INSPECTION AND TEST PLAN Rev Created By Checked By Approved By Date Issue Status Sample ITP for Separators ABBREVIATIONS/LEGENDS H HOLD JORD Jord Bellows RA REVIEW AND ENDORSE JORD JORD INTERNATIONAL NA NOT APPLICABLE CLNT xxx R REVIEW W WITNESS I INSPECT AT RANDOM WS WITNESS SAMPLE THEN RANDOM NDE NON DESTRUCTIVE EXAMINATION DFT DRY FILM THICKNESS MT MAGNETIC PARTICLE EXAMINATION RT RADIOGRAPHY TESTING PT PENETRANT TESTING UT ULTRASONIC TESTING MDMT MINIMUM DESIGN METAL TEMPERATURE WPS WELDING PROCEDURE SPECIFICATION PQR PROCEDURE QUALIFICATION RECORD WFT WET FILM THICKNESS TC TEST CERTIFICATE INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators QA/QC ACTIVITY SPECIFICATION STANDARD ACCEPTENCE CRITERIA Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows A CODES AND STANDARDS 1 APPLICABLE CODES AND STANDARDS FOLLOWING EDITIONS (AND ADDENDA AS APPLICABLE) OF CODES & STANDARDS CONSIDERED IN THIS PROJECT API 661/ISO 13706 SIXTH EDITION AS 1200 - 2000 AS 1210 - 1997 (AMD 2002) AS 4037 - 1999 AS 4458 - 1997 (AMD- 1999) AS 3992 - 1998 B GENERAL(AS) 1 DESIGN DATA SHEETS, DESIGN CALCULATIONS AND DRAWINGS CHECK AND ENSURE CLIENT,APPROVAL/ACCEPTANCE PO SUBMIT TO THIRD PARTY INSPECTION AGENCY PO 1.1 INSPECTION AND TEST PLAN SUBMIT TO REGULATORY AUTHORITY FOR DESIGN COMPLIANCE OF PRESSURE VESSEL PO SUBMIT TO CLIENT PO NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE AS1200 AS1210 AE-00-SM-002 AE-00-SM-001 AS 1200 AS 1210 AE-00-SM-002 AE-00-SM-001 AS 1200 AS 1210 CLIENT REVIEWED/ ACCEPTED DOCS H RA RA STAMPED DRAWINGS/ APPROVAL LETTER H NA NA STAMPED DRAWINGS/ APPROVAL LETTER H NA NA AS1200 AS1210 API 661/ISO 13706 AE-00-SM-002 AE-00-SM-001 C2699-ITP RA R R Page 2 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators QA/QC ACTIVITY SPECIFICATION STANDARD SUBMIT TO THIRD PARTY INSPECTION AGENCY PO ACHE1 PV1 SUBMIT TO REGULATORY AUTHORITY C PROCEDURES(AS) 1 QA/QC PROCEDURES AS 1210 AS 4458 ACCEPTENCE CRITERIA AS 1210 AS 4458 API 661/ISO 13706 ACHE1 PV1 AS 1210 AS 4458 API 661/ISO 13706 Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows JN-ITP H NA NA JN-ITP H NA NA C2699-WLDR RA RA R C2699-PWHT RA RA RA C2699-HYDR RA RA R C2699-HARD RA RA R C2699-PANT RA RA R C2699-PACK RA RA R PREPARE FOLLOWING PROCEDURES TO INCLUDE ALL CODE & PROJECT REQUIREMENTS WELD REPAIR PROCEDURE POST WELD HEAT TREATMENT PROCEDURE HYDROSTATIC TEST PROCEDURE AS 4458 AE-00-SM-001 API 661/ISO 13706 AE-00-SM-002 AS 1210 AE-00-SM-001 HARDNESS TESTING PROCEDURE API 661/ISO 13706 AE-00-SM-002 PAINTING PROCEDURE AE-00-SM-002 GP-00-SG-002 PO API 661/ISO 13706 AE-00-SM-002 PACKING, PRESERVATION AND MARKING PROCEDURE NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE AS 3992 AE-00-SM-001 AS 4458 AE-00-SM-001 AS 4037 APPROVED DRAWINGS AE-00-SM-001 API 661/ISO 13706 AE-00-SM-002 AE-00-SM-001 AE-00-SM-002 GP-00-SG-002 API 661/ISO 13706 AE-00-SM-002 Page 3 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators QA/QC ACTIVITY WELDING PROCEDURE QUALIFICATIONS (WPS & PQR) WELDER/OPERATOR QUALIFICATIONS & LIST WELD AND NDT-MAP NON DESTRUCTIVE