THERMALL ENGINEE
ERING
PRODUCT
T SERVICE
E
TILL 1848
21 MA
AY 2012
Compliance C
Category – S
Timing Code - 4
TECHNIICAL INF
FORMATTION LE
ETTER
FF-CLASS DIFFUSER
D
AND
A
DIFFU
USER INNER BARREEL ACCESSS POINTS
A
APPLICATIO
ON
A
All 9F.01/9F.02
2/9FA.01/9FA.0
02/9FA.03/9FB
B.01 gas turbin
ne units
P
PURPOSE
TTo alert users of the safety risks
r
associate
ed with using the 9FA and 99FB aft diffuseer struts as acccess points to
o the inner
b
barrel and to require use of the
t proper points of entry th
hrough the diff
ffuser end cap
p and HRSG.
C
Compliance Category
ptional
O - Op
Identifies changes that m
may be beneficial to some, but not nece
essarily all,
operators. Accomplishme
A
ent is at custom
mer's discretio
on.
M - Maintenance
Identifies ma
aintenance gu
uidelines or b
best practices for reliable e
equipment
operation.
C - Co
ompliance Req
quired
Identifies the
e need for acttion to correctt a condition that, if left un
ncorrected,
may result in
n reduced equ
uipment reliab
bility or efficien
ncy. Compliance may be
required with
hin a specific o
operating timee.
A - Ale
ert
Failure to co
omply with thee TIL could reesult in equipm
ment damage
e or facility
damage. Co
ompliance is m
mandated with
hin a specific o
operating time
e.
S – Sa
afety
Failure to co
omply with thi s TIL could reesult in person
nal injury. Com
mpliance is
mandated within
w
a specificc operating tim
me.
T
Timing Code
1
Prior
P
to Unit Sttartup / Prior to
o Continued Operation
O
(forcced outage condition)
2
At
A First Opporttunity (next shutdown)
3
Prior
P
to Operattion of Affected System
4
At
A First Exposu
ure of Compon
nent
5
At
A Scheduled Component
C
Pa
art Repair or Replacement
R
6
Next
N
Scheduled Outage
© 2012 Gen
neral Electric Com
mpany
TThe proprietary in
nformation published in this Techn
nical Information Letter is offered to you by GE in consideration of its ongoing saless and service
re
elationship with your
y
organization. However, since the operation of your plant involvves many factors not within our kn
nowledge, and sin
nce operation
o
of the plant is in
n your control an
nd ultimate respo
onsibility for its continuing succeessful operation rests with you, GE specifically d
disclaims any
re
esponsibility for liability based on claims for damag
ge of any type, i.e
e. direct, consequuential or special that may be alleged to have been
n incurred as
re
esult of applying this information regardless
r
of whe
ether it is claimed that GE is strictly liable, in breach o
of contract, in bre
each of warranty, negligent, or
iss in other respectss responsible for any
a alleged injuryy or damage susta
ained by your orgganization as a ressult of applying th
his information.
TThis Technical Info
ormation Letter contains
c
proprieta
ary information of
o the General Eleectric Company, USA and is furnisshed to its custom
mer solely to
a
assist that custom
mer in the installattion, testing, opera
ation and/or main
ntenance of the eequipment describ
bed. This docume
ent shall not be re
eproduced or
d
distributed in whole or in part nor shall
s
its contents be
b disclosed to an
ny third party withhout the written a
approval of GE En
nergy Services Eng
gineering. All
rights reserved.
T-40211203-2014-200086 A, approuvé le 01/01/2014 est issu de la GED
TIL 1848
B
BACKGROUND DISCUSS
SION
TThe exhaust aft
a diffuser is located
l
betwe
een the exhau
ust frame and
d the A042 du
uct. The aft diiffuser has thrree hollow
sstruts which connect the difffuser outer barrel
b
to the diffuser inner b
barrel. Two of the struts serrve as conduitts to route
N
No. 2 bearing lube oil piping and accesssory equipm
ment piping fro
om the innerr barrel out to the balance of plant
cconnections. The
T third strut acts as a ventt and is left em
mpty. Recent eevidence obtained by GE sho
ows personnel are using
tthe empty stru
ut to access the inner barrel as shown in Figure
F
1.
Figure 1:
Aft diffuserr strut being used
u
to a acceess inner barrrel – NOT APPR
ROVED
TThe aft diffuse
er and inner ba
arrel are classsified as confin
ned spaces. Th
he empty stru
ut does not me
eet GE specificcations for
e
entry or egresss and could ca
ause a safety concern
c
in the
e event of a sitte emergency.. The proper entry point is th
hrough the
e
end cap accesss at the aft end
e of the Inn
ner barrel sho
own in Figure 2, which requ
uires accessin
ng another access point
ttypically locate
ed in the HRSG
G as shown in in Figure 3. Depending
D
on tthe manufactturer, the precise location in
n the HRSG
m
may vary.
