MIXED-USE COMMERCIAL
BUILDING DESIGN
Sara Hakim, Matteo Marinelli, Deep Patel, Prasad Shah, Caitlin Tomotsugu
MOTIVATION
The goal of our project was to provide a complete structural design and analysis of an 8 story building with 4
levels of underground parking. Initially, 2 unique alternatives were proposed for the design of the building:
concrete members with concrete shear walls or composite members with steel braced frames. After extensive
research into constructability and limitations due to architectural restrictions, the concrete alternative was
chosen for the design. The design of the slabs, columns, shear walls, basement walls, and foundation were
conducted through a variety of softwares and hand calculations to adhere to necessary design code and
architectural requirements.
LOADS
SLABS
Using the National Building Code of Canada 2015, the dead and live loads were
added to the floors based on the use of the area. Snow load was calculated and
added to the roof and terrace areas. Lateral loading (wind and earthquake loads)
was calculated based on the static procedures as per sections 4.1.7.2 for wind
and 4.1.8.7 for earthquake.
The design includes two standard slabs utilized for underground parking and
floors three through eight. The ground floor, second floor, and roof feature
unique designs. A transfer slab was necessary for the second floor due to a
change in the orientation of shear walls from the ground floor. To guarantee the
structural integrity of the reinforcement plans, detailed calculations were
performed in strict compliance with CSA A23.3 Code standards. Reinforcement
was achieved using rebar to manage flexural stresses, while drop panels were
incorporated to address punching shear. Additionally, considerations for longterm deflection were made to enhance the durability of the slabs.
Top Reinforcement
(Upper)
Bottom Reinforcement
(Upper)
15M @ 285mm
20M @ 165mm
15M @ 220mm
20M @ 180mm
15M @ 250mm
20M @ 285mm
15M @ 250mm
20M @ 155mm
15M @ 300mm
20M @ 125mm
15M @ 285mm
20M @ 250mm
15M @ 200mm
20M @ 300mm
15M @ 300mm
20M @ 300mm
*The top reinforcement (lower) for all sections is 15M @ 200mm
**The bottom reinforcement (lower for all sections is 20M @ 100mm
COLUMNS
The columns play a vital role as part of the gravity system. This building incorporated
both concrete and steel columns. Steel columns vary and are only located in the
mechanical penthouse. The architectural plan was consulted for locations and shapes
of the columns, but sizing was based on loading found through the ETABS model. The
sizing and reinforcement of the columns were in conformance with CSA A23.3-19. The
columns were designed by hand calculations and SPColumn software.
Column
Dimensions (mm)
FOUNDATION
The foundation system consists of strip footings, isolated footings, and
combined footings. The footings were designed based on the axial loads
from the ETABS model. The basement walls were subjected to the soil
pressure and a surcharge load found in the geotechnical report and
modeled as a continuous beam with pinned-pinned supported end
conditions. Hand calculations and SAP2000 were used to design the
members.
575 ⌀
625 ⌀
SHEAR WALLS
775x600
CONCLUSION
A calculation for the embodied carbon within the structure was completed for the
concrete and steel. The CO2 emissions were calculated using the Structural Carbon
Tool produced by the Institution of Structural Engineers. The resulting CO2 emissions
were 394 kgCO2e/m^2 for upfront emissions released during construction and 419
kgCO2e/m^2 for whole life-cycle emissions from construction to deconstruction.
The shear wall system was designed through the simplified method using
hand calculations. When comparing all the individual rectangular sections
in the shear wall group, the layout with the highest density of rebar was
distributed to the entire group. Shear and moment were calculated using
the seismic forces from the ETABS model as it was the governing lateral
load.
Shear Wall Moment
Reinforcement
25M @ 100mm
The cost was based solely on material costs for concrete, rebar, steel, and excavation.
These values were derived from industry standard costs for volume of concrete,
excavation, and mass of steel. As a result, the material cost was in line with buildings
of similar design.
30M @ 100mm
30M @ 500mm
*All shear reinforcement is the
minimum of 15M @ 500mm
**All wall are 500 mm thick
Cost Breakdown
Excavation $3,228,634.50
Slabs $2,212,368.39
Columns $168,495.12
Walls $1,327,811.64
Beams $1,261,977.57
SUM =
$8,199,287.23
SUM + 13% Tax =
$9,265,194.57
Future Adjustment Cost (+15%)= $10,654,194.76
ACKNOWLEDGEMENTS
Thank you to the following for the support throughout the project:
Alex Hu - PhD, P.Eng
Alex Bruce - P.Eng
Mohamed Abdelwahab - G.A