EXAMINATION PROCEDURES (NDE)RT, UT, MT & PT NDE-OPERATOR QUALIFICATION COMPETENCE OF WELDING SUPERVISOR D MATERIALS FOR ALL PRESSURE AND WETTED PARTS (AS) 1 RECEIPT INSPECTION - STANDARD MILL TC CONFORMS TO EN 10204 3.1 & REQUIREMENTS RESPECTIVE MATERIAL SPEC VISUAL & DIMENSIONAL INSPECTION PHYSICAL IDENTIFICATION OF ORIGINAL MARKINGS WITH MILL TC ULTRASONIC EXAMINATION OF PLATES USED FOR LIFTING LUGS NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE SPECIFICATION STANDARD ACCEPTENCE CRITERIA AS 1210 AS 4458 AE-00-SM-001 AS 1210 AS 4458 AE-00-SM-001 AS 4458 AE-00-SM-001 AS 4458 AS 1210 AE-00-SM-001 AS 4458 AE-00-SM-001 AS 1210 AE-00-SM-001 AS 3992 AE-00-SM-001 AS 1210 AE-00-SM-002 AE-00-SM-001 JORD STANDARD Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows C2699-WPSH RA RA R AS 3992 AS 1796 AE-00-SM-001 APPROVED DRAWINGS AS 4037 AE-00-SM-001 C2699-WQPH R R R C2699-WMAP H R R C2699-NDEP RA RA R AS 4037 AE-00-SM-001 AS 1796 OR EQUIVALENT C2699-NDEQ RA RA R QUALIFICATION/ EXPERIENCE DOC. R R NA AS 4458 AE-00-SM-002 AE-00-SM-001 MILL TC H W WS NDE REPORT R R R PV1 ASTM A435 Page 4 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators 1.1 RECEIPT INSPECTION SUPPLEMENTARY REQUIREMENTS CARBON MAX 0.25% QA/QC ACTIVITY ACCEPTENCE CRITERIA AS 1210 AE-00-SM-002 AE-00-SM-001 ACHE1 PV1 PV1 ACHE1 AS 1210 APPROVED DRAWINGS AS 1210 AE-00-SM-001 HARDNESS TESTING PO NACE MR 0175/ISO 15156 POSITIVE MATERIAL IDENTIFICATION (PMI) INTERGRANULAR CORROSION TESTING OF ALL PLATES, FORGINGS & WROUGHT FITTINGS ACHE1 PV1 ACHE1 PV1 NACE MR 0175/ISO 15156 PV1 AS PER MAT. SPEC FERRITE CONTENT (AS PER ASTM E562) CARBON EQUIVALENT MAX. 0.43% MILL TC RA R R MILL TC/ NDE REPORT MILL TC/ LAB TEST REPORT R R R R R R MILL TC R R R PMI REPORT W WS R ASTM G28 SOLUTION MTC/LAB TEST A FOR 120 HOURS REPORT W R R JORD STANDARD JORD PO MILL TC/ LAB TEST REPORT R R NA PITTING RESISTANCE EQUIV. NO. (PREN) JORD STANDARD JORD PO MILL TC/ LAB TEST REPORT R R NA REVIEW OF TEST CERTIFICATES CHECK INTEGRITY OF PACKING AS 4458 AE-00-SM-001 AS 3992 WORKSHOP PROCEDURE AE-00-SM-001 TC/ WORKSHOP RECORDS R R R ULTRASONIC EXAMINATION OF PLATES CHARPY IMPACT TEST AT MDMT 1.2 WELDING CONSUMABLE SPECIFICATION STANDARD ACHE1 PV1 ASTM A435 Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows MILL TC RA R R AS 1210 PV1 E FABRICATION OF HEADERS (AS) NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE Page 5 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION TRANSFER OF MARKINGS RECEIPT INSPECTION - FORMED HEADS Sample ITP for Separators QA/QC ACTIVITY SPECIFICATION STANDARD WHERE ORIGINAL MARKINGS ARE NOT AS 1210 RETAINED.TRANSFER THE MARKINGS ON CUT AE-00-SM-001 PIECES BY STAMPING (THK 6 MM & OVER) WITH LOW STRESS STAMP OR BY METAL MARKER (BELOW 6MM THK) VERIFY MARKINGS , VISUAL INSPECTION-FREE AS 1210 FROM CRFACKS, DENTS, SCALES & OTHER IMPERFECTIONS.DIMENSIONS-SUCH AS MINIMUM THICKNESS, PROFILE (KNUCKLE & CROWN RADIUS), STRAIGHT FACE, ROUNDNESS AS 4458 CL 4.4.2 AE-00-SM-001 APPROVED DRAWINGS AS 4458 CL 7.2.5 APPROVED DRAWINGS INSPECTION REPORT H WS R HEAT