Figure 2:
Diffuser in
nner barrel en
nd cap accesss point
© 2012 Gen
neral Electric Com
mpany
TThis Technical Info
ormation Letter contains
c
proprieta
ary information of
o the General Eleectric Company, USA and is furnisshed to its custom
mer solely to
a
assist that custom
mer in the installattion, testing, opera
ation and/or main
ntenance of the eequipment describ
bed. This docume
ent shall not be re
eproduced or
d
distributed in whole or in part nor shall
s
its contents be
b disclosed to an
ny third party withhout the written a
approval of GE En
nergy Services Eng
gineering. All
rights reserved.
Page 2 of 5
T-40211203-2014-200086 A, approuvé le 01/01/2014 est issu de la GED
TIL 1848
Figure 3:
HRSG man-way access to the diffuser
RECOMMENDATIONS
1. Do not use the strut in the exhaust aft diffuser as a human access point to the inner barrel, and instead use the
designed entry points through the HRSG and inner barrel end cap.
2. Follow manufactures instructions for diffuser access and maintenance including use of scaffolding where required.
3. Follow local environmental and safety procedures for accessing and working in confined spaces.
4. Refer to GEK 111309 - GE Product Safety Recommended Best Practices.
This TIL is considered complete when the recommendations in the TIL are incorporated into plant operation and
maintenance procedures.
PLANNING INFORMATION
Compliance
•
•
Compliance Category: S
Timing Code: 4
Manpower Skills
N/A
Parts
None
Reference Documents
GEK 111309 - GE Product Safety Recommended Best Practices
Previous Modifications
None
Scope of Work
N/A
© 2012 General Electric Company
This Technical Information Letter contains proprietary information of the General Electric Company, USA and is furnished to its customer solely to
assist that customer in the installation, testing, operation and/or maintenance of the equipment described. This document shall not be reproduced or
distributed in whole or in part nor shall its contents be disclosed to any third party without the written approval of GE Energy Services Engineering. All
rights reserved.
Page 3 of 5
T-40211203-2014-200086 A, approuvé le 01/01/2014 est issu de la GED
TIL 1848
Contact your local GE Service Manager or Contract Performance Manager for assistance or for additional
information.
Contact your local GE Service Manager or Contract Performance Manager in order to update GE unit record sheets
or to submit as-built drawings for changes incurred by this TIL.
NOTE: If you would like to receive future TILs by email, contact your local GE Service Manager or Contract Performance
Manager for assistance.
© 2012 General Electric Company
This Technical Information Letter contains proprietary information of the General Electric Company, USA and is furnished to its customer solely to
assist that customer in the installation, testing, operation and/or maintenance of the equipment described. This document shall not be reproduced or
distributed in whole or in part nor shall its contents be disclosed to any third party without the written approval of GE Energy Services Engineering. All
rights reserved.
Page 4 of 5
T-40211203-2014-200086 A, approuvé le 01/01/2014 est issu de la GED
TIL 1848
TIL COMPLIANCE RECORD
Compliance with this TIL must be entered in local records. GE requests that the customer notify GE upon compliance of
this TIL.
Complete the following TIL Compliance Record and FAX it to:
TIL Compliance
FAX: (678) 844-3451
Toll free FAX: 1-888-896-TILS (1-888-896-8457)
TIL COMPLIANCE RECORD
For Internal Records Only #
Site Name:
Customer Contact Information
Customer Name:
GE Contact Information
Contact Name:
Contact Name:
Address:
Address:
Email:
Email:
Phone:
Phone:
FAX:
Turbine Serial Number(s):
FAX:
INSTALLED EQUIPMENT
TIL Completed Date:
100% TIL Completed:
Description:
Unit Numbers:
Part Description:
Part Number
MLI Number
Comments:
If there are any redlined drawings that pertain to this TIL implementation, please FAX the drawings along with
this TIL Compliance Record.
NOTE:
FAX this form to:
TIL Compliance
FAX: (678) 844-3451
Toll free FAX: 1-888-896-TILS (1-888-896-8457)
© 2012 General Electric Company
This Technical Information Letter contains proprietary information of the General Electric Company, USA and is furnished to its customer solely to
assist that customer in the installation, testing, operation and/or maintenance of the equipment described. This document shall not be reproduced or
distributed in whole or in part nor shall its contents be disclosed to any third party without the written approval of GE Energy Services Engineering. All
rights reserved.
Page 5 of 5
T-40211203-2014-200086 A, approuvé le 01/01/2014 est issu de la GED
Page d'approbation
TIL 1848 - F-CLASS DIFFUSER AND
DIFFUSER INNER BARREL ACCESS POINTS
Réf. :
Indice : A Date : 01/01/2014 Accessibilité : Interne
Rédacteur(s) :
Vérificateur(s) :
■
Pas de Vérificateur
Approbateur(s) :
■
Migration - 01/01/2014
© EDF -2014. Ce document est la propriété d'EDF. Toute communication, reproduction, publication, même partielle, est interdite sauf autorisation.
T-40211203-2014-200086 A, approuvé le 01/01/2014 est issu de la GED