLS. SPECIFY
DESCRIPTION
KINDLY SEE ATTACHED RFI-WHY IS THAT THERES NO NEED TO PROVIDE BOLTED CONNECTION IN SOME AREAS OF THE BEAM PARTICULARLY THOSE HIGHIGHTED GREEN
IN THE PLAN. THESE ARE OVERHANG BEAMS AND THE BEAM AT THE PERIMETER OF THE STAIR.
CONTRACTOR'S OR AUTHORIZED REPRESENTATIVE'S SIGNATURE
PREPARED BY:
NOTED BY:
Robert M. Marticio
7/22/2026
Name/Signature
Andres G. Hodreal
Date
Position:
Name /Signature
7/22/2026
Date
Position:
CONSULANT OR AUTHORIZED REPRESENTATIVE'S SIGNATORIES
NOTED BY:
ACKNOWLEDGE BY:
July 22, 2026
Engr. Erickneil D. Realuyo
Name/Signature
Position:
Structural Engineer
Date
Name/Signature
Date
Position:
CLIENT'S / CONSULTANT REMARKS
Maybe this was just overlooked. Connection plates and bolts are needed to all connections with
design similar to other existing ones.
PAGE 1 OF 2
PROPOSED FOUNDATION PLAN
PROPOSED GROUND FLOOR PLAN
WHY IS THAT THERES NO NEED
CONNECTION BOLT
IN THIS HIGHLIGHTED PORTION
OF THE BEAM
-“A JAPANESE QUESTION”
CORBEL
* Follow the most recent approved design by Structural Engr.
PLATE CONNECTION
TO ASSIGN IF CORBEL
CONNECTION OR PLATE
CONNECTION?
RFI-WHY IS THAT THERES NO
NEED TO PROVIDE BOLT
CONNECTION IN THIS BEAMS?.
VERIFY TO STRUCTURAL
ENGINEER.
(HIGHLIGHTED GREEN