TREATMENT RECORDS WHERE APPLICABLE RT & MT/PT RECORDS WHERE APPLICABLE AS 4037 PV1 AS 4037 PV1 AS 4458 CL 9.5.6 NDE REPORT R R R NDE REPORT R R R VISUAL INSPECTION I I I AS 4458 CL 5.1 AE-00-SM-001 APPROVED DRAWINGS MATERIAL TRACEABILITY RECORD WS WS R AS 4458 CL 5.4 AE-00-SM-001 VISUAL INSPECTION WS I I CONTROL OF WELD CONSUMABLE AS 4458 PV1 AS 4458 PV1 AS 1210 PV1 CONSUMABLE SPECIFIED IN APPROVED WPS SHALL ONLY BE USED.STORAGE & HANDLING SHALL BE AS PER MANUFACTURER RECOMMENDATIONS & WORKSHOP PROCEDURE CUTTING OF PLATE/PIPE/NOZZLES & CUTTING & EDGE PREPARATION SHALL BE AS 1210 ATTACHMENTS DONE BY MACHINING, GRINDING OR THERMAL AE-00-SM-001 CUTTING.IN CASE OF THERMAL CUTTING JOINT SHALL BE GROUND TO SOUND METAL 1.1 EXAMINATION OF CUT EDGES OF PLATE ACCEPTENCE CRITERIA Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows MATERIAL WS WS R TRACEABILITY RECORD VISUAL EXAMINATION OF CUT EDGES FOR LAMINATIONS, CRACKS, GROOVES & OTHER IMPERFECTIONS NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE AS 1210 AE-00-SM-001 Page 6 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators QA/QC ACTIVITY SPECIFICATION STANDARD ACCEPTENCE CRITERIA Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows NDE REPORT WS R R BEVEL EDGES OF PLATES WITH THICKNESS JORD STANDARD GREATER THAN 25 MM SHALL BE EXAMINED BY PV1 MT/PT FOR LINEAR DISCONTINUITIES ASME SA 20 VERIFY NOMINAL INSIDE DIAMETER, CIRCUMFERENCE, ALIGNMENT, PROFILE & CIRCULARITY ENSURE WELD JOINT IN ACCORDANCE WITH APPLICABLE DRAWING & APPROVED WPS. ALL SURFACES TO BE WELDED SHALL BE THOROUGHLY CLEANED OF OXIDE SCALE, OIL OR OTHER FOREIGN SUBSTANCES TO CLEAN METAL SURFACE FOR A DISTANCE OF AT LEAST 12MM FROM EACH WELDING EDGE AS 4458 CL 7.0 & 8.3.1 PV1 AS 4458 CL 8 PV1 INSPECTION REPORT I I I INSPECTION REPORT WS I I 1.3 WELDING OF LONGITUDINAL JOINTS PREHEAT & INTERRUN TEMPERATURE & AS 4458 REMAINING WELDING PARAMETERS SHALL BE AE-00-SM-001 MAINTAINED IN ACCORDANCE WITH QUALIFIED WPS. ENSURE WELDERS REQUIRED QUALIFICATION AS 4458 CL 11 PV1 UPDATED WELD MAP/ TRACEABILITY RECORD W WS I 1.4 NDE OF LONGITUDINAL SEAM AS 4037 CL 8 AS 4458 TABLE 11.1 PV1 VISUAL INSPECTION W WS I ROLLING & FIT-UP OF CYLINDRICAL SECTIONS AS 4458 PV1 AS 4458 CL 8 PV1 COMPLETE WELD VISUAL INSPECTION.ENSURE AS 1210 WELD IS REASONABLY SMOOTH & FREE FROM AS 4458 CL 11.4 SHARP IRREGULARITIES, GROOVES OR PV1 DEPRESSIONS & SHALL MERGE SMOOTHLY INTO THE BASE METAL SURFACE,CHECK HEIGHT OF WELD REINFORCEMENT NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE Page 7 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators QA/QC ACTIVITY 100% MT ON COMPLETED WELDS SPECIFICATION STANDARD ACCEPTENCE CRITERIA JORD STANDARD AS 4037 CL 7 PV1 JORD STANDARD AS 4037 CL 7 PV1 AS 1210 AS 4037 SEC7 PV1 AS 4037 SEC8 NDE PROCEDURES AE-00-SM-001 AS 4037 SEC8 NDE PROCEDURES AE-00-SM-001 AS 4037 SEC8 NDE PROCEDURES PV1 100% UT ON COMPLETED WELDS AS 1210 PV1 ENSURE COMPLETE REMOVAL OF PEAKS & VALLEYS OF LONGITUDINAL WELD BEFORE WELDING WITH NEXT CYLINDERICAL SECTION JORD STANDARD PV1 100% PT ON COMPLETED