Testing Plan for ESD Flooring
Surface Resistance Testing
STONCOR MIDDLE EAST LLC
Testing Plan for ESD Flooring
Surface Resistance Testing Procedure Using Megger MIT410
Document Title
Testing Plan — Surface Resistance Testing of ESD Flooring
Method / Standard
Point-to-Point Surface Resistance Test using Megger MIT410
Project Name
TIP 10406-Design and Construction of F06.3, F18.1, F24 & F25
Reference
Surface resistance testing methodology (site demonstration)
Revision
Rev 0
Date
8 July 2026
1. Purpose and Scope
This Testing Plan defines the methodology for verifying the electrical performance of
conductive / static dissipative (ESD) flooring systems by measuring point-to-point surface
resistance. Testing is carried out using a Megger MIT410 insulation resistance tester
together with two standard conductive floor test electrodes.
The plan establishes the equipment, preparation, test procedure, sampling and acceptance
criteria to be applied consistently across all designated flooring areas.
2. Acceptance Criteria (Summary)
The flooring system shall comply with the following requirements:
Parameter
Requirement
Resistance Value
As per specification
Test voltage
100 V (applied consistently throughout)
Electrode spacing
900 mm (3 ft) centre-to-centre
3. Equipment Required
1.
Megger MIT410 resistance tester.
2.
Two conductive floor test electrodes (typically 2.5 kg / 5 lb electrodes).
3.
Test leads.
4. Clean lint-free cloth.
5.
Test record sheet.
4. Pre-Test Inspection and Preparation
4.1 Environmental Conditions
Record the following before and during testing:
•
Ambient temperature.
•
Relative humidity.
•
Date and time of testing.
Stoncor Middle East LLC | Rev 0
Page 1 of 4
Testing Plan for ESD Flooring
Surface Resistance Testing
Avoid testing immediately after:
•
Floor washing.
•
Wet cleaning.
•
Water spills.
•
Chemical contamination.
The floor surface must be clean and dry.
4.2 Cleaning of Test Locations
Prior to testing:
1.
Select the test locations.
2.
Remove all loose dust and debris from the floor surface.
3.
Wipe the test spots using a clean lint-free cloth.
Note: Dust, dirt, oil, wax and other contaminants can significantly affect resistance readings and
lead to inaccurate results.
4.3 Cleaning of Electrodes
Before every test:
1.
Inspect the conductive rubber faces of both electrodes.
2.
Remove any dust, dirt or residue from the electrode surfaces using a clean cloth.
3.
Ensure the contact surfaces are dry and free from contamination.
5. Electrode Placement
Point-to-Point Surface Resistance Test
1.
Place the two electrodes directly on the floor surface.
2.
Ensure full contact between the electrode and the floor.
3.
Maintain a distance of 900 mm (3 ft) between the centres of the two electrodes.
This electrode spacing is commonly used for ESD flooring resistance measurements in
accordance with industry practice.
Avoid:
•
Floor joints.
•
Cracks.
•
Surface defects.
•
Areas with standing water or contamination.
6. Megger MIT410 Setup
1.
Verify the battery condition of the MIT410.
2.
Connect one test lead to each electrode.
3.
Turn the selector switch to the resistance / insulation resistance test function.
4. Select the test voltage to 100 V.
The same voltage should be used consistently throughout the testing programme.
Stoncor Middle East LLC | Rev 0
Page 2 of 4
Testing Plan for ESD Flooring
Surface Resistance Testing
7. Test Procedure
1.
Confirm that both electrodes are correctly positioned.
2.
Ensure nobody is touching the electrodes, test leads, or floor area being measured.
3.
Press and hold the TEST button.
4. Allow the reading to stabilise (typically 10–15 seconds).
5.
Record the resistance value displayed on the instrument.
6. Release the TEST button once the reading is stable.
7. Repeat at all designated test locations.
8. Number of Test Locations
As a minimum:
•
Test at least 10 locations per continuous flooring area.
9. Precautions During Testing
DO
DO NOT
✔ Clean the floor test locations before testing.
✖ Place electrodes on dusty surfaces.
✔ Clean electrode contact surfaces before
✖ Test on wet flooring.
each test sequence.
✖ Stand between or touch the electrodes
✔ Ensure the floor is dry.
during testing.
✔ Maintain the specified 900 mm (3 ft)
✖ Move the electrodes while the test is in
electrode spacing.
progress.
✔ Allow the reading to stabilise before
✖ Test directly over joints, cracks, or damaged
recording.
flooring.
✔ Record environmental conditions.
✖ Use contaminated or damaged electrodes.
✔ Perform testing using calibrated
equipment.
Stoncor Middle East LLC | Rev 0
Page 3 of 4
Testing Plan for ESD Flooring
Surface Resistance Testing
Appendix A — Test Record Sheet
Complete one record sheet per continuous flooring area. Reproduce additional rows as
required to cover all designated test locations.
Project
Area / Zone
Ambient Temp.
Relative Humidity
Date / Time
Instrument / Serial
Tested By
Calibration Due
Loc. No.
Location / Grid Ref.
Reading (Ω)
Service
(110V / 220V)
Remarks
1
2
3
4
5
6
7
8
9
10
Acceptance: Average resistance for the area must satisfy 25,000 Ω < R < 1,000,000 Ω (1 MΩ). Areas with 110 V
services > 5,000 Ω; areas with 220 V services > 10,000 Ω.
Tested By: ______________________
Stoncor Middle East LLC | Rev 0
Witnessed By: ______________________
Page 4 of 4