300mm diameter spun pile
NO
3,987
0.00
400mm diameter spun pile
NO
1,618
0.00
200mm x 200mm precast concrete piles
NO
357
0.00
Preparing and form concrete Grade 30 plug to
precast prestress spun pile heads; complete with 5
nos. of 12mm diameter high tensile steel starter bars
with top end bend into pile caps (measured
separately) and bottom end tack-welded to 1.5mm
thick mild steel plate and roughen up internal face of
spun pile, all as per Engineer's Drawing 300mm
Diameter spun piles
NO
3,987
0.00
Preparing and form concrete Grade 30 plug to
precast prestress spun pile heads; complete with 5
nos. of 12mm diameter high tensile steel starter bars
with top end bend into pile caps (measured
separately) and bottom end tack-welded to 1.5mm
thick mild steel plate and roughen up internal face of
spun pile, all as per Engineer's Drawing 400mm
Diameter spun piles
NO
1,618
0.00
Description
Rate
Amount
WORK BELOW LOWEST FLOOR FINISH
PILING
Cut-off and strip head of precast concrete piles to
required level and dispose surplus piles of
varying lengths on or off site as directed
including bend back reinforcement for connection
Pile Plug
To Collection (RM) RM
1 of 7
Item
Description
Unit
Qty
Rate
Amount
M3
10,639
-
WORK BELOW LOWEST FLOOR FINISH (CONT'd)
EXCAVATION
Excavate oversite to reduced level, commencing
from existing platform level, get out, part return,
fill in and ram, deposit, spread, well compacted to
form sub-grade and level remove surplus
excavated materials as described to Contractor's
own dump site
A
Maximum depth exceeding 0.25m deep but not
exceeding 1.00m deep
Excavate pits from reduced level for pile caps,
footings, column and stanchion bases and the
like; get out; part return; levelling or grading and
ramming of bottoms; trimming sides; planking
and strutting; and disposal of surplus excavated
materials from site (Provisional)
B
Excavate for pile cap; not exceeding 1.00m deep
M3
4,867
-
C
Ditto; exceeding 1.00m but not exceeding 2.00m deep
M3
2,195
-
M3
592
-
M2
21,684
-
Excavate for trenches commencing from reduced
level, get out, part return, fill in and ram, deposit,
spread and level, remove surplus excavated
materials as described to Contractor's own dump
D
Excavate for ground beam; not exceeding 1.00m
deep
Crusher run and the like as described; spread,
levelled and compacted in layers and rolled as
described
E
Beneath ground slab; 300mm thick
Lean concrete Grade 15; spread and levelled as
blinding
F
50mm thick under pile cap (Provisional)
M2
2,976
-
G
50mm thick under raft slab
M2
1,130
-
H
50mm thick under ground slab
M2
21,684
-
2 of 7
Item
Description
Unit
Qty
Rate
Amount
To Collection (RM) RM
M3
M3
M3
M3
M3
2,813
322
934
283
2,770
-
M3
167
-
Kg
Kg
Kg
Kg
21,889
157,848
1,927
95,585
-
Kg
Kg
Kg
92,553
53,999
89,113
-
Kg
45,756
-
Kg
Kg
47,965
78,422
-
Kg
5,798
-
WORK BELOW LOWEST FLOOR FINISH (CONT'd)
Vibrated reinforced concrete Grade 30 as
described in: - (CONT'd)
A
B
C
D
E
Pile caps (Provisional)
Column stump
Ground beams
Raft slabs
Ground slabs
Vibrated reinforced concrete Grade 25 as
described in: -
F
Water tank plinth
High tensile rod reinforcement to B.S. 4449 as
described in: Pile cap (Provisional)
G
H
J
K
10mm Diameter bar as links
16mm Diameter bar
20mm Diameter bar
25mm Diameter bar
Column stump (Provisional)
L
M
N
10mm Diameter bar as links
16mm Diameter bar
20mm Diameter bar
Raft slabs
P
16mm Diameter bar
Ground beams
Q
R
10mm Diameter bar as links
16mm Diameter bar
Water tank plinth
S
10mm Diameter bar as links
3 of 7
Item
Description
Unit
Qty
Rate
Amount
To Collection (RM) RM
Kg
14,981
-
M2
45,440
-
M
10,683
-
M2
2,196
-
M2
M2
M
M
M
1,619
564
10,720
479
1,504
-
WORK BELOW LOWEST FLOOR FINISH (CONT'd)
High tensile rod reinforcement to B.S. 4449 as
described in: - (CONT'd)
Water tank plinth (CONT'd)
A
12mm Diameter bar
Fabric Reinforcement
Steel fabric reinforcement as described; cut to
size; M.S. 145/B.S. 4483:1973; well lapped at
joints; including bending fabrics and notching
around obstructions (measured nett - no
allowance made for laps) :Ground slabs
B
BRC No. A6 (min. 2.22kg/m2)
Sawn formwork as described to
C
D
E
F
G
H
J
Sides of pile cap (Provisional); exceeding 500mm
high but not exceeding 1000mm high