WELDS Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows NDE REPORT W WS R NDE REPORT W WS R NDE REPORT W WS R AS 4037 SEC8 NDE NDE REPORT PROCEDURES PV1 AS 4458 CL 7.0 & VISUAL 8.3.1 INSPECTION PV1 W WS I I R R 1.8 FIT-UP & WELDING OF PRODUCTION SHALL BE WELDED ALONG WITH PRODUCTION AS 1210 TEST PLATE LONGITUDINAL JOINT USING SAME WELDING PV1 PROCEDURE AND SAME TYPE OF EQUIPMENT AS 4037 CL 6.0 PV1 INSPECTION REPORT H W R 1.9 PWHT OF PRODUCTION TEST PLATE AS 4458 PV1 PWHT GRAPH W RA R AS 3992 CL 10 PV1 LAB TEST REPORT H W RA 100% RT RE-ROLLING OF LONGITUDINAL SECTIONS AS PER APPROVED PWHT PROCEDURE 2 TESTING OF WELD PRODUCTION TEST MECHANICAL TESTING OF PRODUCTION TEST PLATE PLATE NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE EQUIPMENT DATA SHEET/GA DRAWING AS 4458 PV1 AS 1210 AS 4458 PV1 Page 8 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators 1.5 FIT-UP OF CIRCUMFERENTIAL JOINT VERIFY STRAIGHNESS, CIRCUMFERENCE, ALIGNMENT & ORIENTATION OF LONGITUDINAL SEAMS ENSURE WELD JOINT IN ACCORDANCE WITH APPLICABLE DRAWING & APPROVED WPS. ALL SURFACES TO BE WELDED SHALL BE THOROUGHLY CLEANED OF OXIDE SCALE, OIL OR OTHER FOREIGN SUBSTANCES TO CLEAN METAL SURFACE FOR A DISTANCE OF AT LEAST 12MM FROM EACH WELDING EDGE QA/QC ACTIVITY SPECIFICATION STANDARD AS 4458 PV1 AS 4458 CL 8 PV1 ACCEPTENCE CRITERIA AS 4458 CL 7.0 & 8.3.1 PV1 AS 4458 CL 8 PV1 Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows INSPECTION I I I REPORT INSPECTION REPORT WS I I WELDING OF CIRCUMFERENTIAL JOINTS PREHEAT & INTERRUN TEMPERATURE & AS 4458 REMAINING WELDING PARAMETERS SHALL BE AE-00-SM-001 MAINTAINED IN ACCORDANCE WITH QUALIFIED WPS. ENSURE WELDERS REQUIRED QUALIFICATION AS 4458 CL 11 PV1 UPDATED WELD MAP/ TRACEABILITY RECORD W WS I NDE OF CIRCUMFERENTIAL SEAM COMPLETE WELD VISUAL INSPECTION.ENSURE AS 1210 WELD IS REASONABLY SMOOTH & FREE FROM AS 4458 CL 11.4 SHARP IRREGULARITIES, GROOVES OR PV1 DEPRESSIONS & SHALL MERGE SMOOTHLY INTO THE BASE METAL SURFACE,CHECK HEIGHT OF WELD REINFORCEMENT AS 4037 CL 8 AS 4458 TABLE 11.1 PV1 VISUAL INSPECTION W WS I 100% MT ON COMPLETED WELDS AS 4037 SEC8 PROCEDURES AE-00-SM-001 AS 4037 SEC8 PROCEDURES AE-00-SM-001 NDE NDE REPORT W WS R NDE NDE REPORT W WS R 100% PT ON COMPLETED WELDS NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE JORD STANDARD AS 4037 CL 7 PV1 JORD STANDARD AS 4037 CL 7 PV1 Page 9 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION 2.1 FIT-UP & WELDING OF NOZZLE SUBASSEMBLIES (FLANGE TO PIPE) 2.2 NDE OF NOZZLE SUB-ASSEMBLIES Sample ITP for Separators QA/QC ACTIVITY SPECIFICATION STANDARD ACCEPTENCE CRITERIA Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows NDE REPORT W WS R 100% RT AS 1210 AS 4037 SEC7 PV1 AS 4037 SEC8 NDE PROCEDURES PV1 100% UT ON COMPLETED WELDS AS 1210 PV1 AS 4037 SEC8 NDE NDE REPORT PROCEDURES PV1 AS 4458 VISUAL AE-00-SM-001 INSPECTION APPD. WELD MAP, WPS & DRG W WS I W WS I AS 4458 AS 4037 AE-00-SM-001 W WS I JOINT PREPARATION AS PER DRAWING & AND AS 4458 FREE OF RUST, SCALE, MOISTURE, GREASE & AE-00-SM-001 DIRT. JOINT SIZED, MATCHED, ASSEMBLED & ALIGNED AS PER DRAWING. PREHEAT & INTERRUN TEMPERATURE & AS 4458 REMAINING WELDING PARAMETERS SHALL BE AE-00-SM-001 MAINTAINED IN ACCORDANCE WITH QUALIFIED WPS. ENSURE WELDERS REQUIRED QUALIFICATION UPDATED WELD MAP/ TRACEABILITY RECORD COMPLETE WELD VISUAL INSPECTION AS 1210 AS 4037 AE-00-SM-001 AS 4037 SEC8 PROCEDURES AE-00-SM-001 NDE VISUAL INSPECTION W WS I 100% RT (INCLUDING THE LONGITUDINAL SEAM OF THE PIPE FABRICATED FROM PLATE) AS 1210 AS 4037 SEC7 AE-00-SM-001 JORD STANDARD PV1 AS 4037 SEC8 NDE REPORT AE-00-SM-001 NDE PROCEDURES AS 4037 SEC8 NDE NDE REPORT PROCEDURES PV1 W WS R W WS I 100% UT ON COMPLETED WELDS NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE Page 10 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators 2.3 PREPARATION, CUTTING & NDE OF NOZZLE HOLES ON SHELL/HEADS VISUAL EXAMINATION OF CUT EDGES FOR LAMINATIONS, SHEARING CRACKS & OTHER IMPERFECTIONS 100% MT OF EDGES QA/QC ACTIVITY 100% PT OF EDGES 2.4 FIT-UP & WELDING OF NOZZLES TO SHELL/HEAD 2.5 NDE OF NOZZLES TO SHELL/HEAD SPECIFICATION STANDARD AS 1210 AE-00-SM-001 AS 4458 AE-00-SM-001 AS 1210 AS 4458 AE-00-SM-001 AS 1210 AS 4458 AE-00-SM-001 API 661/ISO 13706 AE-00-SM-001 AS 4037 SEC8 PROCEDURES AE-00-SM-001 AS 4037 SEC8 PROCEDURES AE-00-SM-001 ASTM A 435 AE-00-SM-001 100% UT OF 100MM SPAN FROM EDGE OF HOLES FOR LAMINATION (BEFORE & AFTER CUTTING) JOINT PREPARATION AS PER DRAWING & AND AS 4458 FREE OF RUST, SCALE, MOISTURE, GREASE & AE-00-SM-001 DIRT. APPROVED DRAWING JOINT SIZED, MATCHED, ASSEMBLED & ALIGNED AS PER DRAWING. PREHEAT & INTERRUN TEMPERATURE & AS 4458 REMAINING WELDING PARAMETERS SHALL BE AE-00-SM-001 MAINTAINED IN ACCORDANCE WITH QUALIFIED WPS. ENSURE WELDERS REQUIRED QUALIFICATION COMPLETE WELD VISUAL INSPECTION EXTERNAL FILLET WELD REINFORCEMENT SMOOTHLY BLENDED TO CONVEX CONTOUR.NOZZLE DO NOT HAVE INTERNAL PROJECTION SHOULD BE FLUSHED WITH THE INSIDE CONTOUR OF THE VESSEL NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE ACCEPTENCE CRITERIA AS 1210 AS 4037 Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows VISUAL WS I I INSPECTION NDE NDE REPORT WS I I NDE NDE REPORT WS I I NDE REPORT W WS R AS 4458 AE-00-SM-001 APPD. WELD MAP, WPS & DRG VISUAL INSPECTION W WS I AS 4458 AS 4037 AE-00-SM-001 UPDATED WELD MAP/ TRACEABILITY RECORD W WS I AS 4037 SEC 8 AE-00-SM-001 VISUAL INSPECTION W WS I Page 11 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION FIT UP & WELDING OF NOZZLE REINFORCEMENT PADS Sample ITP for Separators QA/QC ACTIVITY SPECIFICATION STANDARD 100% UT ON COMPLETED WELDS AS 1210 PV1 100% MT COMPLETED WELD API 661/ISO 13706 AE-00-SM-001 JOINT SIZED, MATCHED, ASSEMBLED & AS 4458 ALIGNED AS PER DRAWING. ENSURE TELL TALE APPROVED DRAWINGS HOLES ARE DRILLED & THREADED PREHEAT & INTERRUN TEMPERATURE & AS 4458 REMAINING WELDING PARAMETERS SHALL BE AE-00-SM-001 MAINTAINED IN ACCORDANCE WITH QUALIFIED WPS. ENSURE WELDERS REQUIRED QUALIFICATION FIT UP & WELDING OF ALL NONREMOVABLE INTERNALS 2.7 COMPLETE VISUAL INSPECTION INSIDE THE VESSELS PRIOR TO WELDING CLOSING HEAD Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL ACCEPTENCE VERIFICATION INSPECTION CRITERIA JORD JORD CLNT Bellows AS 4037 SEC8 NDE NDE REPORT W WS I PROCEDURES PV1 AS 4037 SEC8 NDE NDE REPORT W WS R PROCEDURES AE-00-SM-001 AS 4458 VISUAL W WS I AE-00-SM-001 INSPECTION APPD. WELD MAP, WPS & DRG AS 4458 UPDATED WELD W WS I PV1 MAP/ TRACEABILITY RECORD AS PER FABRICATION DRAWINGS & APPROVED APPROVED DRAWINGS WELDING PROCEDURE AS 4458 PV1 ENSURE ALL INTERNAL WELDS ARE CONTINUOS JORD STANDARD & DOUBLE SIDED.ENSURE ALL BURRS & SHARP PV1 CORNERS ARE REMOVED FROM INTERNALS.INSIDE OF THE VESSEL SHALL BE FREE FROM DEBRIS, METAL SHAVING ETC.. GOOD ENGINEERING PRACTISE NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE UPDATED WELD MAP/ TRACEABILITY RECORD VISUAL INSPECTION W WS I W W I Page 12 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators 2.8 FIT-UP OF END PLATES TO HEADER ASSEMBLY JOINT PREPARATION AS PER DRAWING & AND FREE OF RUST, SCALE, MOISTURE, GREASE & DIRT. JOINT SIZED, MATCHED, ASSEMBLED & ALIGNED AS PER DRAWING. END PLATE BUTTING WITH PARTITION PLATE RESULTING IN ZERO GAP QA/QC ACTIVITY SPECIFICATION STANDARD ACCEPTENCE CRITERIA Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows VISUAL W WS I INSPECTION AS 4458 AE-00-SM-001 AS 4458 AE-00-SM-001 APPD. WELD MAP, WPS & DRG API 661/ISO 13706 APPROVED DRAWING NO GAP INSPECTION APPROVED DRAWING REPORT W W I 2.9 WELDING OF END PLATES TO HEADER PREHEAT & INTERRUN TEMPERATURE & AS 4458 ASSEMBLY REMAINING WELDING PARAMETERS SHALL BE AE-00-SM-001 MAINTAINED IN ACCORDANCE WITH QUALIFIED WPS. ENSURE WELDERS REQUIRED QUALIFICATION AS 4458 AS 4037 AE-00-SM-001 UPDATED WELD MAP/ TRACEABILITY RECORD W WS I 3 NDE OF END PLATES TO HEADER ASSEMBLY COMPLETE WELD VISUAL INSPECTION AS 1210 AS 4037 AE-00-SM-001 AS 4037 AE-00-SM-001 VISUAL INSPECTION W WS I 100% VISUAL INSPECTION OF BACKSIDE OF ROOT PASS 100% UT ON COMPLETED WELDS API 661/ISO 13706 AE-00-SM-001 AS 1210 API 661/ISO 13706 VISUAL INSPECTION NDE REPORT H W I W WS I 100% MT ON COMPLETED WELDS API 661/ISO 13706 AE-00-SM-001 COMPLETE FUSION & PENETRATION AS 4037 SEC8 NDE PROCEDURES AE-00-SM-001 AS 4037 SEC8 NDE PROCEDURES AE-00-SM-001 NDE REPORT W WS R NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE Page 13 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators QA/QC ACTIVITY SPECIFICATION STANDARD 3.1 FIT-UP, WELDING & NDE OF PREHEAT & INTERRUN TEMPERATURE & AS 4458 SECURING LUGS, SLIDE PADS & NAME REMAINING WELDING PARAMETERS SHALL BE AE-00-SM-001 PLATE BRACKETS MAINTAINED IN ACCORDANCE WITH QUALIFIED WPS. ENSURE WELDERS REQUIRED QUALIFICATION 3.2 NDE OF TEMPORARY ATTACHMENT REMOVAL AREA TRIAL FIT-UP OF REMOVABLE INTERNALS 3.3 POST WELD HEAT TREATMENT (PWHT) 3.4 HARDNESS TESTING ACCEPTENCE CRITERIA AS 4458 AS 4037 AE-00-SM-001 Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows UPDATED WELD W WS I MAP/ TRACEABILITY RECORD COMPLETE WELD VISUAL INSPECTION AS 1210 AS 4037 AE-00-SM-001 AS 4037 AE-00-SM-001 VISUAL INSPECTION W WS I 100% MT ON ALL PRESSURE BOUNDARY WELDS JORD STANDARD AE-00-SM-001 NDE REPORT W WS R 100% MT/PT