Sides of pile cap (Provisional); exceeding 1000mm
high
Sides of column stump
Sides of water tank plinth
Sides of ground beams; 250mm-500mm high
Edge of raft slabs; not exceeding 250mm high
Edge of ground slabs; not exceeding 250mm high
Sundries
Supply and lay 0.25mm thick approved heavy duty
polythene damp proof membrane; well lapped at
joints; 150mm minimum lap; laid strictly in
accordance with the manufacturer's instructions
(measured nett - no allowance made for laps)
K
To receive raft slabs (Provisional)
M2
1,130
-
L
To receive ground slabs
M2
21,684
-
4 of 7
Item
Description
Unit
Qty
Rate
Amount
To Collection (RM) RM
M2
ITEM
25,367
0.00
0
By Others
WORK BELOW LOWEST FLOOR FINISH (CONT'd)
Sundries (CONT'd)
Prepare and apply approved equivalent 4 stage
anti-termite chemical treatment as described. (The
Tenderer shall also allow for a warranty period of
5 years commencing from the date of Practical
Completion including annual inspection and
subsequent retreatment if necessary)
A
To all soil in contact with the building structure
Builder's Work In Connection With M&E Services
B
Sealing voids in slabs between inserts, bolts, sleeves, ITEM
etc. and the building structure; with concrete;
complete with reinforcement and dowel bars morticed
into edges of slabs; including filling, grouting and
making good under lift shaft entrance sills, around lift
entrance door ways and casings for buttons,
indicators and such openings, chases and the like; all
to the Engineer's details and approval (The
Nominated Sub-Contractor shall supply the inserts,
bolts, sleeves, etc. and will locate for the Main
Contractor the correct positions of these fittings.)
Others Items Not Specified
Allow and provide here for works not covered by
the foregoing items but are either indicated on the
Drawings or which the Contractor deemed
necessary for the proper execution and
completion of the Works (if this item is left
unpriced, it shall be deemed that all works have
been included and allowed for in the overall
tender price and no subsequent claims for extra
payment arising from the works due to the lack of
knowledge or any omission of incidental /
ancillary / obvious works will be entertained)
A
Power Float with OPC for Slab Concrete works
C
M2
ITEM
100mm thk Gravel; spread, levelled and compacted M2
ITEM
in layers and rolled as described
m
Saw cut 6mm for slab construction joint.
D
d) .......................................
B
ITEM
24,424
-
19,821
-
0
0
Rate Only
-
5 of 7
Item
Description
Unit
Qty
Rate
Amount
To Collection (RM) RM
FRAME
Vibrated reinforced concrete Grade 30 as
described in: A
Beam stump (to receive steel column)
M3
160
-
B
Beam stump (internal DC)
M3
1,424
-
High tensile rod reinforcement to B.S. 4449 as
described in: Beam stump (to receive steel column)
(Provisional)
C
10mm Diameter bar as links
Kg
13,174
-
D
16mm Diameter bar
Kg
9,383
-
E
20mm Diameter bar
Kg
206
-
Beam stump (internal DC) (Provisional)
A
10mm Diameter bar as links
Kg
56,625
-
B
16mm Diameter bar
Kg
9,619
-
C
20mm Diameter bar
Kg
52,661
-
Sawn formwork as described to
D
Sides of beam stump (to receive steel column)
M2
1,215
-
E
Sides of beam stump (internal DC)
M2
6,517
-
6 of 7
Item
Description
Unit
Qty
Rate
Amount
To Collection (RM) RM
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
22.00
38.00
328.00
8.00
136.00
390.00
4.00
100.00
32.00
104.00
68.00
86.00
34.00
4.00
6.00
4.00
2.00
4.00
FRAME
Others Items Not Specified
Allow and provide here for works not covered by
the foregoing items but are either indicated on the
Drawings or which the Contractor deemed
necessary for the proper execution and
completion of the Works (if this item is left
unpriced, it shall be deemed that all works have
been included and allowed for in the overall
tender price and no subsequent claims for extra
payment arising from the works due to the lack of
knowledge or any omission of incidental /
ancillary / obvious works will be entertained)
Supply and install YM plate comes with rebar
including all necessary works as per details drawing
INOV-2509-ACME-SWG-DC-YM-DT-01
YM 01
YM 02 & 08
YM 03
YM 03a
YM 04
YM 05
YM 05a
YM 06
YM 07
YM 09
YM 10 & 12 & 17 & 18
YM 11
YM 13 & 14
YM 15
YM 16
YM 19 & 22
YM 20 & 21
YM 23
To Collection (RM) RM
-
-
7 of 7