AS 4458 AE-00-SM-001 AS 4037 SEC8 NDE PROCEDURES AE-00-SM-001 AS 4037 SEC8 NDE PROCEDURES AE-00-SM-001 AS PER APPROVED DRAWINGS NDE REPORT W WS R INSPECTION REPORT W WS R AS 4458 AE-00-SM-001 API 661/ISO 13706 AE-00-SM-002 AS PER APPD. HARDNESS PROCEDURE PWHT GRAPH W RA R HARDNESS REPORT W WS R ALL REMOVABLE COMPONENTS WHICH ARE JORD STANDARD DESIGNED TO PASS-THROUGH MANWAY SHALL PV1 BE TRIAL FITTED IN SHOP TO ENSURE ACCURACY & EASE OF ASSEMBLY & DISASSEMBLY AT THE FIELD AS PER APPROVED PWHT PROCEDURE API 661/ISO 13706 AE-00-SM-001 AS PER APPROVED HARDNESS PROCEDURE API 661/ISO 13706 AE-00-SM-002 NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE Page 14 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators 3.5 NDE AFTER PWHT 100% MT/PT OF ALL EXTERNAL WELDS 3.6 FINAL DRILLING OF TUBE AND PLUG HOLES AND FINAL MACHINING 3.7 DIMENSIONAL INSPECTION OF HEADERS QA/QC ACTIVITY SPECIFICATION STANDARD JORD STANDARD AE-00-SM-001 AE-00-SM-002 100% UT ON END PALTES AND TOP & BOTTOM AS 1210 PLATE WELDS API 661/ISO 13706 CHECK ALL THE TUBE HOLES WITH GO NO GO API 661/ISO 13706 GAUGE AE-00-SM-002 CHECK ALL THE THE TUBE HOLES FOR HOLE FINISH & CHAMFER MEASURE THE DIMENSIONS OF TUBE HOLES AT RANDOM FULL & FINAL DIMENSIONAL INSPECTION OF API 661/ISO 13706 HEADERS AE-00-SM-002 AE-00-SM-001 ACCEPTENCE CRITERIA AS 4037 SEC8 NDE PROCEDURES AE-00-SM-001 AS 4037 AE-00-SM-001 NDE PROCEDURES API 661/ISO 13706 APPROVED DRAWINGS Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows NDE REPORT W WS R NDE REPORT W WS I INSPECTION REPORT W WS I API 661/ISO 13706 APPD. DRAWINGS AE-00-SM-002 INSPECTION REPORT W W WS 3.8 HEADER BOX CLEANING THOROUGH VISUAL INSPECTION OF HEADERS FOR EXTERNAL AND INTERNAL CLEANLINESS API 661/ISO 13706 AE-00-SM-002 FREE FROM DEBRIS VISUAL INSPECTION W WS I 3.9 PAINTING OF HEADERS (FULL COAT ON TUBE SHEET ONLY) AS PER APPROVED PAINTING PROCEDURE PO EQUIPMENT DATASHEET AE-00-SM-002 GP-00-SG-002 APPD. PAINTING PROCEDURE PAINTING REPORT W WS I F FABRICATION OF STEEL STRUCTURES (INCLUDING BUNDLE FRAME & PLENUMS, FAN RINGS, MACHINERY MOUNTS, WALKWAYS, LADDERS & GUARDS) NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE Page 15 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators 1 RECIEPT INSPECTION OF STRUCTURALS & FASTENERS REVIEW OF MILL TC DIMENSIONAL & VISUAL INSPECTION QUANTITY AS PER PO VISUAL & DIMENSIONAL INSPECTION OF FASTENERS DIMENSIONAL INSPECTION CHECK BENDING SURFACE FOR ANY CRACKS 1.1 PLATE & SECTIONS CUTTING, DRILLING,PUNCHING AND BENDING 1.2 FIT-UP, WELDING & NDE OF STEEL STRUCTURES QA/QC ACTIVITY SPECIFICATION STANDARD PO AE-00-SM-002 AS/NZS 1554.1 APPROVED DRAWING VISUAL INSPECTION I I I AS/NZS 1554.1 APPD. DRAWING VISUAL INSPECTION NDE REPORTS I I R PO APPROVED DRAWINGS INSPECTION REPORT W WS I PO APPROVED DRAWINGS INSPECTION REPORT W W NA PO GALVANIZING PROCEDURE GALVANIZING PROCEDURE GALVANIZING REPORT I/RA 1/RA R WELDING PARAMETERS & CONSUMABLE PER JORD STANDARD APPROVED WPS AE-00-SM-002 ENSURE REQUIRED WELDER QUALIFICATION 100% VISUAL INSPECTION OF WELDS 100% UT OF FULL PENETRATION WELDS OF LIFTING PAD EYES 100% MT OF LIFTING PAD EYE WELDS 10% MT OF OTHER FULL PENETRATION WELDS 1.3 DIMENSIONAL INSPECTION BEFORE & VERIFY ALL THE MAJOR DIMENSIONS AFTER COATING INCLUDING FAN RING CIRCULARITY.CHECK FOR ANY DISTORTION 1.4 TRIAL ASSEMBLY STRUCTURES OF ONE BAY PER ITEM/UNIT SHALL BE ASSEMBLED BEFORE COATING TO ENSURE PROPER MATCHING 1.5 HOT DIP GALVANIZING CHECK FOR COMPLETE COVERAGE DRY FILM THICKNESS & SURFACE FINISH DROSS REMOVAL AREAS REQUIRING TOUCH-UP NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL ACCEPTENCE VERIFICATION INSPECTION CRITERIA JORD JORD CLNT Bellows APPROVED DRAWING MILL TC W WS R MATERIAL SUB ORDER Page 16 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators 1.6 INTERNAL CLEANING ENSURE PROPER INTERNAL CLEANLINESS FREE FROM METAL SHAVINGS/BURRS, DIRT, DEBRIS ETC. 1.7 RECEIVING INSPECTION OF BOUGHT OUT ITEMS SUCH AS MOTOR, HOUSING, FAN BLADES, SHAFT, VELOMETER ETC 1.8 PRESSURE TEST (HYDRO TEST) QA/QC ACTIVITY SPECIFICATION STANDARD AE-00-SM-002 ACCEPTENCE CRITERIA NO VISIBLE DIRT & LOOSE DEBRIS VERIFY HYDROSTATIC TEST PRESSURE AS 1210 VERIFY REQUIRED WATER QUALITY AE-00-SM-001 ENSURE CALIBRATION OF PRESSURE GAUGES CHECK VISUALLY FOR ANY LEAK & DISTORTION AS 4037 AE-00-SM-001 HYDRO TEST PROCEDURE 1.9 DRAINING OF TUBE BUNDLES DRAIN THE TEST FLUID COMPLETELY BLOW DRY COMPRESSED AIR TO REMOVE COMPLETE WATER 2 FIXING OF NAMEPLATE 2.1 FINAL PAINTING 2.2 UNIT ASSEMBLY Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL VERIFICATION INSPECTION JORD JORD CLNT Bellows VISUAL W I I INSPECTION H H H AE-00-SM-001 VISUAL NO TRACES OF WATER INSPECTION W I I VERIFY NAME PLATE DETAILS AS PER DRAWING ASME SEC VIII DIV 1 ENSURE FITTING OF NAME PLATE TO RIGHT AE-00-SM-001 EQUIPMENT APPROVED DRAWING NAME PLATE RUBOFF OR PHOTOGRAPH W W I AS PER APPROVED PAINTING PROCEDURE APPD. PAINTING PROCEDURE APPROVED DRAWINGS API 661/ISO 13706 PAINTING REPORT W WS WS INSPECTION REPORT W WS I PO AE-00-SM-002 AE-00-SM-001 AE-00-SM-002 EQUIPMENT DATA SHEET ASSEMBLED UNIT DIMENSIONAL CHECK AS PER API 661/ISO 13706 DRAWING INCLUDING FAN RINGS ALIGHNMENT AE-00-SM-002 OF FAN SHAFT/DRIVE ASSEMBLY ENSURE MATCH MARKINGS OF STRUCTURE NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE PRESSURE TEST REPORT Page 17 of 18 INSPECTION AND TEST PLAN (ITP) Client :xxx Project : Job Number : P.O.Number : No MANUFACTURING/INSPECTION DESCRIPTION Sample ITP for Separators 2.3 PACKAGING AND TRANSPORTATION AS PER APPROVED PACKING PROCEDURE API 661/ISO 13706 AE-00-SM-002 2.4 MANUFACTURERS DATA REPORT, FINAL RELEASE & DISPATCH COMPILATION, REVIEW & ISSUE OF MDR AND FINAL RELEASE NOTE AS APPLICABLE CLIENT SPECIFICATION AS 4458 AE-00-SM-002 QA/QC ACTIVITY NOTE : FOR ABBREVIATIONS/LEGENDS REFER COVER PAGE SPECIFICATION STANDARD Date :27/05/2008 Document No : Revision :0 Action :FOR APPROVAL ACCEPTENCE VERIFICATION INSPECTION CRITERIA JORD JORD CLNT Bellows PACKING PROCEDURE VISUAL W W R AE-00-SM-002 INSPECTION AS 4458 APP C AE-00-SM-002 MDR/RELEASE NOTE RA RA RA Page 18 of 18
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )